Item revision inherits planning, purchasing and supplier parts
Last tested: 2026-10-05 Routes: /x/part/{itemId}/details · /x/part/{itemId}/purchasing · /x/part/{itemId}/planning · /x/part/{itemId}/costing · /x/items/change-notice/{coId}/{affectedId}/details
Prerequisites
- A demo dataset is applied (satellite works): it seeds Buy parts with one supplier part and one price break each (BRG-6201, RW-010, ...) and Make parts with a BOM (PCB-ADCS-R1).
- Two locations exist, so the planning copy can be checked per location.
- No "Buy and Make" part is seeded: test the purchasing/planning copy on a Buy part and the manufacturing copy (Batch Size, Scrap Percent, Lead Time, BOM) on a Make part.
Steps
1. Give the source recognisable values
- Buy part, Purchasing tab: open the first combobox (Preferred Supplier), pick the option;
fill the Lead Time textbox;
requestSubmitthe form that holdsinput[name=preferredSupplierId]. Toast: "Updated part purchasing". - Planning tab: fill Accumulation Period, Safety Stock, Minimum Order Quantity; blur;
requestSubmitthe form that holdsinput[name=reorderingPolicy]. Toast: "Updated part planning". The form edits ONE location (the selected one); the other keeps its values. - Accounting tab (
/costing): open the Item Group combobox, pick a group;requestSubmitthe form that holdsinput[name=itemPostingGroupId]. Toast: "Updated part costing". - Make part, Details tab: the Manufacturing card has Batch Size, Scrap Percent, Lead Time;
requestSubmitthe form that holdsinput[name=lotSize]. Toast: "Updated part manufacturing".
2. New Revision
- On the part page, the left explorer has Revisions N followed by a Create button (on a Make part it is under the Used In tab). Click Create.
- Modal "New Revision": fill the textbox with the label;
requestSubmitthe form that holdsinput[name=copyFromId]. Action is/x/items/revisions/new. - Verify: redirect to
/x/part/{newItemId}/details; Purchasing, Planning and the Manufacturing card show the source's values; the Supplier Parts grid lists the source's supplier.
3. Duplicate label
- Create the same label again. Verify: stays on the page, toast "Failed to create revision".
4. Delete the revision
- Header More options → Delete Part → dialog "Delete {id}" →
requestSubmitits form. - Verify: redirect to
/x/items/parts, toast "Successfully deleted item".
5. Revision through a change notice
- In the New Revision modal click the Open a change notice switch before submitting. The
form action becomes
/x/items/change-notice/new-from-item/{itemId}. - Verify: redirect to the new change notice, toast "Change notice created"; on the affected item's line the Supplier Parts grid is pre-filled and Changes reads "No changes yet."
- Edit the draft's supplier part: open
{line url}/{supplierPartId}(drawer "Edit Supplier Part"), fill Unit Price / Supplier Part ID,requestSubmitthe form that holdsinput[name=supplierId]. Verify: Changes → Supplier Parts shows one Modified entry with old → new values.
6. Discard the draft
- Explorer row → More → Delete (acts at once, no dialog), or header More options → Delete Change Notice → confirm. Verify the draft revision item no longer exists.
- Change type: pick another type in the Change type combobox, then
requestSubmitthe form whose submit button reads Apply (the selection alone does nothing).
Selector Notes
- The Revisions Create button is the
Createthat directly followsRevisions Nin the snapshot; the topbar also has aCreatebutton. - The page can still be rendering right after
networkidle: wait ~1.5 s before grepping the snapshot for the Revisions section. - The Changes card labels a supplier by raw id for a moment after load, then by name once the suppliers store hydrates. Re-snapshot before reading it.
- Confirm dialogs: find the dialog's button whose text starts with "Delete" and
requestSubmitits form.
DB verification (the real proof)
-- source vs new revision: replenishment, per-location planning, item group, suppliers
select i.revision, r."lotSize", r."scrapPercentage", r."leadTime", r."preferredSupplierId"
from "itemReplenishment" r join item i on i.id = r."itemId" where r."itemId" in (:src, :rev);
select l.name, i.revision, p."reorderingPolicy", p."demandAccumulationPeriod",
p."demandAccumulationSafetyStock", p."minimumOrderQuantity"
from "itemPlanning" p join item i on i.id = p."itemId" join location l on l.id = p."locationId"
where p."itemId" in (:src, :rev) order by 1, 2;
select i.revision, sp."supplierId", sp."unitPrice",
(select count(*) from "supplierPartPrice" p where p."supplierPartId" = sp.id) as breaks
from "supplierPart" sp join item i on i.id = sp."itemId" where sp."itemId" in (:src, :rev);
Common Failures
- Saving an inherited supplier part whose unit of measure was empty writes "EA", so the change notice diff also lists "Purchasing unit — → EA" next to the field you meant to change.
- Deleting a supplier part that has price breaks fails with "Failed to delete supplier part"
(
supplierPartPrice → supplierPartis ON DELETE RESTRICT;deleteSupplierPartis a plain delete). - Deleting a change notice whose New Part sits on another affected item's draft BOM fails with
"Failed to delete change notice" (
methodMaterial.itemId → itemis ON DELETE RESTRICT). Nothing is half-deleted. Remove the BOM line first.