Skip to content

Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.

3.9 KB
Raw Blame
-- Configurable template actions for Change Orders. Mirrors nonConformanceRequiredAction,
-- but company-scoped with a composite PK and no systemType/protection (all CO templates
-- are freely deletable). New change orders instantiate one changeOrderActionTask per
-- active row (insertChangeOrder -> seedDefaultChangeOrderActions).

CREATE TABLE IF NOT EXISTS "changeOrderRequiredAction" (
  "id" TEXT NOT NULL DEFAULT id('cora'),
  "companyId" TEXT NOT NULL,
  "name" TEXT NOT NULL,
  "active" BOOLEAN NOT NULL DEFAULT TRUE,
  "createdBy" TEXT NOT NULL REFERENCES "user"("id"),
  "createdAt" TIMESTAMP WITH TIME ZONE NOT NULL DEFAULT NOW(),
  "updatedBy" TEXT REFERENCES "user"("id"),
  "updatedAt" TIMESTAMP WITH TIME ZONE,
  "customFields" JSONB,

  PRIMARY KEY ("id", "companyId"),
  FOREIGN KEY ("companyId") REFERENCES "company"("id") ON DELETE CASCADE
);

CREATE INDEX IF NOT EXISTS "changeOrderRequiredAction_companyId_idx" ON "changeOrderRequiredAction" ("companyId");
CREATE INDEX IF NOT EXISTS "changeOrderRequiredAction_createdBy_idx" ON "changeOrderRequiredAction" ("createdBy");

ALTER TABLE "changeOrderRequiredAction" DROP CONSTRAINT IF EXISTS "changeOrderRequiredAction_companyId_name_key";
ALTER TABLE "changeOrderRequiredAction" ADD CONSTRAINT "changeOrderRequiredAction_companyId_name_key" UNIQUE ("companyId", "name");

-- Single-column unique on the (globally unique) id so changeOrderActionTask.actionTypeId
-- can FK to it despite the composite PK.
ALTER TABLE "changeOrderRequiredAction" DROP CONSTRAINT IF EXISTS "changeOrderRequiredAction_id_key";
ALTER TABLE "changeOrderRequiredAction" ADD CONSTRAINT "changeOrderRequiredAction_id_key" UNIQUE ("id");

ALTER TABLE "public"."changeOrderRequiredAction" ENABLE ROW LEVEL SECURITY;

CREATE POLICY "SELECT" ON "public"."changeOrderRequiredAction"
FOR SELECT USING (
  "companyId" = ANY ((SELECT get_companies_with_employee_role())::text[])
);

CREATE POLICY "INSERT" ON "public"."changeOrderRequiredAction"
FOR INSERT WITH CHECK (
  "companyId" = ANY ((SELECT get_companies_with_employee_permission('parts_create'))::text[])
);

CREATE POLICY "UPDATE" ON "public"."changeOrderRequiredAction"
FOR UPDATE USING (
  "companyId" = ANY ((SELECT get_companies_with_employee_permission('parts_update'))::text[])
);

CREATE POLICY "DELETE" ON "public"."changeOrderRequiredAction"
FOR DELETE USING (
  "companyId" = ANY ((SELECT get_companies_with_employee_permission('parts_delete'))::text[])
);

-- Backfill defaults for existing companies (system user for the createdBy FK;
-- idempotent via the (companyId, name) unique constraint).
INSERT INTO "changeOrderRequiredAction" ("companyId", "name", "createdBy")
SELECT c."id", action.name, 'system'
FROM "company" c
CROSS JOIN (VALUES
  ('Engineering Review'),
  ('Update Drawings / CAD'),
  ('Update BOM / Routing'),
  ('Cost Impact Review'),
  ('Quality Review'),
  ('Inventory Disposition (rework / scrap / use-as-is)'),
  ('Notify Affected Parties')
) AS action(name)
ON CONFLICT ("companyId", "name") DO NOTHING;

-- Link each instantiated action task back to its template (mirrors
-- nonConformanceActionTask.actionTypeId). Powers the sidebar's Required Actions
-- multiselect: selected = the templates that have a task.
ALTER TABLE "changeOrderActionTask" ADD COLUMN IF NOT EXISTS "actionTypeId" TEXT;

ALTER TABLE "changeOrderActionTask" DROP CONSTRAINT IF EXISTS "changeOrderActionTask_actionTypeId_fkey";
ALTER TABLE "changeOrderActionTask"
  ADD CONSTRAINT "changeOrderActionTask_actionTypeId_fkey"
  FOREIGN KEY ("actionTypeId") REFERENCES "changeOrderRequiredAction"("id")
  ON UPDATE CASCADE ON DELETE SET NULL;

CREATE INDEX IF NOT EXISTS "changeOrderActionTask_actionTypeId_idx"
  ON "changeOrderActionTask" ("actionTypeId");

-- Backfill the link for any tasks already seeded by name (per company).
UPDATE "changeOrderActionTask" cat
SET "actionTypeId" = cra."id"
FROM "changeOrderRequiredAction" cra
WHERE cra."name" = cat."name"
  AND cra."companyId" = cat."companyId"
  AND cat."actionTypeId" IS NULL;