Forecast-First Finite Scheduling
Last tested: 2026-08-18 Routes: /x/resources/work-centers/:id, /x/job/:id, /x/priority/people?view=capacity, /x/priority/dates, /x/priority/operations, MES /x/operations + /x/operation/:opId
Prerequisites
- At least one work center, one job, and location shifts seeded (dev seed has these).
- Slack badge on the job header only shows once
job.projectedCompletionAtis set (requires a regen wave to have run for that job's location). Expedite works regardless.
Scenarios
(a) Work center operating hours + alwaysOn
- Navigate —
/x/resources/work-centers, click a work-center row → edit form. - Verify — the form has an "Operating shifts" multiselect (placeholder "Select" when empty) and a "Runs 24×7 (lights-out)" switch below the Processes field.
- Toggle the 24×7 switch,
requestSubmitthe form whose button reads "Save". - Reopen the same work center URL → the switch is
aria-checked=true(persists).
(b) Job header — slack badge + Best case what-if
- Navigate —
/x/production/jobs(NOT/x/jobs— 404), click a job (e.g. J000001). - The header renders at
/x/job/:id/details. A slack badge ("Nd early/late" with a "Projected completion" tooltip) shows only when the job has a projectedCompletionAt. - Open the "More options" menu → click "Best case…".
- Verify — a "Best case {jobId}" dialog opens showing "Current projection" and "Best case projection" (calls the schedule edge function with expediteJobId, persists nothing). A non-released job shows "Not scheduled" gracefully.
(c) Capacity view — Scheduled vs Available on one basis
- Navigate —
/x/priority/people?view=capacity. - Verify — SCHEDULED and AVAILABLE series; a station with no assignments shows its calendar hours (e.g. "9h free"), NOT 0 (the fallback-cliff fix). Sub-tabs "Load" and "Due (by due date)". An assumption banner ("Hours assumed from location shifts" for rung 2, or "No shifts configured — assuming Mon–Fri, 8h days" for rung 3).
(d) Dual dates — op due (need-by) vs projected completion
Prerequisite: a released multi-op job. Seed item BUS-STR-001 (3-op routing) via
/x/job/new (item combobox → "BUS-STR-001", deadline "Medium Priority Soft Deadline"
reveals a month/day/year date field; fill + blur commits hidden dueDate), then
Release → "Release Job" confirm. Release itself triggers a schedule run.
- BOP rows — /x/job/:id/details "Bill of Process" card. Each op row: the due-date
picker is
button[aria-label="Calendar"]whose text is the date; the forecast is a plain span "Projected {date}" —text-muted-foregroundwhen on target,text-amber-500+ tooltip "Behind target by N day(s)" when projected > due. The span is absent whenprojectedCompletionAtis null (e.g. an op with a placement conflict like "No qualified operator" never gets a forecast). - Regen wiring — any schedule input change fires
carbon/schedule.inputs.changed→mark-schedule-stale→schedule-replan-wave(~30 s debounce). Poll the DB (jobOperation.dueDate/projectedCompletionAt) rather than sleeping a fixed 90 s. - Job due-date change — /x/priority/dates card's own Calendar button posts the same
update as the drag (dnd-kit drag via
agent-browser mousedoes NOT take). Moving the job due earlier tightens op dueDates on the next wave; projections stay byte-identical when placement is unchanged. - Pin — picking a date in a BOP op's Calendar writes
dueDate+manuallyScheduledimmediately. The pin SURVIVES later waves and upstream ops re-derive from the pinned op's target start. NOTE: the pin route (/x/job/methods/operation/due-date→updateJobOperationDueDate) does NOT firenotifyScheduleInputsChanged— upstream re-derivation only appears after the next wave from some other input. The popover "Clear" button unpins (null due + manuallyScheduled=false). - Behind-target amber — a maintenance dispatch with "Takes work center offline"
(planned window covering the placement) slips projections past the targets: BOP +
/x/priority/operations ItemCards + MES op detail all flip to
text-amber-500"Proj. {date}" with the "Behind target by N day(s)" tooltip, while op dueDates stay byte-identical. Completing the dispatch reverts projections on the next wave. - Best case dialog — "First behind target: {op} (due X, projected Y)" is appended to the bottleneck sentence ONLY when the JOB itself is late (projected day > job due). The expedite call can take ~20 s under the local edge-runtime CPU cap — re-read the dialog until "Calculating best case…" resolves.
- MES — /x/operations board cards sort by due date/priority (never projection); card link → /x/operation/:opId, whose Due Date card shows the "Proj. {date}" line.
Selector Notes
- The 24×7 field is
switch "Runs 24×7 (lights-out)"; check state viabutton[role=switch][aria-checked=true]. - Login: the "Sign in with Email" button stays disabled until the email input registers
in React state — real keystrokes (
agent-browser type) enable it; a rawfillmay not. - Jobs list is
/x/production/jobs; job detail is/x/job/:id.
Common Failures
/x/jobs→ 404. Use/x/production/jobs.- Best case shows "Not scheduled" for Draft/Planned jobs — correct (the edge function only schedules Ready/In Progress/Paused jobs; expedite returns null for others).
- Popovers (BOP date picker, dispatch work-center combobox) close between agent-browser
CLI invocations (live revalidation re-renders). Do open + option-click in ONE
agent-browser eval(dispatch pointerdown/mousedown/pointerup/mouseup/click on the option). The "Takes work center offline" Radix switch also needs that full pointer sequence — a bare.click()does not toggle it. agent-browser typesilently drops "." characters (e.g. in emails) — usefill.- The shared
defaultagent-browser session may be owned by another worktree's agent — setAGENT_BROWSER_SESSION=<name>for an isolated browser (and close only YOUR session). - Dev-only hydration failure marks the tab title "Error" on /x/priority/dates while the
board still renders client-side — read
document.body.innerText, not the title. - Seed work centers have zero
workCenterShiftrows: an op whose need-by falls at/before today runs away ~1 year per subtracted working day (MAX_CONSECUTIVE_CLOSED_DAYS cap in need-by-calculator.ts) — e.g. a first op showing "Aug 10, 2024". Known bug surfaced 2026-08-18, not a test regression.
Require-staffing policy (per-location) — verified 2026-08-21
Setting: Settings → Production → Scheduling card (/x/settings/production) lists
the CURRENT company's locations, each with a "Require staffing" switch
(company-scoped — a same-named location in another company is NOT shown). Backed by
location.requiresStaffing, written service-role (settings admins lack resources_update).
Toggle it (Radix switch needs the full pointer sequence, not .click())
sw = [...document.querySelectorAll('button[role=switch]')] // Scheduling switches are the LAST N (one per location)
// dispatch pointerdown/mousedown/pointerup/mouseup/click at the switch center
Verify: toast "Staffing requirement enabled/disabled" + DB location.requiresStaffing.
Verify on the forecast (force regen with the Regenerate button, don't wait 30s)
- Regenerate = IconButton aria-label "Regenerate" inside a fetcher form →
form.requestSubmit(btn). - ON: an ungated op on a non-lights-out work center with NO manning on the placement
date becomes an unschedulable PLACEHOLDER (
capacityReservation.isPlaceholder=t, scheduleNote "No operator assigned"). Forecast header shows "N CAN'T BE SCHEDULED"; clicking the op row → detail sidebar "Unschedulable / No operator assigned / where it would run". - Lights-out exempt: set a work center
alwaysOn=true→ its ops still place (ph=f) while non-alwaysOn WCs' ops stay placeholders. (My Deno gate:capacity.workCenter.alwaysOn.) - OFF: regen → all ops place again (ph=f), header "no conflicts". Byte-identical to pre-setting.
- WC popover ("How are these hours calculated?" info button) gained a line: gated → "runs ability-gated work…", ungated → "runs work with no ability requirement…"; plus a "Staffing required" section only when the location's policy is ON.
KEY UX GOTCHA (not a logic bug, but reads as "empty/broken")
The forecast opens on today's Day view. Forward-ASAP places Ready jobs at the next
available shift — if today is Friday afternoon/weekend, work lands on next Monday, so
the default view shows "0 resources · 0 reservations · 0 jobs" even though work IS
scheduled. Navigate to the week that actually contains the placements
(?range=week&date=<placement date>) to see it. Placeholders (unschedulable ops) pin at
now, so they appear in the CURRENT week even when the real placements are a future week.
Test-data note (dev seed, company "Carbon Development" / Manufacturing Plant)
- Jobs J000002 (Ready, 3 ops) + J000004 (Ready, 3 ops) at Manufacturing Plant; all ops UNGATED (processes: Machining/Weld/Final assembly — requiresAbility=false). Only "Brake Press" is gated, on "Press Brake - 700T" (no job op → the floater/double-booking edge cases 1–2 aren't reproducible from seed; they're covered by the Deno suite).
- Manning (
peopleAssignment) is all PAST (Aug 10–14) at CNC Mill / Press Brake — does not cover the Aug-24 placements, which is why require-staffing ON makes everything unschedulable.