Change Orders — Replacement Part rename, net-new New Part, and BOM consolidation
Status: draft Author: Brad Barbin (with Claude) Date: 2026-07-19
TLDR
The change-order (ECO) module's New Part change type is misnamed: it always
mints a new part number derived from the affected part and auto-writes a 1:1
affectedPart → newPart itemSupersession at release — i.e. it is a
replacement, not a new part. This spec (1) renames New Part → Replacement Part, (2) adds a genuinely net-new New Part change type — a brand-new
part with no predecessor and no supersession, minted and released under the
change order (Make or Buy), and (3) enables N→1 consolidation ("3 parts
become 1") as a change to the parent assembly's make-method BOM (remove the
old component lines, add the new one) that consumes a New Part — expressed
entirely through the existing diffMethod engine, with no supersession. No
new tables; the work is one enum migration plus additive service/UI paths.
Grounded in .ai/research/2026-07-19-co-part-consolidation.md (11 PLM/ERP
systems surveyed).
Problem Statement
Two related gaps, both discovered while modeling a real ECO: "I'm not replacing a part on a BOM — I'm introducing a new way of doing things: 3 parts become 1."
New Partis a misnomer and blocks a genuine new-part use case. Today the change types areVersion(new make-method version, same item, no supersession),Revision(new revision item, same readableId,oldRev → newRevsupersession), andNew Part(new part number derived from the affected part,affectedPart → newPartsupersession). All three are anchored to an existing affected part, andNew Partalways writes a 1:1 supersession (createChangeOrderDraftMethodNew Part branch,items.service.ts; the reveal+supersession inreleaseAffectedItem,items.server.ts:407). There is no way to introduce a brand-new part with no predecessor under a change order.mintPlaceholderPartexists initems.service.tsbut is wired to nothing (the AGENTS "G3 forward-reference" claim is stale).Consolidation has no home. A change that removes several components from an assembly's BOM and adds one new component is not a part-to-part supersession — the removed parts are not being replaced everywhere they are used, only dropped from this assembly. Using
New Part/Revision(which write a global-redirectitemSupersession, consumed by the supersession redirect map inget-method/MRP) would wrongly redirect those components in every other assembly that uses them. There is no supported way to say "restructure this assembly's BOM and introduce the consolidated part as part of the same controlled change."
Industry practice is unambiguous (research): a new part number that supersedes a predecessor is universally Replace/Supersede (Windchill/Teamcenter "Supersede", Fusion/NetSuite "Replace a Component", Duro "supersession"); "New Part" everywhere means no predecessor; and N→1 consolidation is always a parent-BOM add/remove, never N supersessions.
Proposed Solution
Change-type taxonomy (after this spec)
Two axes — is there a predecessor? and same part number or new one?:
| Change type | Predecessor | Part number | Supersession at release | Draft |
|---|---|---|---|---|
| Version | same part | same # | none | new make-method version on the same item |
| Revision | same part | same #, new rev string | oldRev → newRev |
new inactive revision item |
Replacement Part (renamed from New Part) |
same part | new # derived from source | affectedPart → newPart |
new inactive part, method copied from source |
| New Part (net-new) | none | new # from the type sequence | none | new inactive part, empty draft method (Make) or attrs-only (Buy) |
Consolidation is not a change type. It is the combination, in one CO, of:
(a) a New Part affected item (the consolidated "1"), and (b) the assembly
as a Version (or Revision) affected item whose draft BOM removes the old
component lines and adds a line referencing the New Part. The diffMethod engine
already classifies added/removed materials (items.service.ts:6624/6643), so
the CO renders − P1 − P2 − P3 + P_new with no new machinery.
How a New Part flows
- Add — a new "Create new part" mode in the add-affected-item flow (a
minimal new-part form: auto-minted
readableIdwith override, name, type Part/Tool, replenishment Make/Buy). On submit: mint an inactive item + (for Make) an empty CO-owned draftmakeMethod, then insert achangeOrderAffectedItemwithchangeType = 'New Part'. - Author — the New Part's affected-item detail reuses the embedded
PartProperties(attributes) and, for Make,BillOfMaterial/BillOfProcesseditors — identical to a Replacement/Revision draft, but starting empty and with no cutover/supersession card (there is no predecessor). - Consume — the assembly's draft BOM editor can add a line referencing the New Part's (inactive) draft item; inactive items are legal BOM components.
- Release —
releaseAffectedItemreveals the New Part active (item.active = true, stampitem.changeOrderId) and activates its draft method, but skips the supersession (only Revision + Replacement Part write one). The assembly's new method version activates in the same run, ordered so the New Part is revealed first.
Design Decisions
| Decision | Choice | Rationale |
|---|---|---|
| Rename the 1:1-supersession type | New Part → Replacement Part |
It always writes affectedPart → newPart supersession; "New Part" everywhere in industry means no predecessor (research consensus, all 11 systems). User-selected. |
| Add a net-new change type | New Part (no predecessor, no supersession) |
Standard PLM behavior (Windchill/Teamcenter/Agile/Fusion/Arena/Duro); unblocks introducing a part under change control. User-selected. |
| New Part item scope | Make + Buy | Reuses the existing draft-method + embedded BillOfMaterial/BillOfProcess editors; the consolidated "1" may itself be a make sub-assembly. Delta vs today = start from an empty draft method instead of copying a source. User-selected. |
| New Part is a first-class affected item | Own explorer row + own draft, not an inline BOM-line side effect | Matches Carbon's affected-item-centric model; lets the new part be governed, authored, and released with the CO. Settled by model + research. |
| Standalone New Part | Allowed — no assembly change required in the same CO | Supports "introduce a new part under an ECO" on its own; consolidation is just New Part + an assembly Version change bundled. User-selected. |
| Consolidation modeling | Parent-assembly BOM change (Version/Revision) via diffMethod add/remove — no change type of its own, no supersession |
Unanimous across all 11 systems; N→1 as supersession would wrongly redirect the removed parts everywhere they are used. User-selected framing. |
| Removed components | Surface where-used on removed diff lines; no auto-obsolete | No surveyed system auto-obsoletes; obsolescence stays a manual, where-used-guided action. Reuses getPartUsedIn. User-selected. |
| New Part number assignment | Auto-mint from the type sequence, user override | Mirrors /x/part/new (useNextItemId); Replacement Part keeps its derive-from-source minting (getNextItemIdFromSource). |
| Release supersession gating | Supersession only for Revision and Replacement Part; New Part and Version write none | New Part has no predecessor; Version edits the same item. One-line change to the releaseAffectedItem guard. |
| Change-type switcher | updateChangeOrderAffectedItemChangeType offers only {Version, Revision, Replacement Part} for an existing affected item; cannot switch to/from New Part |
A New Part is intrinsically net-new; converting an existing-part change into a no-predecessor part (or vice-versa) is contradictory. |
| New Part item types | Parts + Tools only (Materials/Consumables/Services rejected) | Mirrors Replacement Part + the affected-item scope. |
| Data model | No new tables/columns | Reuse changeOrderAffectedItem (its itemId/newItemId/draftMakeMethodId already carry everything); the change is an enum rename + add and additive logic. |
Data Model Changes
No new tables or columns. One enum migration on changeOrderChangeType
(created in 20260716101500_change-orders.sql):
-- Rename the 1:1-supersession type. Existing changeOrderAffectedItem rows with
-- changeType = 'New Part' become 'Replacement Part' for free — they all already
-- carry an affected → new itemSupersession, so the relabel is semantically exact.
ALTER TYPE "changeOrderChangeType" RENAME VALUE 'New Part' TO 'Replacement Part';
-- Add the net-new type. NOTE: Postgres cannot use a newly ADDed enum value in the
-- same transaction that adds it, so this ADD VALUE must land (and commit) before
-- any migration/statement references 'New Part'. Keep it in its own migration
-- step; no data backfill (no existing rows are net-new).
ALTER TYPE "changeOrderChangeType" ADD VALUE 'New Part';
changeOrderAffectedItem field usage per change type (unchanged columns, new
interpretation for New Part):
| Field | Version | Revision | Replacement Part | New Part |
|---|---|---|---|---|
itemId |
the affected item | the affected item | the affected (source) item | the minted new item |
baseMakeMethodId |
source Active method | source Active method | source Active method | null (nothing copied) |
draftMakeMethodId |
new draft version | new revision's draft | new part's draft (copied) | new part's empty draft (Make) / null (Buy) |
newItemId |
null | new revision item | new part item | the minted new item (drives reveal) |
cutover (supersessionMode, dates) |
n/a | set | set | n/a (no predecessor) |
After the migration, run pnpm run generate:types; regenerate the
changeOrderChangeTypes const array + ChangeOrderChangeType type in
items.models.ts to match (Version, Revision, Replacement Part, New Part).
API / Service Changes
All in the Items module's canonical files (per the one-service/models/server
convention — no changeOrder.* files).
items.models.ts—changeOrderChangeTypesbecomes["Version", "Revision", "Replacement Part", "New Part"]. Add a validator for the new-part add form (changeOrderNewPartValidator:readableId?,name,type∈ {Part, Tool},replenishmentSystem∈ {Buy, Make, Buy and Make}).items.service.tscreateChangeOrderDraftMethod— the existingchangeType === "New Part"branch (copy-from-source + mint derived number) is renamed to"Replacement Part"(logic unchanged, incl.getNextItemIdFromSourceand the Parts/Tools guard). Add a new"New Part"branch: mint an inactive item (auto number from the type sequence or the supplied override), create an empty CO-owned draftmakeMethodwhen Make (none for Buy), stampchangeOrderId, write draft refs (newItemId = itemId = minted id,baseMakeMethodId = null).addChangeOrderAffectedItem— accept anewPart?: {...}payload; when present, mint the item first (viacreateChangeOrderDraftMethod's New Part path) and insert the affected-item row withchangeType = 'New Part'. The existing "must be an existing itemId" path is unchanged for the other types.updateChangeOrderAffectedItemChangeType— reject transitions into or out ofNew Part; the picker only exposes {Version, Revision, Replacement Part}.- Every
=== "New Part"string branch (currently meaning replacement) is audited and updated to"Replacement Part"; genuinely-net-new logic lives in the new"New Part"branches. (grep -rn '"New Part"'before/after.)
items.server.ts—releaseAffectedItem:- Change the supersession guard from
if (changeType !== "Version" && newItemId)to only Revision + Replacement Part;New Partreveals its item (active +changeOrderIdstamp) and activates its draft without supersession. applyChangeOrderorders releases so a New Part affected item is revealed before any assembly (Version/Revision) affected item whose BOM references it; keep the per-item idempotency (a released draft haschangeOrderIdcleared).
- Change the supersession guard from
- Where-used — reuse
getPartUsedInto compute, for each removed BOM line on an assembly draft, whether the component is still used by other parents (count excluding the assembly being edited). No new service; a thin wrapper / the existingimpactUsedInloader data on the CO$idroute.
UI Changes
- Add-affected-item flow (
AffectedItemForm.tsx) — add a change-typeSelectat the top of the modal (Version / Revision / Replacement Part / New Part) as the single control that drives the form: Version/Revision/ Replacement Part reveal today's<Item>picker over existing Parts/Tools; New Part reveals a minimal new-part mini-form (auto-minted readableId with override viauseNextItemId, name, type Part/Tool, replenishment Buy/Make). Posts topath.to.changeOrderAffected; the action branches onchangeType(New Part →changeOrderNewPartValidator+ mint; others → existing path). This replaces the old add-then-switch-type default and makes the change type explicit at add time. - Change-type picker (
AffectedItemDetail.tsx) — rename theNew Partoption label to Replacement Part; the picker for an existing affected item offers {Version, Revision, Replacement Part} only. ANew Partline shows its type as a read-only "New Part" (no switcher). - Affected-item detail for New Part — reuse
PartProperties(attributes) and, for Make,BillOfMaterial/BillOfProcess; hide the cutover/Part Supersession card (extendshowCutoverto also excludeNew Part), since there is no predecessor. Part number editable (fresh number), like today's New Part. - Badge (
ChangeTypeBadge.tsx) — labels:Version N,New Revision(existing),Replacementfor Replacement Part,Newfor New Part (green). Reserve the plain "New" for the genuinely-new type. - Assembly BOM editor within a CO (
BillOfMaterial.tsx) — the add-material<Item>picker must be able to reference the current CO's New Part draft items (inactive). Include the CO's New Part drafts in the pickable set for an affected-assembly draft BOM. - Removed-component where-used — on the assembly's authoring diff
(
ChangeOrderDiffViewerremoved rows / the affected-itemAffectedItemDetail), show a small "used in N other assemblies" indicator per removed component, linking to that part's where-used. No obsolete action in v1. - Explorer (
ChangeOrderExplorer.tsx) — a New Part row shows "NEW → {minted number}" (no "OLD →"), consistent with the existing OLD→NEW rows.
Acceptance Criteria
- The change-type enum reads
Version, Revision, Replacement Part, New Part; an existing CO whose affected item wasNew Partnow displays Replacement Part with itsaffectedPart → newPartsupersession intact after release (behavior unchanged, label changed). - From a change order, "Create new part" mints an inactive Part with an auto-minted number (overridable), adds it as a New Part affected item with its own explorer row and draft; the affected-item detail shows attributes and (for Make) empty BOM/BOP editors and no cutover card.
- Releasing a CO with a New Part activates the new item (
active = true,changeOrderIdstamped) and its draft method, and writes noitemSupersessionfor it; the item appears as a normal active part. - Consolidation end-to-end: on an assembly, a Version change removes 3
component lines and adds a line referencing a New Part (added in the same
CO); the CO's Changes diff shows
−×3 and+×1; after release the assembly's active method has the new BOM and the 3 removed parts are untouched everywhere else (no supersession redirect fires for them inget-method/MRP). - The change-type switcher on an existing affected item cannot select
New Part; aNew Partaffected item cannot be switched to another type. - Each removed component on the assembly diff shows how many other assemblies still use it (where-used), with no auto-obsolete action taken.
-
New Partis rejected for Materials/Consumables/Services. - Typecheck, biome, and the items unit tests pass;
diffMethodadd/remove classification is covered by a test for the consolidation case.
Risks
| Risk | Severity | Mitigation |
|---|---|---|
The string 'New Part' currently means replacement; after migration it means net-new. Missed branches silently change behavior. |
High | Enumerate every === "New Part" / "New Part" literal (grep) and re-point to "Replacement Part"; add the net-new branches separately. Cover with the acceptance test that an old New Part still supersedes as "Replacement Part". |
Postgres ADD VALUE can't be used in the same txn that references it. |
Med | Land RENAME + ADD in a migration that does not itself reference the new value; regenerate types after apply. |
| Assembly BOM editor can't pick an inactive New Part draft, breaking consolidation. | Med | Explicitly include the CO's New Part drafts in the affected-assembly BOM item picker; inactive items are already legal BOM components. |
| Release ordering: assembly method activates while its New Part is still inactive. | Med | applyChangeOrder reveals New Part affected items before assembly affected items; idempotent per item on retry. |
| Scope creep into global mass-replace / auto-obsolete. | Low | Explicitly out of scope for v1 (research: local per-BOM replace + manual obsolete is the norm). |
Renaming a live enum value touches the changeOrders view / generated types. |
Low | Enum value rename does not change columns; CREATE OR REPLACE/regen only if a view string-matches the value (none do); run generate:types. |
Open Questions
Resolved with the user before writing (Step 5). Audit trail — all answered.
- New Part item scope: Make + Buy, or Buy-only for v1? — Answer: Make + Buy. Reuses the existing embedded BOM/BOP editors; the delta is an empty draft method vs a copied one. Lets the consolidated "1" be a make sub-assembly.
- Can a CO add a New Part standalone (no assembly change)? — Answer: Yes. A New Part can be introduced on its own; consolidation is New Part + an assembly Version change bundled. Also supports plain "new part under an ECO".
- Name for the renamed 1:1-supersession type? — Answer: Replacement Part. Industry-legible (Replace/Supersede vocabulary); reads clearly beside Version/Revision/New Part.
- What does v1 do about components removed from the assembly's BOM? —
Answer: Show where-used, manual obsolete. Surface where the removed
parts are used elsewhere (reuse
getPartUsedIn); never auto-obsolete — matches every surveyed system.
Changelog
- 2026-07-19: Created. Research (
.ai/research/2026-07-19-co-part-consolidation.md, 11 PLM/ERP systems) + 4 open questions resolved with the user before writing.