Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.
TypeScript ai-agentsbill-of-materialserpinventory-managementleanmanufacturingmanufacturing-execution-systemmcp-servermesmrpopen-source-erppostgresqlproduction-planningqmsquality-management-systemreact-routerself-hostedsupabasetraceabilitytypescript
-- SPDX-License-Identifier: AGPL-3.0-only
-- Carbon (github.com/crbnos/carbon). Modified or adapted versions of this file,
-- including ports, remain AGPLv3; serving them over a network requires releasing their source.
-- calculate_quantity_to_order, Demand-Based Reorder: the maximum order
-- quantity caps ONE order, never the week's need. The total is the whole
-- shortfall (at least the minimum, a whole order multiple); the TypeScript
-- twin (computePlanningOrders, @carbon/utils planning-sizing.ts) splits it
-- into orders of min(lotSize, maximumOrderQuantity). Capping the total left
-- one order of the maximum per window and the rest of the need unplanned.
-- Forked from 20260324120000_planning-quantity-to-order.sql.
-- Helper function to calculate total quantity to order based on reorder policy
CREATE OR REPLACE FUNCTION calculate_quantity_to_order(
p_reordering_policy "itemReorderingPolicy",
p_reorder_point INTEGER,
p_reorder_quantity INTEGER,
p_minimum_order_quantity INTEGER,
p_maximum_order_quantity INTEGER,
p_order_multiple INTEGER,
p_lot_size INTEGER,
p_maximum_inventory_quantity NUMERIC,
p_demand_accumulation_period INTEGER,
p_demand_accumulation_safety_stock NUMERIC,
p_projections NUMERIC[]
) RETURNS NUMERIC AS $$
DECLARE
ordered_quantity NUMERIC := 0;
num_periods INTEGER;
projected_stock NUMERIC;
projected_quantity NUMERIC;
remaining_needed NUMERIC;
total_order_qty NUMERIC;
order_qty NUMERIC;
required_qty NUMERIC;
i INTEGER;
j INTEGER;
iterations INTEGER;
window_length INTEGER;
BEGIN
num_periods := COALESCE(array_length(p_projections, 1), 0);
IF num_periods = 0 THEN RETURN 0; END IF;
CASE p_reordering_policy
WHEN 'Manual Reorder' THEN
RETURN 0;
WHEN 'Demand-Based Reorder' THEN
-- A stored period of 0 (or NULL) never advanced the loop; one week at least,
-- as computePlanningOrders.
window_length := GREATEST(1, COALESCE(p_demand_accumulation_period, 1));
i := 1;
WHILE i <= num_periods LOOP
projected_stock := 0;
j := i;
WHILE j <= LEAST(i + window_length - 1, num_periods) LOOP
projected_stock := COALESCE(p_projections[j], 0) + ordered_quantity;
j := j + 1;
END LOOP;
IF projected_stock < p_demand_accumulation_safety_stock THEN
total_order_qty := p_demand_accumulation_safety_stock - projected_stock;
total_order_qty := GREATEST(total_order_qty, p_minimum_order_quantity);
IF p_order_multiple > 0 THEN
total_order_qty := CEIL(total_order_qty / p_order_multiple) * p_order_multiple;
END IF;
ordered_quantity := ordered_quantity + total_order_qty;
END IF;
i := i + window_length;
END LOOP;
RETURN ordered_quantity;
WHEN 'Fixed Reorder Quantity' THEN
FOR i IN 1..num_periods LOOP
projected_quantity := COALESCE(p_projections[i], 0);
remaining_needed := p_reorder_point - (projected_quantity + ordered_quantity);
iterations := 0;
WHILE remaining_needed > 0 AND iterations < 5 LOOP
IF p_reorder_quantity > 0 THEN
order_qty := p_reorder_quantity;
ELSE
order_qty := p_reorder_point;
END IF;
ordered_quantity := ordered_quantity + order_qty;
remaining_needed := p_reorder_point - (projected_quantity + ordered_quantity);
iterations := iterations + 1;
END LOOP;
END LOOP;
RETURN ordered_quantity;
WHEN 'Maximum Quantity' THEN
FOR i IN 1..num_periods LOOP
projected_quantity := COALESCE(p_projections[i], 0);
remaining_needed := p_reorder_point - (projected_quantity + ordered_quantity);
iterations := 0;
WHILE remaining_needed > 0 AND iterations < 5 LOOP
required_qty := p_maximum_inventory_quantity - (projected_quantity + ordered_quantity);
IF p_reorder_quantity > 0 THEN
order_qty := GREATEST(p_minimum_order_quantity, required_qty);
ELSE
order_qty := p_reorder_point;
END IF;
IF order_qty <= 0 THEN EXIT; END IF;
IF p_order_multiple > 1 THEN
order_qty := CEIL(order_qty / p_order_multiple) * p_order_multiple;
END IF;
IF p_lot_size > 0 THEN
order_qty := CEIL(order_qty / p_lot_size) * p_lot_size;
END IF;
IF p_maximum_order_quantity > 0 THEN
order_qty := LEAST(order_qty, p_maximum_order_quantity);
END IF;
ordered_quantity := ordered_quantity + order_qty;
remaining_needed := p_reorder_point - (projected_quantity + ordered_quantity);
iterations := iterations + 1;
END LOOP;
END LOOP;
RETURN ordered_quantity;
ELSE
RETURN 0;
END CASE;
END;
$$ LANGUAGE plpgsql IMMUTABLE;