Skip to content

Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.

2.2 KB
Raw Blame

Change notices

Draft an engineering change against real methods, review it as a diff, and release it so planning supersedes the versions it replaces. Plus inventory valuation, Service items, and assembly instructions.

A docs/reference/change-orders groups the parts whose designs are changing, revises each one on a hidden draft, and releases them together. It answers what changed, who owns it, and what the new version supersedes, without touching a live method until release. You pick the affected items, edit each one's real bill of materials and bill of process inside the notice, review it as a diff with new part properties highlighted, and link issues to it. Change notices live under Items → Change notices.

Inventory valuation and Service items

The inventory valuation report ties on-hand stock to the ledger, and inventory adjustments post to the GL. Service is now a first-class item type. The accounting period close has a full lifecycle with a close checklist and posted-record immutability.

  • Assembly instructions on items.

  • Short-close purchase order lines, with partial goods-receipt visibility.

  • MES suggests a batch on issue and returns unused picks when a job completes.

  • Overhead absorption and account defaults improvements, with draft journals excluded from reports.

  • Raw materials and finished goods accounts.

  • Self-serve enrollment in the Implementation Hub.

  • A faster CAD pipeline with a progressive 3D viewer.

  • Top-level external notes are included in document emails.

  • Detail pages show the entity id in the breadcrumb.

  • Korean translation.

  • Academy: Engineering Change Orders video.

  • GAAP-correct journal entries for fixed asset registration and disposal.

  • Purchase price variance is no longer double-counted; the GL and cost subledger move together.

  • Default markup no longer overwrites set quote-line prices.

  • Subassemblies are scheduled by their item lead time.

  • Planning reads top-level demand projections.

  • Invoicing quantities are short-close aware.

  • Customer reference, salesperson, and engineering contact carry through to sales orders.

  • Selling a fixed asset no longer requires a method type.

  • The first tag can be created when none exist.

  • MES add-row suggestions prefer the pick-method order and clamp batch quantity.