Demand Forecast Consumption

Status: implemented (PR #1601; plan .ai/plans/2026-09-11-demand-forecast-consumption.md complete, 10/10 tasks) Author: Claude (feature run .ai/runs/2026-09-11-demand-forecast-consumption.md) Date: 2026-09-11 Research: .ai/research/demand-forecast-consumption.md Audit: .ai/runs/2026-09-11-demand-forecast-consumption-audit.md

TLDR

Actual demand (open sales order lines and job-material lines) will consume the authored demand forecast (demandProjection) so the two never double-count: per weekly bucket, MRP demand becomes actuals + unconsumed forecast remainder — which equals max(forecast, actuals) when both land in the same week — with a bucket-granular backward-then-forward consumption window so an order landing in a zero-forecast week consumes the nearest adjacent forecast. Consumption is computed regeneratively inside runMrp (nothing to un-consume; cancelled orders and edited forecasts self-heal on the next run, no sales↔production communication required) and persisted as demandProjection.consumedQuantity, which every read path (both planning RPCs, generatePlanningActions, inventory quantities, the item planning chart) subtracts — one implementation, read everywhere.

The audit refuted the premise that same-week netting already works. Today forecast and actuals are summed in four independent places; 10 forecast + 10 SOs = 20 demand. This spec fixes the same-week case and the gap case in one mechanism.

Problem Statement

demandProjection (the authored forecast) and actual demand are both fed to MRP at face value and added (audit §3):

  • mrp.ts:442-515 — projections and SO lines write to the same grossDemand key additively.
  • get_production_planning / get_purchasing_planning demand_data CTEs — demandActual + demandForecast + demandProjection, summed.
  • planning-actions.ts:529-574 — the same union in Node for change actions.
  • get_inventory_quantities — sums actual + forecast (and omits projections entirely).

Concretely, for one item/location/week with forecast 10:

Open SOs Demand today Correct
10 20 10
5 15 10
12 22 12

And the gap case: forecast 0, 10, 0, 10 across weeks 1–4; an SO for 10 due in week 3 adds 10 on top of the untouched week-2 and week-4 forecasts — the order that is the forecasted demand, counted twice. Because the planning RPCs project a cumulative running balance, a double count in week 3 depresses the projected balance for every subsequent week — over-ordering across the whole horizon, not a one-week blip.

Make-to-stock jobs are not part of the problem: they are supply, netted once by explodeBom's running balance (audit §4), and the SO↔linked-job dedup already works. What's missing is exclusively forecast-vs-actual-demand consumption.

Proposed Solution

The algorithm (industry-standard forecast consumption, bucket-granular)

A pure function consumeForecast in packages/planning/src/mrp/forecast-consumption.ts:

Inputs, per (itemId, locationId):
  forecast:  Map<periodIndex, qty>   // demandProjection rows within the horizon
  actuals:   Map<periodIndex, qty>   // consumption quantities (see below)
  window:    { backward: B, forward: F }   // in periods (weeks)

Walk actuals in ascending period order. Each actual quantity consumes forecast:
  1. its own period first,
  2. then backward: p−1, p−2, … p−B (nearest first),
  3. then forward: p+1, … p+F (nearest first),
decrementing remaining forecast as it goes. Excess actual beyond reachable
forecast consumes nothing further (it simply stands as real demand).

Outputs:
  consumed:  Map<periodIndex, qty>   // per forecast period, how much was consumed
  remainder: Map<periodIndex, qty>   // forecast − consumed, floored at 0

Net demand per period = actuals[p] (demand quantity) + remainder[p].

Properties:

  • Same-bucket cases reduce to max(forecast, actuals): 10F/10SO→10, 10F/5SO→10, 10F/12SO→12.
  • Gap case (F = 0,10,0,10; SO 10 due wk3, B≥1): wk2 forecast fully consumed; demand = 10 (SO, wk3) + 10 (forecast, wk4). No double count, and the still-unmaterialized second month's forecast survives.
  • B = F = 0 degrades to strict same-bucket netting.
  • Deterministic: earlier actuals claim forecast first; backward always precedes forward (SAP mode 2 / Oracle / SyteLine consensus — a "late" order belongs to the just-passed forecast).
  • Past-due actuals are already dumped into period[0] by findPeriod, so they consume the current week's forecast then forward — no special-casing.
  • Past forecast (projection rows whose periodId predates the horizon) is already inert in both the engine and the RPCs (periodId never matches a horizon period); it stays that way — self-expiring, no SAP-style cleanup job.

Where it runs and how it propagates (compute once, read everywhere)

Computed in runMrp Phase 4 (before the Phase-4.5 supersession redirect):

  1. Build the actuals maps first (SO + job-material loops, as today).
  2. Run consumeForecast per (item, location).
  3. Add the remainder (not the raw forecastQuantity) to grossDemand; projection contributor rows in demandForecastSource carry the remainder (a fully consumed projection contributes no row).
  4. In the existing atomic Phase-7 transaction, persist per-row demandProjection.consumedQuantity (rounded at internal scale via round() from @carbon/utils at the persist boundary; horizon rows only, others untouched).

Read paths subtract, never re-implement. Every reader changes its projection term from forecastQuantity to GREATEST("forecastQuantity" - "consumedQuantity", 0):

Read site Change
get_production_planning demand_data (fork of 20260715195226) projection arm nets
get_purchasing_planning demand_data (fork of 20260831190142) projection arm nets
planning-actions.ts:529-574 union select both columns, net in TS
get_inventory_quantities (fork of 20260716142907, the newest def) add net projection arm (fixes its existing omission of projections)
getItemDemand (items.service.ts:647) add net projections (fixes the planning-chart blind spot)

Freshness note: demandActual is already an MRP output (rebuilt each run, cron every 3 h + manual Recalculate), so the read paths are already run-stale for actuals. Netting the projection arm with a run-stamped consumedQuantity makes the projection term consistent with the actual term rather than fresher than it. A projection authored between runs counts at face value until the next run — the same grace it gets today.

What consumes, what doesn't

Source Role
Open SO lines (openSalesOrderLines) consume, at the line's pre-job-dedup open quantity (new view column quantityToConsume — see Data Model). Demand contribution stays the deduped quantityToSend. Without this, an MTO order fully covered by its linked job would consume nothing and its forecast would drive phantom stock production.
Open job-material lines (openJobMaterialLines) consume projections on their own (component) item — real dependent demand consuming a component-level forecast.
Make-to-stock jobs (openProductionOrders) never consume — they are supply, already netted once by the running balance (SAP/Oracle/Epicor consensus: production is relieved on the supply side).
BOM-exploded planned dependent demand does not consume component projections in v1 (SAP strategy-40 default; strategy-70-style dependent-demand consumption is a possible later opt-in).

Consumption is strictly per (itemId, locationId) — an order at location A never consumes a forecast at location B (matches the tables' keys and every surveyed vendor).

Configuration (flat, company-level)

Two integer columns on companySettings, following rescheduleToleranceDays precedent:

  • forecastConsumptionBackwardPeriods — default 4 (bridges monthly-granularity forecasts authored on the weekly grid; Oracle's guidance "backward ≈ one bucket span" scaled to the common author-monthly pattern)
  • forecastConsumptionForwardPeriods — default 1 (early orders; every vendor warns against large forward windows)

0/0 = strict same-week netting. No per-item override, no matrix (per the no-matrix-config principle; SyteLine/Epicor per-item overrides are the request to watch for later). Surfaced in the same settings UI as rescheduleToleranceDays.

Design Decisions

Decision Choice Rationale
Netting formula actuals + unconsumed remainder (≡ max same-bucket) The user's three cases; APICS/SAP/Oracle/SyteLine consensus (research §Pattern 1)
Compute timing Regenerative, inside runMrp; no stored consume/unconsume events Self-healing with zero deconsumption machinery (SAP-dynamic/Fusion/D365 pattern); fits Carbon's wipe-and-rewrite MRP outputs
Window granularity Whole periods (weeks), not days Forecast is bucket-native (periodId); day windows are the documented Epicor/SyteLine footgun class (research §Pattern 4)
Search order Own bucket → backward → forward, nearest-first, earlier actuals first Cross-vendor consensus; deterministic
Persistence demandProjection.consumedQuantity NUMERIC NOT NULL DEFAULT 0, MRP-written One implementation feeds all five read sites; enables "consumed" display in the forecast grid; PK (itemId, locationId, periodId) already matches the consumption grain. Deliberately supersedes the MRP-v2 spec's "demandProjection gains no columns" scope note
Consumption vs supersession order Consume before the Phase-4.5 redirect (authored item identity) The read path does not redirect projections/actuals at all today (audit §7); pre-redirect consumption keeps engine and grid consistent. Successor-aware consumption lands with the (pre-existing, separately tracked) read-path redirect work
Current-week forecast Kept, consumed normally — no D365-style drop-today rule Week 0 is 0–6 days out; job-shop orders due this week were often booked weeks ago and consume it anyway. A drop-current-week knob can come later if wanted
SO consumption quantity quantityToSend pre-job-dedup (quantityToConsume view column) MTO correctness (above). Partially-shipped lines under-consume until their week rolls out of horizon — bounded wobble, accepted for v1 (SAP solves it with persisted goods-issue reduction; not worth the state)
Heuristic 1 (multi-tenancy) No new tables; new columns on existing RLS'd tables demandProjection + companySettings already carry companyId + RLS
Heuristic 2/6 (service/module shape) No new service files; changes live in production.service.ts, items.service.ts, @carbon/ee planning Existing module layout
Heuristics 3/4/5 No new tables/routes/forms except settings fields on the existing settings form Existing ValidatedForm + action; settings permission scope unchanged
Heuristic 7 (compat) Additive columns with defaults; view gains a column; RPC signatures unchanged Zero-downtime; old readers unaffected

Data Model Changes

One migration (idempotent per lessons; randomized HHMMSS timestamp):

-- 1. Consumption state (MRP-written, derived — never user-authored)
ALTER TABLE "demandProjection"
  ADD COLUMN IF NOT EXISTS "consumedQuantity" NUMERIC NOT NULL DEFAULT 0;

-- 2. Company-level consumption window
ALTER TABLE "companySettings"
  ADD COLUMN IF NOT EXISTS "forecastConsumptionBackwardPeriods" INTEGER NOT NULL DEFAULT 4,
  ADD COLUMN IF NOT EXISTS "forecastConsumptionForwardPeriods" INTEGER NOT NULL DEFAULT 1;

-- 3. openSalesOrderLines: expose the pre-job-dedup open quantity
--    (fork newest def from 20260811123619_widen-sales-production-scale.sql;
--     DROP VIEW IF EXISTS + recreate WITH (security_invoker=true);
--     add: sol."quantityToSend" AS "quantityToConsume" alongside the existing
--     job-deduped "quantityToSend" CASE expression)

-- 4. get_production_planning / get_purchasing_planning: fork newest defs
--    (20260715195226 / 20260831190142); demandProjection arm becomes
--    GREATEST(dp."forecastQuantity" - dp."consumedQuantity", 0).

-- 5. get_inventory_quantities: fork newest def (20260316000000); ADD the
--    net-projection arm to its demand CTE (currently omits projections).

No RLS changes (existing table policies cover the new columns). No new enums. pnpm run generate:types after; types propagate via Awaited<ReturnType> chains.

API / Service Changes

  • packages/planning/src/mrp/forecast-consumption.ts (new): pure consumeForecast(forecast, actuals, window) + types. Sibling forecast-consumption.test.ts (vitest, pnpm --filter @carbon/ee test).
  • packages/planning/src/mrp/mrp.ts: Phase 4 reordered — actuals loops first (also accumulating per-key quantityToConsume), then projections loop runs consumeForecast per (item, location) and adds remainders to grossDemand / contributors; reads the two window settings from companySettings once per run; Phase 7 persists consumedQuantity (batched update inside the existing transaction). Also fix the vestigial netDemand name and stale migration-filename comment flagged by the audit while in there.
  • packages/planning/src/mrp/planning-actions.ts: projection query selects forecastQuantity, consumedQuantity; union adds the GREATEST diff.
  • apps/erp/app/modules/items/items.service.ts getItemDemand: add net projections so the item planning chart agrees with the planning grid.
  • upsertDemandProjections needs no change: PostgREST upserts only update the columns present in the payload, so consumedQuantity survives a re-authored forecast (and keeping it until the next run is more accurate than resetting — the remainder stays netted). Zero-quantity weeks delete the row, which correctly deletes its consumption state with it.
  • Settings action/validator for the two new fields (existing settings form pattern).

UI Changes

  • Settings (wherever rescheduleToleranceDays lives): two number fields — "Forecast consumption: weeks backward / weeks forward", with help text.
  • DemandProjectionForm 52-week grid: per-cell read-only annotation of consumed quantity (e.g. muted "8 consumed" under the input) so a planner can see the forecast self-healing. Copy the nearest existing grid-annotation precedent; no new interaction.
  • Planning grids / worklists: no UI change — they reflect net demand automatically via the RPC/union changes.
  • i18n: new strings through Lingui extract + /translate at commit time.

Docs / knowledge sync (required by keep-sources-in-sync)

  • docs/content/docs/reference/forecast.mdx (the agent knowledge base is baked from it) — currently documents the additive behavior as intentional; rewrite for consumption (and fix its stale paths).
  • .claude/rules/mrp-system.md — describe consumption in the run flow.
  • MRP v2 spec (.ai/specs/2026-08-22-mrp-v2-planned-order-generation.md) — changelog note that demandProjection now gains consumedQuantity, superseding its §scope line.

As Built

Where the shipped code differs from the design below:

  • One migration, every read path. 20261006130001_demand-forecast-consumption.sql holds all of it: the two columns, openSalesOrderLines.quantityToConsume, and the netted get_production_planning, get_purchasing_planning and get_inventory_quantities. The last two are forked from the guarded 20260925121735_rpc-function-guards.sql bodies (they open with assert_company_access), not from the defs named in Data Model Changes.
  • consumeForecast lives in @carbon/planning (packages/planning/src/mrp/forecast-consumption.ts); its tests run with pnpm --filter @carbon/planning test, not @carbon/ee.
  • The item planning chart nets in the route, not the service. getItemDemand returns raw projections; api+/items.$id.$locationId.forecast.ts subtracts consumedQuantity before merging them into the chart.
  • Settings. The window is the "Forecast Consumption" card on Settings → Planning, fields "Look back (weeks)" and "Look ahead (weeks)" (defaults 4 and 1).

Verification (.ai/runs/2026-09-11-demand-forecast-consumption.md, Phase 5): unit tests, plus a real MRP run on a seeded company proving same-week netting (forecast 30 + SO 30 → 30), a partial forecast (20 + SO 30 → 30), the gap case (an SO reaching back into the previous week's forecast, no double count), a 0/0 window turning reach-back off, the settings card and the grid annotation. The run record does not show the MTO-covered line, the re-saved cell, or the four-surface agreement criteria below exercised one by one, so their boxes are left unticked.

Acceptance Criteria

  • Unit (forecast-consumption.test.ts): same-bucket 10F/10A→10, 10F/5A→10, 10F/12A→12 (net totals); gap 0,10,0,10 + actual 10 in p3 with B=1 → wk2 remainder 0, wk4 remainder 10; forward-only reach (actual in p1, forecast in p2, F=1) consumes; window exhaustion leaves excess actual standing; B=F=0 ≡ per-bucket max; two actuals competing for one forecast bucket resolve earlier-period-first; actual beyond all forecast in window consumes nothing outside it.
  • After an MRP run with forecast 10 and one open SO of 10 in the same week (no stock/supply): production planning grid shows week demand 10, and exactly one Make/Order suggestion of 10 for that item.
  • Gap scenario seeded end-to-end (forecast weeks 2 & 4 = 10, SO 10 due week 3): total horizon demand for the item is 20 (10 SO + 10 remaining forecast), planning actions suggest supply for 20, and demandProjection.consumedQuantity = 10 on the week-2 row, 0 on week-4.
  • With forecast 10 and SOs totalling 12 in-window: demand 12; no forecast remainder.
  • MTO SO line fully covered by a linked live job still consumes its week's forecast (grid demand shows no phantom forecast remainder).
  • Forecast edit grid displays consumed quantities after a run; a re-saved cell keeps its consumption (remainder stays netted) until the next run recomputes it.
  • get_production_planning, get_purchasing_planning, planningAction worklist, and Inventory quantities agree on the same net demand for the seeded scenarios.
  • pnpm --filter @carbon/ee test, scoped typechecks, pnpm db:migrate + pnpm run generate:types, pnpm db:check:datasets and pnpm db:check:backups all green.

Risks

Risk Severity Mitigation
A read site is missed and grid/worklist disagree (the audit's four-site trap) High The five-site table above is the checklist; acceptance criterion pins cross-surface agreement; grep for demandProjection at plan time to catch stragglers
Staleness between runs (new SO consumes nothing until next run) Med Same staleness contract as demandActual today (3 h cron + manual Recalculate); documented in the KB doc
Partial-shipment under-consumption wobble Low Bounded to the current week; self-heals when the week rolls; noted for a future goods-issue-analog refinement
Supersession read-path divergence for superseded items Med (pre-existing) Not worsened (consumption runs pre-redirect); tracked as the existing read-path redirect gap (audit §7)
consumedQuantity default backfill on a large demandProjection table Low ADD COLUMN ... DEFAULT 0 is metadata-only on PG11+; no rewrite
Window defaults wrong for some tenants Low Company-settable; 0/0 opt-out; defaults grounded in research

Open Questions

All resolved autonomously (research + codebase precedent) per the declared run mode; Brad vetoes at the plan gate before any execution. Items 1–3 are effectively fixed by the user's own problem statement; 4–9 are the judgment calls to eyeball.

  • Same-bucket semantics? — Autonomous: actuals + unconsumed remainder (≡ max), exactly the user's three worked cases; APICS consensus.
  • Do jobs consume forecast? — Autonomous: No — MTS jobs are supply (already netted); job-material lines DO consume component-level projections. Matches the user's "jobs net out" intent and SAP/Oracle/Epicor.
  • How do gaps heal? — Autonomous: bucket-granular backward(4)-then-forward(1) window; the user's 0/10/0/10 example nets correctly with B≥1.
  • Window unit and config surface? — Autonomous: whole weeks (periods), two company-level companySettings columns, defaults 4/1, no per-item matrix. Alternatives (day windows, per-item overrides) rejected as the documented vendor footgun / config sprawl.
  • Recompute vs stored consumption state? — Autonomous: regenerative in runMrp, persisted only as derived consumedQuantity output. Stored consume/unconsume events (Oracle EBS) rejected — deconsumption machinery for no benefit at Carbon's run cadence.
  • Where does the net live so all readers agree? — Autonomous: demandProjection.consumedQuantity + GREATEST subtraction at five read sites; supersedes MRP-v2's "no new columns on demandProjection" scope note.
  • Which SO quantity consumes? — Autonomous: pre-job-dedup quantityToSend (new quantityToConsume view column); deduped quantity stays the demand driver. Full-sale-quantity (shipment-proof) variant deferred.
  • Consumption vs supersession ordering? — Autonomous: consume first, on authored identity — keeps engine consistent with the (non-redirecting) read path; successor-aware consumption rides the existing read-path redirect gap.
  • Current-week forecast dropped (D365) or kept? — Autonomous: kept and consumable; drop rule deferred as a possible future knob.

Changelog

  • 2026-09-11: Created after Phase-0 audit (refuted existing-netting belief) and 4-vendor research; all open questions autonomously resolved for veto at the plan gate.
  • 2026-09-11 (plan phase): corrected get_inventory_quantities fork source to the true newest def (20260716142907); dropped the upsertDemandProjections reset — PostgREST upserts preserve absent columns, so consumption state survives re-authoring (deliberately kept until next run).
  • 2026-09-11 (execute): approved by Brad; implementation started. Docs correction: the agent-KB forecast doc is generated from docs/content/docs/reference/forecast.mdx (edit source + generate:agent-kb, per .claude/rules/agent-knowledge-base.md), not the kb/ copy directly.
  • 2026-10-04: implemented on mrp-action-suggestions (PR #1601); moved to implemented/. Added As Built: the read paths ship in one migration, consumeForecast is in @carbon/planning, and the chart nets in its route.