Skip to content

Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.

3.9 KB
Raw Blame

Picked-Material Return Timing (job vs operation)

Last tested: 2026-08-04 Routes: ERP /x/settings/inventory, /x/picking-list/schedule, /x/picking-list/<id>/details, /x/job/<id>/details; MES /x/operation/<opId>

Prerequisites

  • Migration 20260804111631 applied (returnPickedMaterialTiming, quantityReturned).
  • A Make item whose method has ≥1 operation on a work center, one untracked BOM material (per-unit 1) with warehouse stock in a bin. For an OP-scope test the method needs 2 operations and the jobMaterial must be assigned to op 1 (jobMaterial.jobOperationId — no BOM UI for this yet; set via SQL fixture).
  • MES login is separate (same DEV_BYPASS email at MES_URL/login; retry the target URL after login — first redirect can bounce).

Steps

1. Policy setting (ERP Inventory settings)

  • Card "Returning unused picked material" = the 4th ChoiceSelect / 4th Save on the page. Hidden input input[name=returnPickedMaterialTiming] is truth.
  • Options: "At job completion" (job, default) / "At operation completion" (operation). Submit that form via requestSubmit → toast "Material return timing updated"; persists across reload.

2. Stage material

  • Create job (qty 2) → Release (confirm dialog "Release Job").
  • /x/picking-list/schedule → check "Select J00000N" → button "Generate Picking List 1" → redirects to the list details → click Pick (line badge → 2/2, list header Completed; jobMaterial.storageUnitId → lineside).

3. Produce partially + finish op (MES)

  • /x/operation/<opId>: big emerald submit button = Start (op → In Progress).
  • 1st button.bg-accent = "Log completed" modal → fill qty 1 → "Log Completed" (inserts productionQuantity; auto-backflushes untracked → quantityIssued 1; Consumption ledger row AT the lineside bin).
  • 2nd button.bg-accent = action sheet → "Finish" → "Finish Anyways" (1 < 2).
  • CAUTION: the sidebar "Add Inventory"/"End Operations" buttons are NOT the completion flow (manual adjustment / end-events).

4. Expected outcomes

  • policy=operation, op 1 of 2 finishes (job stays In Progress): immediate Transfer pair lineside→source for picked − max(issued, owed) where owed = (estimatedQuantity ÷ job qty) × op quantityComplete; pickingListLine.quantityReturned += returned; quantityPicked UNCHANGED (gross); list header stays Completed/Partial (no In Progress demotion); jobMaterial.storageUnitId restored to source when nothing staged remains.
  • policy=job, op finishes (non-last): NO return (quantityReturned stays 0).
  • last op finishes (either policy) or ERP job Complete button: job completes → backflush tops up from lineside → job-scope sweep returns the rest.
  • ERP Complete dialog: quantity field prefills 0 — fill the real completed qty (react-aria: fill + blur before requestSubmit "Complete Job").
  • ERP picking-list line shows a "Returned N" secondary badge (LuUndo2 icon).

Verification queries

SELECT "quantityPicked","quantityReturned",status FROM "pickingListLine" WHERE id='...';
SELECT "entryType",quantity,"storageUnitId" FROM "itemLedger" ORDER BY "createdAt";
-- lineside bin should net to 0 after job completion; source bin = initial − consumed

Selector Notes

  • MES op controls are unlabeled: emerald submit = Start; button.bg-accent[0] = Log completed; button.bg-accent[1] = action sheet (Scrap/Rework/Finish/…).
  • Settings ChoiceSelects have no accessible labels — target by position or the hidden input name.
  • Job release/complete confirm dialogs: buttons "Release Job" / "Complete Job".

Common Failures

  • MES first navigation lands on /login even with ERP cookies — log in there once, then re-open the operation URL.
  • ERP job operations table Qty-Complete cell editor would not open via click/dblclick in agent-browser — use the MES Log-completed flow instead.