Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.
TypeScript ai-agentsbill-of-materialserpinventory-managementleanmanufacturingmanufacturing-execution-systemmcp-servermesmrpopen-source-erppostgresqlproduction-planningqmsquality-management-systemreact-routerself-hostedsupabasetraceabilitytypescript
// SPDX-License-Identifier: AGPL-3.0-only
// Carbon (github.com/crbnos/carbon). Modified or adapted versions of this file,
// including ports, remain AGPLv3; serving them over a network requires releasing their source.
import type { ChangeOrderData, ChangeOrderSpec } from "../../types.ts";
export const CHANGE_ORDERS: ChangeOrderSpec[] = [
{
ref: "co:draft",
name: "HRN-ARM-001 — wrist harness routing update",
type: "Engineering",
status: "Draft",
openDateOffset: -346,
affectedItems: [
{
item: "HRN-ARM-001",
changeType: "Version",
sortOrder: 1
}
]
},
{
ref: "co:impl",
name: "PCB-CTRL-R1 revision — EMI mitigation on the motion controller",
type: "Engineering",
status: "Implementation",
openDateOffset: -307,
affectedItems: [
{
item: "PCB-CTRL-R1",
changeType: "Revision",
sortOrder: 1,
supersessionMode: "Consume First",
discontinuationOffset: 48,
successorEffectivityOffset: 49,
revision: {
revision: "A",
unitSalePrice: 1030,
description:
"Rev A — one consolidated M23 connector and a UV-cured conformal coat stop drive noise coupling onto the encoder lines",
bomEdits: [
{ op: "setQuantity", component: "MAT-CONN-M23", quantity: 1 },
{ op: "add", component: "MAT-COAT-UV", quantity: 0.125, order: 4 }
],
operationEdits: [
{
order: 2,
description:
"Hand-solder the shielded connector, conformal coat and UV cure",
laborTime: 0.75
}
]
}
}
]
},
{
ref: "co:done",
name: "Introduce the J1 base assembly under change control",
type: "Engineering",
status: "Done",
openDateOffset: -377,
affectedItems: [
{
item: "ARM-BASE-001",
changeType: "New Part",
sortOrder: 1
}
]
},
// Lifecycle-only notices: no affected items yet (every change type spins a
// method draft), so they exercise the stage flow + action tasks alone.
{
ref: "co:start",
name: "Add a strain-relief clip at the J4 harness exit",
type: "Engineering",
changeOrderType: "Design Improvement",
status: "Start",
priority: "Medium",
openDateOffset: -9,
dueDateOffset: 30,
reasonForChange:
"Life testing showed the arm harness flexing past its minimum bend radius where it exits the J4 housing.",
affectedItems: [],
actionTasks: [
{ action: "Engineering Review", status: "In Progress", dueDateOffset: 5 },
{ action: "Update Drawings / CAD", status: "Pending", dueDateOffset: 20 }
]
},
{
ref: "co:eng-complete",
name: "Add a lost-motion bench test to the harmonic gear set receiving plan",
type: "Manufacturing",
changeOrderType: "Quality / Reliability Improvement",
status: "Engineering Complete",
priority: "High",
openDateOffset: -70,
dueDateOffset: 14,
reasonForChange:
"The Torqline gear-set escape showed certificate review alone cannot catch lost motion over the 1.0 arc-min limit.",
nonConformance: "ncr:gear-lost-motion",
affectedItems: [],
actionTasks: [
{
action: "Quality Review",
status: "Completed",
dueDateOffset: -45,
completedOffset: -48
},
{
action: "Notify Affected Parties",
status: "In Progress",
dueDateOffset: 7
}
]
},
{
ref: "co:cancelled",
name: "Update the servo drive wiring diagram for a revised STO terminal layout",
type: "Documentation",
changeOrderType: "Documentation Error / Correction",
status: "Cancelled",
priority: "Low",
openDateOffset: -120,
reasonForChange:
"Kestrel proposed moving the safe-torque-off terminals on the DRV-SRV-400; they later withdrew it and kept the existing pinout.",
affectedItems: [],
actionTasks: [
{
action: "Cost Impact Review",
status: "Completed",
dueDateOffset: -110,
completedOffset: -112
},
{ action: "Update Drawings / CAD", status: "Skipped" }
]
}
];
export const roboticsChangeOrders: ChangeOrderData = {
changeOrders: CHANGE_ORDERS
};