Skip to content

Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.

4.3 KB
Raw Blame

Material Supersession

Last tested: 2026-06-24 Routes: /x/part/$itemId/planning (config), /x/purchasing/planning, /x/production/planning (Recalculate)

What the feature does

Redirects demand from a discontinued item to its successor during MRP, and swaps superseded components at job creation. Config lives on the Part → Planning tab (ItemSupersessionForm). Modes: Consume First, Prefer New, Stock Only, No Stock. Fields: supersessionMode, discontinuationDate, successorItemId, successorEffectivityDate, conversionFactor; minimumReserveQuantity lives on itemPlanning (per location).

ENVIRONMENT GOTCHAS (critical)

  • The claude.ai Carbon MCP server points at a hosted instance (company "Acme Inc.", id SMBHQP55…) — NOT this branch's local DB. Do NOT use MCP items_upsertPart for local browser testing; the parts land in the wrong database/company.
  • The browser dev-bypass ([email protected]) is an employee of local company "Carbon Development" (id d8u703oeq0gg2jnc1k2g) only. Local DB: localhost:<port> from .env.local SUPABASE_DB_URL.
  • The shared agent-browser is used by ALL worktree agents at once; another worktree will hijack the active tab. Pin every command with agent-browser tab <n>.
  • Combobox/option refs re-render on async chart loads — snapshot+click must be in the SAME bash command, or refs go stale ("Unknown ref").

Fast fixture setup (local DB, bypasses contended browser)

Parts: insert item (type Part) + part rows directly — the trg_event_after_sync_item AFTER INSERT trigger auto-creates itemCost/itemReplenishment/itemPlanning/makeMethod.

  • itemSupersession: one row per old item (mode, successorItemId, discontinuationDate ≤ today, successorEffectivityDate ≤ today, conversionFactor).
  • BOM: methodMaterial rows on the parent's makeMethod id (itemType 'Part', methodType 'Purchase to Order'/'Pull from Inventory').
  • On-hand: itemLedger (entryType 'Positive Adjmt.', itemId, locationId, quantity, companyId, createdBy).
  • Stock Only reserve: UPDATE itemPlanning SET reorderingPolicy='Fixed Reorder Quantity', reorderPoint=1, minimumReserveQuantity=N.
  • Demand: demandProjection (itemId, locationId, periodId, forecastQuantity) on the current week period. NOTE: independent (top-level) demand on a leaf Buy item does NOT surface in planning output — only BOM-derived (dependent) demand does. To test redirection put the old item in a parent's BOM.

Run MRP (= the Recalculate button)

POST https://api.<branch>.dev/functions/v1/mrp with header Authorization: Bearer <SUPABASE_SERVICE_ROLE_KEY>, body {"type":"company","id":"<companyId>","companyId":"<companyId>","userId":"<userId>"}. First call also creates the weekly period rows. Returns {"success":true}.

Inspect / assert

  • demandForecastSource (cols: itemId=successor, redirectedFromItemId=old, parentItemId, quantity in successor units) — the redirection lineage.
  • get_purchasing_planning(company_id, location_id, periods[]) and get_production_planning(...) — quantityToOrder, supersessionMode, minimumReserveQuantity. periods[] = select id from period where "periodType"='Week' order by "startDate" limit 18.
  • Job substitution: insert a public.job row, invoke get-method body {"type":"itemToJob","sourceId":"<itemId>","targetId":"<jobId>","companyId":..,"userId":..}, then read jobMaterial.substitutedFromItemId / substitutionFactor.

Browser verification (after data is set up)

  • Purchasing/Production Planning tables show successors with "Order N"/"Make N"; old parts absent.
  • Recalculate button (top of planning page) disables while running, re-renders same results.
  • Part → Planning → Supersession shows mode + successor (with PHASE-OUT/OBSOLETE/SPARES-ONLY badge).
  • Chain: a part whose successor is itself superseded shows "Supersession chain detected: A → B → C".
  • Self-supersession: the successor picker excludes the part itself.

Expected results for the canonical fixture (FG BOM consumes OLD1×1, OLD2×2, CHAIN-A×1, M-OLD×1; FG demand 100)

  • NEW1 = 100 (Prefer New, factor 1) | NEW2 = 400 (Consume First, factor 2: 200×2)
  • CHAIN-C = 100 (chain A→B→C collapse) | M-NEW = 100 in production planning (Make→Make)
  • SPARE = 80 (reserve 100 − on-hand 20) | OLD1/OLD2/CHAIN-A/B/OBS/M-OLD excluded