Strict Backflush
Last tested: 2026-10-15
Routes: /x/settings/items, /x/part/<itemId>/make/<makeMethodId>, /x/job/<jobId>,
/x/production/jobs, /x/picking-list/schedule, MES /x/operation/<jobOperationId>
Prerequisites
- Satellite demo dataset ("Carbon Development"). Manufacturing Plant has storage units A1-L1 … A3-L3 and lineside floors; Headquarters has a work center but NO storage unit.
- PCB-ADCS-R1 (
item_FGQD2WDhDcoMJWVDTNdEWV) has a 2-line BoM (PCB-BARE-REV3, MAT-CONFCOAT) and no open change notice. SAW-001 v2 is locked by a change notice — "Set as Active Version" is disabled there for an unrelated reason. - Seeded jobs (J000003 Planned, J000004 Draft) have no
jobMaterial.storageUnitId.
Steps
1. Settings — /x/settings/items → "Strict Backflush" card switch.
Expect "Strict backflush is on" and "1 active method has materials with no Pull From" with a link (SAW-001). Below it, "Prevent negative stock" (enabled only while strict backflush is on). Off: a short storage unit is drawn below zero and the operation completes; a missing storage unit is still refused.
2. Activation — part make page → version button ("V1 Draft") → hover "Version 1 Draft"
→ "Set as Active Version" → "Make Active". With gaps: toast "Set a Pull From storage unit before you activate this version:
3. Release — job page → "Release". With gaps the dialog shows "Missing Storage Units"
(one entry per part) and "Release Job" is disabled. Bulk: jobs list → row checkbox → selection-count button → "Release Jobs" → toast "Could not release 1: J000003 (set a Pull From …)".
4. MES completion — operation page → "Log completed" → "Increase" → "Log Completed".
Short bin: toast "Not enough A in BIN: need n, have m; Not enough B …" and NO
productionQuantity row. Covered bin: "Operation finished successfully", consumption only
from the line's bin.
5. ERP job complete — job page → "Complete" → "Increase" → "Complete Job".
Short bin: toast lists every short material (SQL backflush_job_materials).
6. Picked stock — /x/picking-list/schedule → select job → "Generate Picking List 1" →
"Pick" each line → MES completion consumes from the lineside bin, no refusal.
7. MES manual issue — operation page → material row "Issue Material" → "Issue".
Selector Notes
- BoM / job BoM line Storage Unit combobox does not open from an
agent-browser clickon its ref: read its rect withevaland usemouse move/down/upon it. - After a BoM line saves it collapses but its form stays in the DOM (hidden). Reload before editing a second line, or a ref match may land in the hidden form.
- Inventory adjustment modal: wait ~1 s after opening before clicking the storage unit combobox (the backdrop still covers it). If the storage unit is not chosen, the adjustment silently goes to the UNASSIGNED bin.
- Number fields (react-aria):
fillthenpress Tab, and check the hidden input.
Common Failures
- Saving a BoM line resyncs
methodTypeto the item's default (Buy items become Purchase to Order) — pre-existing behavior, not strict backflush.