Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.
Period Runs (revenue recognition and depreciation)
Last tested: 2026-10-04 Routes: /x/accounting/revenue-recognition-runs, /x/revenue-recognition-run/, /x/accounting/depreciation-runs, /x/depreciation-run/
Prerequisites
- Revenue recognition needs Planned
revenueRecognitionSchedulerows. A fresh demo dataset has none; insert Deferral rows on a posted invoice line (debitaccountDefault.deferredRevenueAccount, creditsalesAccount) or post a Service invoice with service dates. - Depreciation needs Active fixed assets; the demo DR000001 Draft is stale after the per-month change, so Post refuses it until Recalculate.
- Use an isolated browser session (
AGENT_BROWSER_SESSION=<name>) — other Conductor sessions share the default one and navigate it away mid-test.
Steps
1. New run — "New Run" opens a modal with a date picker that writes a hidden
input[name=periodEnd]. Set that value, then requestSubmit the modal form.
- A month after the current one → toast " has not started yet."
- A period that already has a Draft → redirect to it, " is already a draft".
2. Post — requestSubmit the form of the "Post" button (header, Draft only).
- Stale Draft → "… is out of date …; recalculate it before posting".
3. Recalculate — header button beside Post (Draft only), then the dialog's
"Recalculate" button (requestSubmit its form). Toast "Recalculated : N lines".
4. Reverse Run — "More options" (⋮) → menuitem "Reverse Run" → dialog button
"Reverse Run" (requestSubmit). Toast "Reversed . It is a draft again."
5. Close checklist — /x/accounting/periods//close. The two run
tasks show "N entries to recognize · $X" / "N assets to depreciate · $X" and "Post draft run " links. Create Run shows only when something is due and the period has no Draft run; it redirects to the new Draft.
- Nothing due: the action refuses ("Nothing to depreciate for this period" /
"Nothing to recognize for this period") and creates no run. The button is
hidden then, so POST
intent=create-depreciation-runto<route>.datawith curl and the browser'scarboncookie; decode theset-cookieflash. - To see depreciation due on dev data, reverse and delete the latest run first, then Create Run and Post to restore it.
6. Verify in the database — journals per month (postingDate = month end, in
its own accountingPeriod), Active period unchanged, rows/assets restored.
Selector Notes
- Toasts disappear in ~3 s; poll
agent-browser snapshotevery 0.7 s after submit. - After a fetcher-driven action the page may not revalidate until reload.
Common Failures
- Vite overlay / 502 while another session edits files — wait and reload.
- Reverse Run refuses while another Draft holds the same revenue period.