Skip to content

Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.

13.6 KB
Raw Blame

Batch Aggregated Material Consumption Research: Best Practices Survey

Researched: 2026-09-15 · Prompted by: vertical-farming customer use cases (Work_Order_Stitching_Use_Cases.pdf + the harvest-merge cases) — "pick the material ONCE for a batch run spanning N jobs" (64 ml chemical, 6,500 seeds, 2 tray lots) instead of N per-job issues. Complements: .ai/research/job-operation-batching.md (composition/costing — its §5 established "consumption follows each order's own BOM") and .ai/research/batch-output-lot-identity.md (2026-08-27 — the OUTPUT-lot half of the same customer ask; single shared output lot = same-material, deliberate-act special case). This file covers only the INPUT side: the aggregated pick/issue.

Summary

Surveyed SAP (PP-PI campaigns, collective orders, Mill Order Combination, SAP DM process lots, EWM cross-order staging, batch where-used), Fulcrum, Steelhead, nesting write-back (SigmaNEST/ProNest), process ERPs (BatchMaster, Deacom, Aptean Ross), and pharma campaign weighing. Every system that supports cross-order runs converges on one model: the physical pick is aggregated at the run-level entity (work order / load / nest / campaign / combined order), while per-member attribution is derived — either as per-order ledger postings from the shared pick (SAP EWM staging, pharma campaign weighing) or as a costing/settlement-time allocation (Fulcrum bounding-box, SAP MILL_OC quantity distribution). No system makes the operator perform N picks, and no system loses per-order lot genealogy: one input batch consumed by N orders is recorded as N consumption postings referencing the same batch number. SAP's default (PP-PI campaign) aggregates only fixed setup/clean-out costs and keeps variable consumption per order; its true aggregate-then-split pattern (MILL_OC) exists but does it on a synthetic combined order settled back to the originals — the shape Carbon's spec already rejected (jobs are never merged).

Competitors Surveyed

  • SAP (PP-PI production campaigns, collective orders, Mill Order Combination / Combined Production Orders, SAP DM process lots, EWM cross-order staging) — enterprise reference; MILL_OC is the closest analog to combining N orders into one execution
  • Fulcrum — job-shop MES; its grouped work orders "pick once" with automatic cost allocation is the strongest direct match for the ask
  • Steelhead Technologies — plating MES; racks/loads span orders and customers daily; consumables consumed at tank/load level
  • SigmaNEST / ProNest — nesting write-back: the program owns the sheet issue
  • BatchMaster / Deacom / Aptean Ross — process-manufacturing ERPs (campaign / super batch concepts)
  • Pharma MES (BatchLine, LZ Lifescience) — "campaign weighing/dispensing", the cleanest process-industry analog for the aggregated seed/chemical pick

Key Consensus Patterns

1. One physical pick, owned by the run-level entity

  • Fulcrum: "Material items will now be picked once to the work order, creating a single clean pick transaction."
  • SAP EWM cross-order staging: open quantities of multiple Production Material Requests are summed into one consolidated requirement and staged to the Production Supply Area in one picking stream.
  • Pharma campaign weighing: select the material once, list the batches that need it, weigh for all of them in one session.
  • SigmaNEST/ProNest: the whole sheet is issued to the nest program; remnants return to inventory.
  • Rationale: the operator's action mirrors the physical act — one lot comes off the shelf once.

2. Attribution back to members is derived, and the ledger stays per order in the mainstream pattern

  • SAP EWM staging: consumption (261 goods issue) still posts per order against each order's reservation, from the shared staged stock. Aggregate the pick, keep the ledger per order.
  • Pharma campaign weighing: each batch's quantity is recorded separately in the session, so genealogy stays per batch.
  • Fulcrum: the single pick transaction is allocated across jobs at costing time, proportional to each job's bounding box (per-item "lock" for fixed quantities).
  • SAP MILL_OC: goods issue posts once against the synthetic combined order; costs settle back to the original orders via Quantity Distribution at final confirmation (exit-overridable ratios).
  • Rationale: per-order costing and genealogy are non-negotiable; only the when of the split differs (issue time vs costing/settlement time).

3. SAP's default aggregates fixed costs only, never variable consumption

  • PP-PI campaigns are a scheduling/costing bracket: member process orders keep their own reservations and their own goods issues. Dedicated setup/clean-out orders distribute fixed campaign costs across members by rule; variable material cost is never aggregated.
  • SAP DM process lots group SFCs for collective Start/Complete, but component consumption is recorded per SFC and flows back per each SFC's own order.
  • Rationale: aggregation is an execution/UI convenience; the accounting model stays per order unless you opt into the synthetic-order pattern (MILL_OC).

4. Lot genealogy: N postings referencing the same input batch

  • SAP batch where-used (MB56): one batch consumed by N orders = N material documents, same batch number, each with its own order; the where-used tree just shows N branches. Granularity is order-level.
  • BatchMaster: lots allocated per batch job by expiry/rotation → per-batch genealogy.
  • Rationale: "one physical movement" and "N traceability records" are not in tension anywhere in the industry.

Answers to Research Questions

  1. One aggregated issue split system-side, or N issues? — Mainstream (SAP EWM staging, pharma, SAP DM): aggregate the pick, post per-order consumption. Aggregate-transaction-with-derived-allocation exists (Fulcrum, SAP MILL_OC) but Fulcrum defers the split to costing and MILL_OC needs a synthetic order.
  2. How does the operator experience it? — One action: one pick line for the summed quantity (Fulcrum "one fell swoop"; campaign weighing session; EWM consolidated warehouse task). Never N repeated picks.
  3. Can staging aggregate multiple orders into one pick list? — Yes: SAP EWM cross-order staging is purpose-built for it; stock staged non-order-bound to the PSA, consumed per order later.
  4. How is one input lot attributed to N orders? — N consumption postings referencing the same batch/lot id (SAP MB56 pattern); genealogy per member.
  5. Cost attribution for aggregated consumption? — Three SAP tiers: default per-order BOM issue (no split needed); MILL_OC ratio distribution at settlement; product cost collector (abandons per-order). Fulcrum: proportional (area) with per-item fixed-quantity lock. Nesting: actual per-part usage written back.
  6. Terminology? — "pick to the work order" (Fulcrum), "campaign weighing/dispensing" (pharma), "cross-order staging" (SAP EWM), "combined order / quantity distribution" (SAP MILL_OC), "campaign / super batch" (BatchMaster). No vendor calls it "kitting" or "staging" for the multi-order pick itself.

Competitor-Specific Details

SAP

  • MILL_OC / Combined Production Orders (mill products; now S/4HANA Cloud): components of the originals are copied to the combined order with the fixed-quantity indicator (not re-exploded); confirmation + GI post once on the combined order; GR posts per original order via explicit Quantity Distribution; settlement pushes collected costs back by that distribution; customer exits override ratios. The full aggregate-then-split machine — at the cost of a synthetic order.
  • Collective orders are vertical (parent/sub-assembly), not sibling batching.
  • PP kanban + product cost collector: consumption posts to a period cost collector, never per order — the "give up attribution" end of the spectrum.

Fulcrum

  • The batching entity is the Work Order (groups jobs); it owns the pick; job costing allocates the pick's value by nested bounding-box area; a per-item lock fixes quantities instead. Labor is tracked once against the group and apportioned the same way (matches Carbon's time-slice design).

Steelhead

  • Consumables consumed against tank/inventory item (weigh or QR scan), woven into job costing and surcharge invoicing downstream. Exact per-load allocation model not publicly documented.

Process ERPs / pharma

  • BatchMaster: campaign / super batch / sub-batch across lines; manual or backflushed consumption from formulas per batch job. Deacom/Aptean Ross: batch-centric genealogy; aggregated-issue transaction shape not publicly documented. Pharma campaign weighing: one weighing session, per-batch records.

Recommended Approach for Carbon

  1. Aggregate the pick, keep the ledger per member (SAP EWM staging / pharma campaign-weighing pattern, not Fulcrum's costing-time allocation). In MES batch mode, load materials for the whole batch (all member ops), group by item, show the summed requirement; one operator action issues/picks, and under the hood Carbon posts the existing per-member consumptions (trackedEntitiesToOperation / per-member issue) referencing the same lot. Zero changes to costing, GL, or traceability — the same "materialize per member, no downstream special-casing" principle as the time-slice design.
  2. Split basis: each member's own BOM quantity (SAP default), not a proportional share of a total — each jobMaterial.estimatedQuantity already defines the member's requirement; the aggregate is just their sum (the customer's own examples are plain sums: 32+32=64, 4,000+2,500=6,500).
  3. Do NOT adopt the synthetic combined order (MILL_OC / customer's "Case A"): it re-introduces order merging, which the batching spec and the lot-identity research both reject; every system that aggregates the transaction pays for it with a shadow order or deferred allocation.
  4. Genealogy needs nothing new: N trackedActivity consumptions referencing one input trackedEntity is already the industry-standard shape (MB56).
  5. Naming: plain "batch picking" / "batch material issue" in UI copy; reserve "campaign" (SAP PP-PI) — it means a scheduling bracket, not a pick.

Sources