Forecast Consumption
Last tested: 2026-10-06
Routes: /x/settings/planning, /x/production/demand-forecasts,
/x/production/planning, /x/inventory/quantities
Prerequisites
- An item with open sales order lines in status
To ShiporTo Ship and Invoice, each with a promised date, and with no forecast of its own. MRP reads only these statuses (openSalesOrderLines). AConfirmedorIn Progressorder is not demand. - In the Carbon Development company, SAW-001 (
item_5gqknUZj6kFeQn4fxTHz5a) at Manufacturing Plant (loc_U6GKN77Hz2XnBM8h9hSyFv) fits: 3 lines of 30, promised 10/14, 11/4 and 11/25. Check the dates again before each run, because they move. - Ask the user before you create the forecast. The test writes to the database.
Steps
1. Settings card (read-only)
- Open
/x/settings/planning. - Expect the "Forecast Consumption" card with "Look back (weeks)" = 4 and "Look ahead (weeks)" = 1.
2. Create the forecast
- Open
/x/production/demand-forecasts/new. - Item (first combobox): click it, type the part number, click the option.
- Location (second combobox): check that it shows the right location.
- Fill the weeks. The hidden inputs are 0-based: "Week 2 (10/11)" is
week1.- In the 2026-10-06 run: Week 2 = 20, Week 4 = 30, Week 9 = 10, Week 10 = 15.
- Click another week input after each fill, so the value commits.
- requestSubmit the form whose button includes "Create Forecast".
3. Baseline before MRP
- Open
/x/production/planning?location=<loc>&search=<part>. - Expect "Qty to Order" = sales orders + full forecast (165 in the 2026-10-06 run). A new forecast counts at full value until the next run.
4. Run MRP
- Click "Recalculate" (top right of Material Planning). No dialog opens.
- Poll
demandProjection.consumedQuantityuntil it changes. It took under 10 s.
5. Verify
| Surface | 2026-10-06 expected and seen |
|---|---|
demandProjection.consumedQuantity |
20, 30, 10, 0 |
| Material Planning "Qty to Order" | 105; actions Make 30 (10/11) + 60 (11/1) + 15 (12/6) |
| Demand forecast edit drawer | "20 consumed", "30 consumed", "10 consumed" under the inputs |
| Inventory quantities "Demand Forecast" | 105 (90 actual + 15 forecast remainder) |
/api/items/<id>/<loc>/forecast → demandForecast |
only the 12/6 row, quantity 15 |
demandProjection.updatedAt |
unchanged by the MRP run |
6. Clean up
- On
/x/production/demand-forecasts, open the row's "Actions" menu. - Click "Delete", then click "Delete" in the dialog.
- Click "Recalculate" on Material Planning again.
- Expect "Qty to Order" back at the sales-order total (90).
Test: 0/0 window
- On
/x/settings/planning, set "Look back (weeks)" and "Look ahead (weeks)" to 0. The last 2 textboxes on the page are these fields. requestSubmit the form ofinput[name=backwardPeriods]. - Add a SAW-001 forecast: Week 2 = 20, Week 4 = 30, Week 9 = 10.
- Click "Recalculate". On 2026-10-06: consumed 20, 0, 0, and Qty to Order 130.
- Set 4 / 1 again and click "Recalculate". Expect consumed 20, 30, 10, and Qty to Order 90. This proves that the next run heals the result.
- Delete the forecast.
Test: late orders consume no forecast
- Use a part with no other demand. On 2026-10-06: ANT-PATCH-01
(
item_8ErCmrbQ6o6EPQabHXDKMt). - Add a forecast of 25 in Week 1 (the current week).
- Create a sales order at
/x/sales-order/new. Customer: "Apex Space Research". - Add a line at
/x/sales-order/<id>/new: the part, quantity 10, a promised date in the current week. Type the date into the day segment asDDMMYYYY. - Click "Confirm", then requestSubmit the "Confirm" button in the dialog. The confirm action runs MRP. Expect consumed 10 and Qty to Order 25.
- Click "More options" → "Reopen". Open
/x/sales-order/<id>/<lineId>/details. Set the day to a date before the current week. Save. - Confirm again. Expect consumed 0 and Qty to Order 35 (10 + 25).
- Check that
demandActual.updatedAtis later than the order's confirm time. Then you know that the run counted the order. - Clean up: Reopen, then "More options" → "Delete Sales Order". Delete the forecast. Click "Recalculate".
Leftovers after cleanup: deleting a sales order keeps its opportunity row and
the confirm PDFs in storage (<companyId>/opportunity/<oppId>/). MRP sets a
demandActual row to 0. It does not delete the row.
Selector Notes
/x/production/demand-forecasts/delete/<item>/<loc>is an action-only route. A GET shows raw JSON. Delete through the row menu.- The "Recalculate" button has no confirmation. Find it with
snapshot -i. agent-browser screenshot <path>needs an absolute path.
Common Failures
A
To ShiporTo Ship and Invoiceorder is locked. Reopen it before you edit a line.If the dev server rebuilds (for example after another session changes files), the browser can hang. Check
psfor thereact-router devprocess. When its CPU use drops, open the page again.An item whose sales orders are
ConfirmedorIn Progressshows them in the Inventory "On Sales Order" column, but MRP ignores them. Nothing is consumed.