Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.
Bugfix run: Inbound-inspection reject posts no inventory write-off
Date: 2026-07-26
Mode: fully-autonomous (stop at READY; commit only on explicit ask)
Request: Rejecting a non-tracked Inventory inbound-inspection lot posts no negative inventory adjustment and no scrap-account journal. Ordered 5, rejected 5 (no -5), NCR disposition use-as-is 3 (+3) → 8 on hand instead of 3.
Phase plan: root-cause [done — HIGH] · instrument [skip — HIGH confidence] · fix [run] · test [run — route-action unit test] · commit [skip — no explicit ask]
Decisions
- instrument: skip — root cause HIGH, statically proven (git diff shows the engine
returns
writeOffwhile committed HEAD reject route ignores it) — 2026-07-26 - test approach: route-action unit test on
$id.reject.tsx(mock requirePermissions + dispositionInspection + fake client.functions.invoke), per traceability.search.test.ts precedent — the defect is a missing route→edge-function call, so the route is the unit.
Phase log
root-cause: HIGH. 868f5c1bf moved the itemLedger reject write-off out of
dispositionInspection(now returns awriteOffdescriptor); ERP reject route was not updated to post it viapost-nonconformance. Working tree already adds the wiring but still swallows a failed post (logs + continues), so a failed write-off silently proceeds to NCR creation whose Use-As-Is restore double-counts.fix: hardened
$id.reject.tsx— a failedpost-nonconformancewrite-off now surfaces (flash error) and aborts before NCR creation, instead of logging and proceeding. Wiring (writeOff → post-nonconformance) confirmed present/correct.test: added
$id.reject.test.ts(3 cases). RED baseline: test 3 failed (getInspection called after swallowed error); committed HEAD had 0 writeOff references (wiring regression baseline). GREEN after fix: 3/3 pass.
Outcome
- READY (not committed — no explicit ask). Gates: generate:types SKIP · biome PASS · typecheck(erp) PASS · test(erp quality+inspection) PASS 13/13.
- Note: primary wiring fix was pre-existing uncommitted working-tree work; this run adds the failure-surfacing hardening + the regression test that locks both.