import type { ChangeOrderData, ChangeOrderSpec } from "../../types.ts";
export const CHANGE_ORDERS: ChangeOrderSpec[] = [
{
ref: "co:draft",
name: "TRM-BOX-9000 — cable gland relocation",
type: "Engineering",
status: "Draft",
openDateOffset: -346,
affectedItems: [
{
item: "TRM-BOX-9000",
changeType: "Version",
sortOrder: 1
}
]
},
{
ref: "co:impl",
name: "COIL-9000 revision — Class H insulation system upgrade",
type: "Engineering",
status: "Implementation",
openDateOffset: -307,
affectedItems: [
{
item: "COIL-9000",
changeType: "Revision",
sortOrder: 1,
supersessionMode: "Consume First",
discontinuationOffset: 48,
successorEffectivityOffset: 49,
revision: {
revision: "A",
unitSalePrice: 505,
description:
"Rev A — coils are trickle-varnished in Class H resin before insertion, replacing the loose Nomex slot liner",
bomEdits: [
{ op: "delete", component: "MAT-INS-NOMEX" },
{ op: "setQuantity", component: "MAT-CU-18AWG", quantity: 7 },
{ op: "add", component: "MAT-VARNISH", quantity: 0.25, order: 3 }
],
operationEdits: [
{
order: 1,
description: "Wind, form and trickle-varnish the coil set",
laborTime: 3
}
]
}
}
]
},
{
ref: "co:done",
name: "Introduce the 4500-frame stator under change control",
type: "Engineering",
status: "Done",
openDateOffset: -377,
affectedItems: [
{
item: "STA-4500",
changeType: "New Part",
sortOrder: 1
}
]
},
// Lifecycle-only notices: no affected items yet (every change type spins a
// method draft), so they exercise the stage flow + action tasks alone.
{
ref: "co:start",
name: "Add strain-relief boss at the HSG-9000 encoder cable exit",
type: "Engineering",
changeOrderType: "Design Improvement",
status: "Start",
priority: "Medium",
openDateOffset: -9,
dueDateOffset: 30,
reasonForChange:
"Dyno vibration runs showed the encoder cable flexing at the end-bell exit; two line-driver conductors fatigued inside the jacket.",
affectedItems: [],
actionTasks: [
{ action: "Engineering Review", status: "In Progress", dueDateOffset: 5 },
{ action: "Update Drawings / CAD", status: "Pending", dueDateOffset: 20 }
]
},
{
ref: "co:eng-complete",
name: "Add slot-liner thickness check to the Nomex receiving plan",
type: "Manufacturing",
changeOrderType: "Quality / Reliability Improvement",
status: "Engineering Complete",
priority: "High",
openDateOffset: -60,
dueDateOffset: 14,
reasonForChange:
"The Copperline Nomex escape showed a label and cert review alone cannot catch under-thickness slot liner before it reaches the winding line.",
nonConformance: "ncr:nomex-thin",
affectedItems: [],
actionTasks: [
{
action: "Quality Review",
status: "Completed",
dueDateOffset: -45,
completedOffset: -48
},
{
action: "Notify Affected Parties",
status: "In Progress",
dueDateOffset: 7
}
]
},
{
ref: "co:cancelled",
name: "Revise the TD-4500 nameplate drawing for a dual-voltage rating",
type: "Documentation",
changeOrderType: "Documentation Error / Correction",
status: "Cancelled",
priority: "Low",
openDateOffset: -120,
reasonForChange:
"Sales asked for a 230/460 V dual rating on the TD-4500; the customer later standardized on 460 V only and the single-voltage plate stays.",
affectedItems: [],
actionTasks: [
{
action: "Cost Impact Review",
status: "Completed",
dueDateOffset: -110,
completedOffset: -112
},
{ action: "Update Drawings / CAD", status: "Skipped" }
]
}
];
export const motorChangeOrders: ChangeOrderData = {
changeOrders: CHANGE_ORDERS
};