Last tested: 2026-10-13 Routes: /x/production/planning, /x/purchasing/planning, /x/part/$itemId/planning

Prerequisites

  • Dev stack up and migrations applied (crbn migrate). A migration edited after its version was recorded is NOT re-applied; run the file with psql -f.
  • A Buy item with an open Order suggestion, a supplier part (conversion factor 1 keeps the drawer in inventory units), and policy Demand-Based Reorder.
  • A make-to-stock job (Planned/Ready) on an item with no demand, for the Cancel.
  • MRP has run at least once after the data exists (Recalculate button, or wait for the 3-hourly cron on the hour UTC).

Steps

1. Surplus item on Production planning (issue 10)

Open /x/production/planning?location=<plant>. The item with the demand-less job is listed with a "Cancel" chip in the Actions column. Expand the row: the line reads "Cancel job <J…>" with Review/Apply.

2. Purchasing planning loads (RPC)

Open /x/purchasing/planning?location=<plant>. Grid renders rows; the row's button reads "Order ".

3. Max order quantity splits (issue 6)

Open /x/part/<itemId>/planning?location=<plant>. In the Planning card set "Maximum Order Quantity" (react-aria number: fill, then click another field to blur; verify input[name=maximumOrderQuantity]). Submit with requestSubmit on the FIRST button whose text starts with "Save" (the card has its own form; a later Save belongs to Supersession). The save re-runs MRP. Back on Purchasing planning, click the row's "Order " button: Suggested Orders lists several rows each <= the maximum (2280 with max 1000 → 1,000, 1,000, 280), due dates spread across the week.

4. Order, then the chart (issues 2 and 9)

Click the drawer's "Order" button. PO lines are created with requiredDate only. Open the part planning tab: the "Incoming" card grows by the ordered quantity before any MRP run, and every new PO row in Supply & Demand shows a date (no "No due date").

5. Legend what-if (issue 7)

Read path.recharts-line-curve's d. Click the "Supply" legend button: d changes. Click again: d is identical to the first read.

Selector Notes

  • Legend buttons are plain buttons named "Projected on hand", "Safety stock", "Supply", "Planned", "Demand", "Demand Forecast" under the "Projected inventory" heading.
  • The planning card's number fields have no accessible name; locate by the "What is Maximum Order Quantity?" help button, the textbox follows it.
  • Summary cards: generic "Quantity on Hand", "Incoming", "Outgoing".

Common Failures

  • psql -c "a; b" prints only the last statement's result — one statement per call when reading probes.
  • A sizing function without the accumulation-period clamp spins forever on a stored period of 0; set statement_timeout on probes.