Skip to content

Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.

4.3 KB
Raw Blame

id: 1031 kind: feature title: Accounting period close lifecycle + posted-record immutability + close checklist risk: med issue: 1031 acceptance:

  • "DB trigger: direct service-role SQL INSERT INTO journal dated in a Closed period is rejected with a trigger error"
  • "Immutability: UPDATE journal SET ... WHERE status = 'Posted' (non-Reversed) is rejected via PostgREST for both user and service role; Posted -> Reversed still works"
  • "Service gate: operational posting (receipt/shipment/invoice) into a Locked period is rejected with a 'period is locked' error"
  • "Service gate: accounting posting (manual JE) into a Locked period is allowed"
  • "Sequential close: closing period N is rejected while period N-1 is not Closed"
  • "Sequential reopen: reopening period N is rejected while period N+1 is not Open"
  • "Checklist instantiation: opening the close drawer for a period idempotently creates the 9 seeded tasks (running instantiation twice does not duplicate rows)"
  • "Blocker tasks: a period with a failing Blocker auto-check (e.g. draft JEs) cannot be closed; the Close button is disabled"
  • "Warning skip: a Warning task can be skipped with a recorded reason; empty skippedReason is rejected"
  • "Blocker skip: a Blocker task cannot be skipped (server-side rejection)"
  • "Close gates on tasks: close succeeds only when all required tasks are Done or Skipped; final Auto-task states are persisted"
  • "Migration idempotent: running the migration SQL twice completes cleanly (IF NOT EXISTS / OR REPLACE guards)"
  • "Types green: pnpm run generate:types, pnpm --filter @carbon/erp typecheck, pnpm --filter @carbon/database typecheck, and pnpm run lint all pass"

Issue #1031: Accounting Period Close Lifecycle + Posted-Record Immutability + NetSuite Checklist

What to build

Implement the Open → Locked → Closed accounting period lifecycle for Carbon, with:

  1. DB trigger backstop (hard close enforcement at the DB layer; no code path can bypass)
  2. Service-layer posting gate in getOrCreateAccountingPeriod (operational vs accounting source context)
  3. Sequential close / reverse-sequential reopen rules
  4. Fiscal-year identity (fiscalYear + periodNumber on accountingPeriod)
  5. Posted-record immutability: posted journals allow only Posted→Reversed; journalLines frozen once parent posted; journalLine.createdBy added
  6. NetSuite-style persisted close checklist (periodCloseTaskDefinition template + per-period periodCloseTask instances, 9 seeded system tasks)
  7. Accounting Periods UI page at /x/accounting/periods

Specs & Plans

The full spec and implementation plan are on the period-closing-spec branch (PR #1013). Fetch them before starting:

git fetch origin period-closing-spec
git show origin/period-closing-spec:.ai/specs/2026-07-02-period-closing.md > /tmp/period-closing-spec.md
git show origin/period-closing-spec:.ai/plans/2026-07-02-period-closing.md > /tmp/period-closing-plan.md
git show origin/period-closing-spec:.ai/specs/2026-07-04-accounting-implementation-meta.md > /tmp/accounting-meta.md

Read all three files before writing any code.

Ground rules (from the plan)

  • Do NOT regenerate or commit packages/database/src/types.ts — cloud-generated; use (client.from("accountingPeriod") as any) / as unknown as casts for new columns
  • Do NOT rebuild the database; apply migrations with pnpm db:migrate only when the local stack is up
  • Typecheck per package (e.g. pnpm --filter @carbon/erp typecheck), never whole-repo tsc --noEmit
  • Commit only at the marked checkpoints after verification passes

Key migration

Migration 20260702044133_period-close-lifecycle.sql is ALREADY DRAFTED and exists on period-closing-spec branch at packages/database/supabase/migrations/20260702044133_period-close-lifecycle.sql. Fetch it:

git show origin/period-closing-spec:packages/database/supabase/migrations/20260702044133_period-close-lifecycle.sql

The Task 17 checklist DDL should be folded into this migration (since it hasn't been applied yet — preferred per addendum).

Commit checkpoints

  1. After Tasks 1–8 + 17 (backend) pass typecheck: feat(accounting): period close lifecycle — schema, services, posting gates, checklist tables
  2. After Tasks 9–16 + 18–20 (UI + checklist) pass typecheck + lint: feat(accounting): accounting periods page + NetSuite-style close checklist

PR must reference: Closes #1031