Skip to content

Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.

2.7 KB
Raw Blame
---
title: "Change notices"
description: "Draft an engineering change against real methods and review it as a diff. Plus inventory valuation and assembly instructions."
date: "2026-07-21"
tags: ["items", "accounting", "inventory"]
image: "/changelog/2026-07-21-inventory-valuation.svg"
---

A design change usually touches several parts at once. Change notices let you revise them together and release them together.

## Change notices

A [change notice](/docs/reference/change-orders) groups the parts whose designs are changing, revises each one on a hidden draft, and releases them together. It answers what changed, who owns it, and what the new version supersedes, without touching a live method until release.

Pick the affected items, edit each one's real bill of materials and bill of process inside the notice, review it as a diff with new part properties highlighted, and link issues to it. Change notices live under **Items → Change notices**.

## Inventory valuation

The inventory valuation report ties on-hand stock to the ledger, and [inventory](/docs/reference/inventory) adjustments post to the general ledger.

## Service items and period close

Service is now a first-class [item](/docs/reference/items) type. The accounting [period close](/docs/reference/period-close) has a full lifecycle, with a close checklist and posted-record immutability.

<Accordion title="Improvements">

- Assembly instructions on items.
- Short-close purchase order lines, with partial goods-receipt visibility.
- MES suggests a batch on issue and returns unused picks when a job completes.
- Overhead absorption and account defaults improvements, with draft journals excluded from reports.
- Raw materials and finished goods accounts.
- Self-serve enrollment in the Implementation Hub.
- A faster CAD pipeline with a progressive 3D viewer.
- Top-level external notes are included in document emails.
- Detail pages show the entity id in the breadcrumb.
- Korean translation.
- Academy: Engineering Change Orders video.

</Accordion>

<Accordion title="Fixes">

- GAAP-correct journal entries for fixed asset registration and disposal.
- Purchase price variance is no longer double-counted; the GL and cost subledger move together.
- Default markup no longer overwrites set quote-line prices.
- Subassemblies are scheduled by their item lead time.
- Planning reads top-level demand projections.
- Invoicing quantities are short-close aware.
- Customer reference, salesperson, and engineering contact carry through to sales orders.
- Selling a fixed asset no longer requires a method type.
- The first tag can be created when none exist.
- MES add-row suggestions prefer the pick-method order and clamp batch quantity.

</Accordion>