Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.
Accounting Implementation Meta Spec — the DAG to Public-Company Readiness
Status: active (program definition — stays open until the exit criteria pass) Author: Claude (with Brad Barbin) Date: 2026-07-04 Tracking issue: crbnos/carbon#1060 Companions: audit
.ai/specs/2026-07-03-public-company-readiness.md· roadmap.ai/plans/2026-07-03-public-company-readiness-roadmap.md· research.ai/research/public-company-compliance.md
Purpose
This is the program contract for autonomous execution: implement every existing accounting spec and everything else required for Carbon to pass a compliance audit as the accounting system of a public company operating in multiple countries. The unit of work is a GitHub issue (#1030–#1059); this spec defines the DAG between them, the execution protocol an agent follows for each, and the exit criteria for the whole program. Issues reference the detailed specs; where a workstream has no spec yet, its issue says so and the agent writes one first (creating more specs as needed is expected and encouraged — new spec ⇒ new changelog entry here).
Binding rules:
- The issues are the binding. An issue's body + its referenced specs define the work. If this spec and an issue disagree, fix the disagreement before building (comment on the issue).
- The DAG is authoritative here. An issue is ready when all its hard dependencies are closed. Do not start a non-ready issue.
- Humans stay in the loop at spec gates only. Open questions are resolved by @barbinbrad in issue comments before a spec is written (per
.ai/skills/spec-writing/SKILL.md— interview first, document second). Everything else is autonomous.
Exit criteria — "we would pass the audit"
The program is complete when all of the following hold (expanded form in the roadmap's Definition of full readiness):
- ICFR controls: period close enforced at the DB for every writer; posted records immutable everywhere with reversal/void-only correction and the audited Repair channel; document approvals live on JEs/payments/purchase invoices/memos with system-enforced no-self-approval; always-on, synchronous, append-only audit trail (≥7-year accounting retention) covering all accounting + permission tables; gapless numbering from the cutover epoch; access-review and SoD reports produce auditor-ready CSVs; the JE population export reconciles opening→closing trial balance for any fiscal year.
- Financial statements: BS/IS/TB/SCF/GL-detail, Posted-only, comparatives, consolidated across mixed currencies with real (warned) rates and posted, rolled-forward CTA; budget-vs-actual; drill-down to journal lines everywhere; CSV/PDF exports.
- GAAP subsystems: deferred revenue + deposits + POC with rollforwards; lease subledger; standard cost + revaluation + LCNRV + landed cost; impairment/CIP/component assets; prepaid/recurring/auto-reversing engines; at least one adjustment book proving multi-GAAP; segment-tagged statements with server-enforced dimensions.
- Multi-country statutory: tax determination/posting/returns per registration; e-invoicing live via Avalara for at least one clearance market with the state machine proven; FEC + one SAF-T flavor validating; statutory COA mapping; WORM retention + legal hold.
- Ecosystem: TB API, JE export/import APIs (import approval- and period-aware), close webhooks — documented.
- Cutover: accounting always-on;
accountingEnabledflag deleted; ≥2 companies migrated through the activation runbook with tying opening balances. - (Company program, outside agent scope but gating the audit itself): SOC 1 Type II underway per roadmap §∥.
The DAG
Waves are a scheduling convenience; the truth is the edge list. ⚠ spec-first = the issue requires writing a spec (with the Brad interview) before building.
| Issue | Workstream | Spec status | Hard deps | Soft deps / coordination |
|---|---|---|---|---|
| #1030 | FX convention normalization | spec exists — 3 open questions to resolve in-issue first | — | ship as one coordinated PR |
| #1031 | Period close + posted-record immutability + NetSuite-style close checklist | spec + plan exist (two delta banners; plan Addendum Tasks 17–20) | — | land before #1036 (shared post-* surface); seeds the checklist registration surface downstream close tasks use |
| #1032 | Document approvals + SoD reporting | spec exists — /plan next |
— | highest priority |
| #1033 | ITGC hardening | CLOSED — deferred (Brad, 2026-07-04) | — | reopen when the SOC program starts |
| #1034 | Bank reconciliation Phase 1 | spec + plan exist (delta banner) | #1030 | |
| #1035 | Financial reporting package | spec + plan exist (delta banner) | #1031 | |
| #1036 | Tax Phase 1 | spec exists — /plan next |
#1030 | after #1031 (posting triggers) |
| #1037 | Budgeting Phase 1 | spec + plan exist | #1031 | |
| #1038 | Gapless numbering + legal series | spec exists (2026-07-04-gapless-numbering-legal-series.md) — /plan next |
#1031 | coordinate with #1047 |
| #1039 | Close automation (depreciation, accruals, recurring) | spec exists (2026-07-04-close-automation.md) — /plan next |
#1031 | |
| #1040 | Inventory valuation completeness | spec exists (2026-07-04-inventory-valuation-completeness.md) — /plan next |
#1031 | IAS 2 reversal waits for #1052 |
| #1041 | Fixed assets completeness | original spec archived 2026-09-22 (archived/2026-07-04-fixed-assets-completeness.md); scope narrowed to make/self-constructed assets — the make-to-asset + CIP contract and the inventory→asset bridge are now built (implemented/2026-09-22-revenue-recognition-rentals-and-contracts.md Part I §2); components / impairment / reclassification remain unspecified follow-ons |
#1031 | |
| #1042 | Plaid bank feeds + cash position | spec exists — /plan next |
#1034 | |
| #1043 | Tax Phase 2 (returns, settlement) | spec exists | #1036, #1031 | |
| #1044 | Tax Phase 3 (Avalara, Xero mapping) | spec exists | #1036 | foundation for #1054 |
| #1045 | Budgeting Phases 2–3 | spec + plan exist | #1037, #1035 | |
| #1046 | Bank rec Phases 3–4 | spec exists | #1034 | |
| #1047 | Record integrity, audit hardening, JE export, book seed | spec exists (2026-07-04-record-integrity-audit-hardening.md) — /plan next |
#1031, #1032, #1034 | the spec is the audit.config.ts ask |
| #1048 | Revenue recognition (full ASC 606 + SSP + POC) | Phase 1 (deferral substrate, recognition runs, rentals) and contract revenue built — implemented/2026-09-22-revenue-recognition-rentals-and-contracts.md Parts I and III. SSP allocation, POC and modifications remain in 2026-07-04-revenue-recognition.md; 2 open questions in-issue |
#1031, #1036 | |
| #1049 | Segments + dimension enforcement | spec exists (2026-07-04-segment-reporting.md) — /plan next |
#1035 | |
| #1050 | FX + consolidation completeness | spec exists (2026-07-04-fx-consolidation-completeness.md) — /plan next; 2 open questions in-issue |
#1031, #1034, #1035 | |
| #1051 | Master-data controls + vendor bank details | spec exists (2026-07-04-master-data-controls.md) — /plan next |
#1032, #1047 | prereq for any payment execution |
| #1052 | Multi-book adjustment books | spec exists (2026-07-04-multi-book.md) — /plan next |
#1047 | owns the shared book DDL contract with #1047 |
| #1053 | Statutory exports (FEC, SAF-T, GoBD, statutory COA, retention) | CLOSED — deferred (Brad, 2026-07-04; reopen before any French/statutory-filing entity goes live) | — | |
| #1054 | E-invoicing framework (Avalara first-class) | spec exists (2026-07-04-e-invoicing.md) — /plan next; 3 open questions in-issue |
#1036, #1038, #1044, #1061 | France mandate Sept 2026; Poland KSeF already in force |
| #1055 | Withholding, ECSL/Intrastat, MTD | spec exists (2026-07-04-withholding-ecsl-intrastat-mtd.md) — /plan next; 2 open questions in-issue |
#1043 | |
| #1056 | Lease subledger (lessee + lessor, 842/IFRS 16) | lessor slice (operating + sales-type) built — implemented/2026-09-22-revenue-recognition-rentals-and-contracts.md Part I §3–§4; the lessee side remains in 2026-07-04-lease-accounting.md; 2 open questions in-issue |
#1052 | |
| #1057 | Cutover tooling + flag retirement | spec exists (2026-10-08-accounting-cutover.md, replaces the archived 2026-07-04-accounting-cutover-activation.md) — /plan next |
#1031, #1036, #1047, #1038 | gates GA / always-on |
| #1058 | Intercompany maturity | spec exists (2026-07-04-intercompany-maturity.md) — /plan next; 2 open questions in-issue |
#1050 | |
| #1059 | Integration surface (TB/JE APIs, JE import, webhooks) | spec exists (2026-07-04-integration-surface.md) — /plan next |
#1032, #1047 | |
| #1061 | Avalara integration foundation (registry, credentials, shared client) | spec + plan exist (2026-07-04-avalara-integration-foundation.md, plan same slug) — execute next; 1 open question in-issue |
— | consumed by #1044 and #1054 |
Rendered graph: see #1060 (mermaid).
Critical path to "controls pass" (the two MW findings): #1031 → #1047, with #1032 in parallel. Critical path to always-on accounting: #1031/#1030 → #1036 → (#1038, #1047) → #1057. First external deadline: #1054 (France, Sept 2026) via #1036 → #1044.
Execution protocol (per issue — the agent contract)
- Pick the highest-priority ready issue (all hard deps closed). Priority order when several are ready: #1032 first (standing instruction), then critical-path issues, then wave order.
- Spec gate: if the issue is ⚠ spec-first, run
/spec-writing— fieldwork, then post the open questions as an issue comment tagging @barbinbrad, wait for answers, then write the spec with resolutions baked in and commit it. If the issue references a spec with unresolved questions (#1030), resolve them the same way before building. - Plan: run
/planfrom the finalized spec →.ai/plans/{date}-{slug}.md. - Build on a feature branch (
feature/{slug}), following the plan; migrations idempotent, randomized HHMMSS timestamps, never backdated (.ai/lessons.md);pnpm run generate:typesafter schema changes before typechecking; scoped typecheck (pnpm exec turbo run typecheck --filter=<pkg>), lint, tests. - Verify: every acceptance criterion in the spec and every definition-of-done box in the issue, with evidence (command output, screenshots for UI) posted to the issue. Never claim done without running the verification.
- PR: one PR per issue, linking the issue (
Closes #NNNN) and the spec (Tracking spec:line). Follow.ai/skills/check-and-commit/SKILL.mdbefore committing. - Close-out: on merge — check the issue off in #1060; tick the roadmap checkbox; update the spec's changelog (and move to
implemented/when fully done); if the work changed any assumption in this meta spec or the DAG, update this file in the same PR. - New specs as needed: any discovery that meets the spec-writing triggers (new module, 3+ files, data-model change) gets its own spec under the standard flow and, if it's a new unit of work, a new issue wired into the DAG here.
Coordination rules: issues sharing the post-* edge-function surface (#1030, #1031, #1036, #1047) must rebase on each other's merged state — do not run two of them concurrently. The six Phase-∅ specs carry ⚠ delta banners on their plans; apply the deltas before executing. Close-checklist registration: #1031 ships the persisted checklist (periodCloseTaskDefinition/periodCloseTask, 9 seeded tasks); any later workstream that adds a period-end activity (#1039 depreciation/accruals, #1042/#1046 bank rec completeness, #1048 revenue recognition, #1050 FX revaluation + consolidated rates) delivers its close integration by registering a task definition (with an auto-check where the state is computable) — never by inventing a parallel checklist mechanism.
Out of scope for agents
SOC 1/SOC 2/ISO 27001 evidence programs, auditor selection, PITR/DR contracts, and country software certifications (Portugal AT, France PDP) are company-program items (roadmap §∥) — agents support them (e.g., #1033's controls) but cannot complete them.
Changelog
- 2026-07-04: All 18 residual per-workstream open questions resolved under the program ambition heuristic (Brad: ambitious and thorough now; back out at /plan stage if needed) — recorded inline in each spec's Open Questions section with the back-out valve named. No spec in the program carries an unchecked question; every issue is executable with no gates beyond /plan. The two commercial items (Avalara contract coverage FR/PL/IT + inbound; HMRC vendor registration) are recorded as company actions with build-side assumptions that don't block execution.
- 2026-07-04: All spec-first workstreams spec'd (16 specs + the Avalara plan written in one batch with Brad's 15 resolutions baked in — full ASC 606 incl. SSP, ambitious segments/leases/multi-book, propose-only depreciation, gapless all-sequences, current-infra APIs). #1033 (ITGC) and #1053 (statutory archives) closed/deferred by Brad. #1061 (Avalara integration foundation) added — no deps; #1044 and #1054 now depend on it. Every remaining issue is executable: spec →
/plan→ build. Residual per-workstream open questions live in their issues (14 total across 8 issues) — resolve in-issue before the affected portion builds; none block schema-level starts except where noted. - 2026-07-04: Period-closing scope expanded at user direction to include the NetSuite-style persisted close checklist (#1031 row updated; issues #1031/#1039/#1048/#1050 bodies updated). New coordination rule: downstream period-end workstreams integrate by registering
periodCloseTaskDefinitionrows, never by building parallel checklist mechanisms. DAG unchanged (no new nodes or edges). - 2026-07-04: Created. 30 workstream issues (#1030–#1059) + tracking issue #1060 opened; DAG defined; execution protocol set. All program-level open questions were resolved 2026-07-03/04 (see the readiness spec); per-workstream questions resolve in-issue at each spec gate.