Quote Lead Time Prediction (Capable-to-Promise) Research: Best Practices Survey
Summary
Surveyed how SAP (ATP, MATP, CTP/SBC), Oracle Global Order Promising, Microsoft D365 SCM and Business Central, job-shop ERPs (Epicor Kinetic, Infor SyteLine and VISUAL, JobBOSS², ProShop, Cetec), Odoo, and modern quoting tools (Fulcrum, MRPeasy, Katana, Paperless Parts, Xometry, Protolabs) compute a promised lead time for a make-to-order line. Three tiers exist: policy lead time (a typed days value, optionally with priced expedite tiers — Odoo, Paperless Parts, marketplaces); material-driven ATP (stock plus replenishment/BOM lead time, infinite capacity — SAP classic ATP and MATP, Oracle lead-time mode, BC CTP, D365 ATP); and capacity-driven CTP (a temporary order is exploded and finitely scheduled into the live plan and the earliest feasible finish returned — SAP CTP/SBC, Oracle Make-CTP, D365 CTP, Epicor, SyteLine, Fulcrum, ProShop). Every CTP product runs it on sales orders; only SyteLine, VISUAL and Cetec expose it on a quote/estimate line, and then as a date only. No vendor holds capacity for a quote. Lead time is universally counted in working days to ship, with pick/pack/transit added separately, and purchased-material lead time and capacity are two constraints of which the later wins.
Competitors Surveyed
- SAP S/4HANA / APO — the reference: classic ATP with replenishment-lead-time fallback, MATP, finite CTP/SBC, backward-then-forward delivery scheduling.
- Oracle Fusion GOP / EBS ASCP — three promising modes; Make-CTP with resource capacity; non-committal Check Availability vs committing Schedule.
- Microsoft D365 SCM / Business Central — the delivery-date-control ladder; BC's what-if CTP with accept-to-reserve.
- Epicor Kinetic, Infor SyteLine/VISUAL, JobBOSS², ProShop, Cetec — job-shop CTP as a temp-job simulation the estimator accepts.
- Odoo 17 — pure lead-time policy; the counter-example.
- Fulcrum, MRPeasy, Katana, Paperless Parts, Xometry, Protolabs — one-click finite simulation vs customer-selected expedite tiers.
Key Consensus Patterns
1. A ladder of promising modes, chosen per item and per line
- D365:
Delivery date control= None / Sales lead time / ATP / ATP + Issue margin / CTP / Batch CTP — global default, per-product override, per-line override. "At a minimum, CTP offsets delivery dates to the sales lead time." - Oracle: ATP-rule promising mode = Infinite / Lead time based / Supply chain availability search, plus a "Search components and resources" flag that turns on Make-CTP.
- SAP: classic ATP (stock + receipts inside the replenishment lead time; beyond RLT everything is assumed available) → MATP → CTP.
- Rationale: CTP is slow ("the CTP calculation isn't as fast as the ATP calculation") and only pays off for make/assemble-to-order items.
2. CTP = explode a temporary order and finitely schedule it into the live plan
- SAP: "Temporary planned orders are created … Capacities are then taken into account. A feasible availability date is determined in PP/DS from the result of scheduling these planned orders." PP/DS modes: find slot (first gap in the planning direction), insert, squeeze in, infinite.
- D365: "CTP functionality is based on the explosion function" — BOM + route through the dynamic plan, finite capacity inside the capacity time fence, purchase lead times, transport days, safety margins.
- Epicor:
CalculateCTPbuilds an unfirm job and rough-cut finite-schedules it, honouring production buffers, queue/move, Receive Time, planning time fence and constrained-material lead times; "runs against the actual schedule and drops in the operations where it can and then returns a date." - SyteLine: Get ATP/CTP inserts the demand "into a temporary copy of the APS plan" at the due date; finite APS gives a "worst case … against an already loaded schedule."
- Fulcrum: "simulates when a job would get finished if scheduled at that moment … based on the priority level of the job."
3. Backward from the requested date; forward from today when infeasible
- SAP SD: requested delivery − transit − loading − transportation lead time − pick/pack = material availability date; if that is in the past or unconfirmable, forward-schedule from the earliest ATP date and re-add the four times, each rounded on its own factory calendar.
- BC: "requested delivery date − shipping time = planned shipment date; − outbound whse. handling time = shipment date"; if unavailable, calculate forward and write the earliest
Shipment Date. - D365: the
Available ship and receipt datesdialog pops when the requested date cannot be met and the user picks. - Rationale: "can we hit this date?" and "earliest feasible date" are one engine run in two directions.
4. Requested vs confirmed; the system writes the confirmed date, the user may only loosen it
- SAP: confirmed schedule lines; the user may push the date later or reduce quantity, never earlier or larger.
- Oracle: Requested vs Scheduled (GOP output) vs Promised (tracking) dates; EBS
Promise Datemodes include "First Schedule Date" (frozen) and "Dependent on Schedule Date" (recomputed). - D365:
Confirmed ship/receipt dateset on every save of a CTP line, but re-promised only when the existing promise can no longer be met — a smaller quantity keeps the original date. - SyteLine: Projected date is recomputed every APS run; the due date is never overwritten; a Late Alert compares the two.
5. Temporary supply becomes real only on save/accept; quotes never hold capacity
- SAP: CTP temporary orders "exist only in the check session; converted to permanent on save, deleted otherwise." Quotation schedule line BN "No MRP" transfers nothing; BP does, and the valid-to date does not release it — a known trap.
- BC: accepting CTP dates creates "a planning line and a reservation entry"; declining leaves nothing.
- D365: CTP writes planned orders and capacity reservations, but plan runs historically replanned them — hence "Keep supply for confirmed demand" (10.0.48) and "Protect confirmed CTP dates" (GA Sep 2026). "Delivery date control method is not supported for a sales quotation line."
- Epicor:
ConfirmCTPfirms the job; cancel discards it; "quotes are not associated with a job." SyteLine: an accepted CO line is incrementally planned, but "estimate lines are not incrementally planned." Oracle EBS: scheduling level "ATP Only" for inquiry-type transactions. - Rationale: quote win rates are well below 100 %; holding capacity per quote starves real orders. Quote expiry is cosmetic everywhere (Odoo: a ribbon; Hubs: price "valid for 30 days").
6. Material lead time and capacity are separate constraints; the later wins
- SAP MATP: each component checks against its own rule (a bought part with no stock confirms at the end of its RLT); the header is forward-scheduled from the latest component date.
- Oracle: Buy-CTP applies supplier lead times as a hard constraint; Make-CTP checks resources; the promise is the max.
- Odoo 17:
days_to_prepare_mo= Compute → "the longest lead time among all the components listed on the BoM." - Cetec / VISUAL / Fulcrum: material availability gates operation start inside the finite engine.
7. Working days, calendars, and a post-production buffer
- SAP: scheduling-margin-key floats (before/after production, opening period) in workdays; safety time in working days.
- D365: receipt / issue / reorder margins on working-day calendars; issue margin = ship-prep buffer; transport days by mode of delivery.
- BC:
Offset (Time)+ inbound/outbound warehouse handling + shipping time. Oracle: a non-business-day result moves to the previous working day. - Odoo: the outlier — "lead times are based on calendar days … do not consider weekends, holidays, or work center capacity."
- Protolabs / Xometry: lead times in business days to ship; shipping assumed separately (1-day expedite / 2-day standard).
8. Expedite is a priority, priced as tiers
- Paperless Parts: standard lead time plus "Days Faster" options each with a % markup, "expressed as relative days and percentage markup"; the customer picks; leaving standard blank gives each quantity break its own lead time.
- Xometry: Economy / Standard / Expedited — "expedited orders receive prioritization in all aspects of order fulfillment." SyteLine: Expedited Fixed/Variable lead times feed Get CTP.
- SAP / Oracle / D365: no named expedite mode; forward scheduling from today is the fastest date, and priority reallocation happens later (aATP backorder processing).
Answers to Research Questions
- Inputs — Routing standard times via work-center formulas (SAP, D365, Epicor, SyteLine, Fulcrum); the live finite load (all CTP products); component supply and supplier lead time (SAP MATP/RLT, Oracle Buy-CTP, Odoo
days_to_prepare_mo, Epicor, Cetec); factory/shift calendars (all but Odoo); buffers (SAP floats + safety time, D365 margins, Odoo security leads, BC handling times, Epicor production buffers); a policy floor (D365 sales lead time, SAP RLT with no explosion, Protolabs per-process standard, SyteLine Fixed + Variable + Paperwork + Dock-to-Stock). - Modes — Infinite (SAP classic ATP, Oracle Infinite/Lead-time, D365 Sales lead time/ATP, SyteLine infinite APS); finite earliest feasible (SAP CTP, Oracle supply-chain search + resources, D365 CTP, Epicor, SyteLine finite, Fulcrum, Cetec); "can we hit this date" (SAP backward scheduling, BC backward verify, D365 dialog on miss, SyteLine check-mark if projected ≤ due, ProShop phantom order); best case (job priority in Fulcrum; priced tiers in Paperless Parts/Xometry/Protolabs; Cetec conservative/optimistic; no ERP names a first-in-queue mode).
- Surfacing — A system-written confirmed/projected date beside the requested one, accepted or loosened (SAP, Oracle, D365, BC, SyteLine); a suggestion the estimator types over (MRPeasy "Estimate costs and dates", Katana auto deadline, Odoo read-only
expected_date+ editablecommitment_date, Epicor's manual quote Lead Time field). Per quantity break only in Paperless Parts; Protolabs gives "the same quoted lead time" regardless of quantity. Recompute: D365 only when infeasible; SyteLine every APS run (reference only); Oracle frozen or live by mode; the rest on demand. - Quote-time reservation — None. Temporary supply materialises on order save/accept (SAP, BC, D365, Oracle Schedule, Epicor
ConfirmCTP, SyteLine CO line). SyteLine and Cetec answer on an estimate line but plan nothing; VISUAL loads quotes only as explicit what-if orders. Expiry releases nothing anywhere, and SAP BP quotes are a cautionary tale. - Materials vs capacity, rounding, shipping — Promise = max(material date, capacity date), header forward-scheduled from the later (SAP MATP two-step, Oracle, Epicor). Working-day rounding on the factory/shift calendar (SAP, D365, BC, Oracle, SyteLine M-days); Odoo is calendar-day. Ship vs delivery separated by pick/pack + loading + transit (SAP), outbound handling + shipping time (BC), issue margin + transport days (D365); marketplaces quote days to ship.
Competitor-Specific Details
SAP — Classic ATP never reads routing. MATP stores an "ATP tree", not a receipt. CTP is incompatible with safety stock, period lot sizes and backorder processing. S/4HANA SBC (2022+, aATP + ePP/DS licences) recreates supply on every MTO recheck.
Oracle — Infinite-availability time fence (beyond it, promise on request date) and ATP time fence (inside it, search existing supply before CTP). Resource need = qty × usage / (yield × efficiency × utilization). Fusion 25D pulls scheduled dates earlier when supply arrives early, gated by an Override Schedule flag.
Microsoft — D365 "Near real-time CTP" (10.0.41+) computes in the background per line save; "Batch CTP" every N minutes with a Not ready/Ready status. BC CTP applies only to the uncovered remainder ("10 ordered, 6 available → CTP on 4") and requires the item flagged Critical.
Job shops — SyteLine: lead-time start = due − FLT − int(VLT × qty / hrs per day + .499). VISUAL: the one scheduler that natively loads "planned orders and quotes." JobBOSS²: "auto-default the promise date to lead times" is still a user idea. ProShop: lead time typed; capacity checked by phantom job placement. Cetec Build Estimate: start + ship date from on-hand, component lead times and labour, view-only.
Odoo — expected_date = date_order + customer_lead, nothing else; MO/PO dates back-schedule from it; the MO Plan button forward-schedules work orders on work-center calendars but never moves the SO date.
Recommended Approach for Carbon
Carbon already has the hard part: a forward-ASAP finite scheduler over capacityReservation (packages/planning/src/scheduling/run-schedule.ts; runExpediteWhatIf with persist:false returning { projectedCompletionAt, cause }), quoteOperation rows carrying setup/labor/machine times and work centers column-for-column with jobOperation, itemReplenishment.leadTime for purchased parts, and an unused capacityReservation.scenarioId. What is missing is the glue.
- A mode ladder per line, not a replacement (D365). Keep the typed
quoteLinePrice.leadTimeas the policy mode and add a computed suggestion beside it, floored at an item/company minimum lead time. - CTP = a what-if run of the existing engine seeded from
quoteOperation, not a job (SAP temporary planned order; SyteLine "temporary copy of the plan"; Fulcrum). GeneraliserunExpediteWhatIfto take a synthetic operation set (quote make method × quantity) placed at end of queue over the live reservation snapshot,persist:false. Return{ promiseDate, confidence, cause }— thegetJobPromiseDatecontract already exists with no caller. - Two modes from one engine. Earliest feasible = end of queue; best case = the synthetic job ordered first (what the expedite what-if already does). "Can we hit this date?" = feasible ≤ requested, reporting
cause(bottleneck work center vs material) — no surveyed vendor computes "what would have to move" for a quote, and neither should Carbon in v1. - Material-driven floor (SAP MATP; Odoo
days_to_prepare_mo). Take max overquoteMaterialBuy lines ofitemReplenishment.leadTimenet of on-hand at the quote location, start the synthetic operations no earlier than that, and say which constraint won. - Per quantity break, on demand, frozen (Paperless Parts; Oracle "First Schedule Date"). Run per pricing-grid row when the estimator asks, write the accepted value into
leadTime, and recordleadTimeSource: 'system' | 'manual'next to the existingpriceSource. Never auto-recompute a sent quote; on reopen offer "recalculate" with the delta. - No quote-time reservation. Unanimous. Do not write
scenarioIdrows for quotes; a soft booking, if ever wanted, is a sales-order feature (D365 "Keep supply for confirmed demand"). - Working days plus a ship buffer. Convert the engine's completion timestamp to whole business days on the location shifts (
need-by-calculator.tsworkingDayTest), add a locationshippingBufferDays(D365 issue margin; BC outbound handling), and fixconvert/index.ts, which setspromisedDate = now + leadTime × 86 400 000on calendar days. Prior art:quoteShipment.leadTime(migration20260206061346) was reverted three days later — the quote header was the wrong grain; the per-quantity-break line is right.
Sources
- https://help.sap.com/doc/saphelp_scm700_ehp02/7.0.2/en-US/4c/56297de7c33a0de10000000a42189c/content.htm?no_cache=true
- https://help.sap.com/saphelp_SCM700_ehp01/helpdata/en/a9/27c95360267614e10000000a174cb4/content.htm?no_cache=true
- https://help.sap.com/saphelp_SCM700_ehp02/helpdata/en/4c/4e5b37eb096ad8e10000000a42189c/content.htm?no_cache=true
- https://help.sap.com/saphelp_SCM700_ehp02/helpdata/en/f0/40c95360267614e10000000a174cb4/content.htm?no_cache=true
- https://help.sap.com/doc/saphelp_snc70/7.0/en-US/21/7acc37d2fee941e10000009b38f8cf/content.htm?no_cache=true
- https://help.freedsap.com/ENHELPhtml/PPMRP/AvailabilityCheckWithorWithoutRe.html
- https://learning.sap.com/courses/exploring-aatp-in-sap-s-4hana/outlining-supply-based-confirmation-sbc-
- https://learning.sap.com/courses/exploring-advanced-production-planning-with-sap-s-4hana-pp-ds/exploring-concepts-and-principles-of-detailed-scheduling
- https://blog.sap-press.com/delivery-scheduling-and-transportation-scheduling-in-sap-s4hana
- https://blog.sap-press.com/atp-checks-in-s4hana-sales
- https://www.stechies.com/where-the-schedule-margin-key-is-customized/
- https://community.sap.com/t5/enterprise-resource-planning-q-a/atp-at-quotation/qaq-p/8699789
- https://community.sap.com/t5/enterprise-resource-planning-q-a/quotation-appearing-on-md04-list-instead-of-sales-order/qaq-p/7654130
- https://thesdvault.com/sap-advanced-atp-s4hana
- https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/24c/fascp/atp-rule-promising-modes.html
- https://docs.oracle.com/en/cloud/saas/supply-chain-management/21d/fascp/order-promising-rules.html
- https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/25c/fascp/check-availability.html
- https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/25d/faiom/set-promised-ship-and-arrival-dates-on-fulfillment-lines.html
- https://docs.oracle.com/cd/E18727_01/doc.121/e13378/T474179T474185.htm
- https://docs.oracle.com/cd/E18727_01/doc.121/e13406/T373258T377249.htm
- https://learn.microsoft.com/en-us/dynamics365/supply-chain/master-planning/planning-optimization/calculate-delivery-dates-using-ctp
- https://learn.microsoft.com/en-us/dynamics365/supply-chain/sales-marketing/delivery-dates-available-promise-calculations
- https://learn.microsoft.com/en-us/dynamics365/supply-chain/sales-marketing/delivery-alternatives
- https://learn.microsoft.com/en-us/dynamics365/supply-chain/master-planning/planning-optimization/safety-margins
- https://learn.microsoft.com/en-us/dynamics365/supply-chain/master-planning/planning-optimization/keep-supply-for-confirmed-demand
- https://learn.microsoft.com/en-us/dynamics365/release-plan/2026wave1/enterprise-resource-planning/dynamics365-supply-chain-management/protect-confirmed-ctp-dates-planning-optimization
- https://community.dynamics.com/forums/thread/details/?threadid=a72157a6-6faa-4dda-bc77-d071835535d1
- https://learn.microsoft.com/en-us/dynamics365/business-central/sales-how-to-calculate-order-promising-dates
- https://learn.microsoft.com/en-us/dynamics365/business-central/purchasing-date-calculation-for-purchases
- https://probitas.co.uk/2022/01/14/available-and-capable-to-promise-in-business-central-part-two/
- https://www.epiusers.help/t/capable-to-promise/89981
- https://www.epiusers.help/t/quote-entry-lead-time-field/48890
- https://www.epiusers.help/t/promise-dates-vs-running-balance-vs-aps-ctp/104057
- https://www.epiusers.help/t/dating-orders-dare-i-open-the-ctp-can-of-worms/125533
- https://erp.smcusa.com/SyteLine/Language/en-US/mergedProjects/sl_invprod/buttons/g/get_atp_ctp_button.htm
- https://docs.infor.com/csi/2026.x/en-us/csbiolh/inventory_user_cl_sl/mergedprojects/sl_invprod/forms/system/availability_results.html
- https://docs.infor.com/csi/9.01.x/en-us/csbiolh/mergedprojects/sl_invprod/fields/p/projected_order_line_maintenance.htm
- https://wm-synergy.com/products/infor-visual-erp-scheduling/
- https://www.ecisolutions.com/products/jobboss2/features/scheduling/
- https://proshoperp.com/product/estimating-quoting/
- https://proshoperp.com/blog/better-shop-floor-scheduling/
- https://cetecerp.com/blog/using-cetec-erp-build-estimates-for-accurate-quotes-and-delivery-dates/
- https://fulcrumpro.com/manufacturing-software/quoting-software-for-manufacturing
- https://fulcrumpro.com/workflows/cnc-machine-shop
- https://www.mrpeasy.com/resources/user-manual/crm/customer-orders/details/
- https://support.katanamrp.com/en/articles/5914341-how-to-manage-production-deadlines
- https://support.katanamrp.com/en/articles/5914243-managing-quotes
- https://help.paperlessparts.com/s/article/dynamic-lead-times-guide
- https://www.paperlessparts.com/blog/can-we-get-the-parts-sooner-sure/
- https://www.xometry.com/resources/blog/lead-time-options/
- https://www.protolabs.com/help-center/lead-times/
- https://www.hubs.com/help-center/how-to-get-a-quote/
- https://www.odoo.com/documentation/17.0/applications/inventory_and_mrp/inventory/warehouses_storage/replenishment/lead_times.html
- https://raw.githubusercontent.com/odoo/odoo/17.0/addons/sale/models/sale_order_line.py
- https://raw.githubusercontent.com/odoo/odoo/17.0/addons/mrp/models/mrp_bom.py
- https://www.odoo.com/forum/help-1/how-to-deal-with-maximum-manufacturing-capacity-per-day-when-planning-203797