Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.
TypeScript ai-agentsbill-of-materialserpinventory-managementleanmanufacturingmanufacturing-execution-systemmcp-servermesmrpopen-source-erppostgresqlproduction-planningqmsquality-management-systemreact-routerself-hostedsupabasetraceabilitytypescript
// SPDX-License-Identifier: AGPL-3.0-only
// Carbon (github.com/crbnos/carbon). Modified or adapted versions of this file,
// including ports, remain AGPLv3; serving them over a network requires releasing their source.
import type { ChangeOrderData, ChangeOrderSpec } from "../../types.ts";
export const CHANGE_ORDERS: ChangeOrderSpec[] = [
{
ref: "co:draft",
name: "BAT-TRAY-710 — tray layup change for the revised pack latch",
type: "Engineering",
status: "Draft",
openDateOffset: -346,
affectedItems: [
{
item: "BAT-TRAY-710",
changeType: "Version",
sortOrder: 1
}
]
},
{
ref: "co:impl",
name: "HRN-100 connector revision — short circuit mitigation",
type: "Engineering",
status: "Implementation",
openDateOffset: -307,
affectedItems: [
{
item: "HRN-100",
changeType: "Revision",
sortOrder: 1,
supersessionMode: "Consume First",
discontinuationOffset: 48,
successorEffectivityOffset: 49,
revision: {
revision: "A",
unitSalePrice: 3600,
description:
"Rev A — potted connector backshells replace the screw-clamp strain relief and remove the short-circuit path",
bomEdits: [
{ op: "delete", component: "FST-M3-TI" },
{ op: "setQuantity", component: "MAT-KAPTON", quantity: 6 },
{ op: "add", component: "MAT-POTTING-EP", quantity: 0.25, order: 3 }
],
operationEdits: [
{
order: 2,
description: "Continuity, insulation resistance & hipot test",
laborTime: 3
}
]
}
}
]
},
{
ref: "co:done",
name: "Introduce the ISR-4 airframe under change control",
type: "Engineering",
status: "Done",
openDateOffset: -377,
affectedItems: [
{
item: "AFR-100",
changeType: "New Part",
sortOrder: 1
}
]
},
// Lifecycle-only notices: no affected items yet (every change type spins a
// method draft), so they exercise the stage flow + action tasks alone.
{
ref: "co:start",
name: "Relocate PDB connector bracket to clear harness bend radius",
type: "Engineering",
changeOrderType: "Design Improvement",
status: "Start",
priority: "Medium",
openDateOffset: -9,
dueDateOffset: 30,
reasonForChange:
"Integration found the power harness exceeds its minimum bend radius at the current bracket location.",
affectedItems: [],
actionTasks: [
{ action: "Engineering Review", status: "In Progress", dueDateOffset: 5 },
{ action: "Update Drawings / CAD", status: "Pending", dueDateOffset: 20 }
]
},
{
ref: "co:eng-complete",
name: "Add ultrasonic delamination scan to the carbon arm receiving plan",
type: "Manufacturing",
changeOrderType: "Quality / Reliability Improvement",
status: "Engineering Complete",
priority: "High",
openDateOffset: -70,
dueDateOffset: 14,
reasonForChange:
"The Sentry arm escape showed visual inspection alone cannot catch internal delamination in a pultruded arm.",
nonConformance: "ncr:tank-wall",
affectedItems: [],
actionTasks: [
{
action: "Quality Review",
status: "Completed",
dueDateOffset: -45,
completedOffset: -48
},
{
action: "Notify Affected Parties",
status: "In Progress",
dueDateOffset: 7
}
]
},
{
ref: "co:cancelled",
name: "Update EO/IR gimbal ICD for the revised dovetail pattern",
type: "Documentation",
changeOrderType: "Documentation Error / Correction",
status: "Cancelled",
priority: "Low",
openDateOffset: -120,
reasonForChange:
"Vendor proposed a new GMB-EOIR-640 dovetail pattern; they later withdrew it and kept the fielded interface.",
affectedItems: [],
actionTasks: [
{
action: "Cost Impact Review",
status: "Completed",
dueDateOffset: -110,
completedOffset: -112
},
{ action: "Update Drawings / CAD", status: "Skipped" }
]
}
];
export const defenseChangeOrders: ChangeOrderData = {
changeOrders: CHANGE_ORDERS
};