Open-source manufacturing ERP, MES and QMS. Quoting, MRP, inventory, shop floor, quality and lot/serial traceability on one Postgres schema, with a REST API and MCP server. Self-host or use Carbon Cloud.
TypeScript ai-agentsbill-of-materialserpinventory-managementleanmanufacturingmanufacturing-execution-systemmcp-servermesmrpopen-source-erppostgresqlproduction-planningqmsquality-management-systemreact-routerself-hostedsupabasetraceabilitytypescript
refactor: improve demand-based reorder policy calculations
naveenkash2beba2a8fcbd
diff --git a/apps/erp/app/modules/items/ui/Item/ItemReorderPolicy.tsx b/apps/erp/app/modules/items/ui/Item/ItemReorderPolicy.tsxindex 0832d56320..3cf6eadca1 100644--- a/apps/erp/app/modules/items/ui/Item/ItemReorderPolicy.tsx+++ b/apps/erp/app/modules/items/ui/Item/ItemReorderPolicy.tsx@@ -185,53 +185,53 @@ function calculateOrders({ itemPlanning, periods }: BaseOrderParams): {case "Demand-Based Reorder":// Process periods in chunks of demandAccumulationPeriod.//- // For each window we want two things:- // 1. Trigger date = the FIRST period in the window where the running- // projected balance dips below safety stock. The order has to- // arrive by then.- // 2. Order size = enough to lift the WORST dip (the minimum balance- // anywhere in the window) back to safety stock. Sizing against- // end-of-window alone is incorrect when demand is lumpy and the- // balance dips mid-window but recovers via scheduled supply.+ // End-of-window sizing: only fire an order when the LAST period in+ // the window dips below safety stock, and size it to lift the+ // end-of-window projection back to safety. Mirrors the SQL+ // `calculate_quantity_to_order` DBR branch exactly so this client+ // calculator and the server-side `quantityToOrder` column agree.//- // If no period in the window dips below safety stock, skip the window- // entirely (no order needed).+ // Trade-off: this hides mid-window dips that recover (e.g. PO lands+ // late in the window). Acceptable here because the server uses the+ // same convention and the planning UI relies on the two being in+ // sync.for (let i = 0; i < periods.length; i += demandAccumulationPeriod) {const windowEnd = Math.min(i + demandAccumulationPeriod,periods.length);+ // Track first dip (for the order's trigger date) AND walk+ // end-of-window projection (for sizing). The end-of-window value+ // survives because we overwrite on every iteration — same as the+ // SQL function.let firstDipIndex = -1;- let minProjection = Number.POSITIVE_INFINITY;-+ let endOfWindowProjection = 0;for (let j = i; j < windowEnd; j++) {const periodKey = `week${j + 1}` as "week1";const periodProjection = (itemPlanning[periodKey] as number) || 0;+ const effective = periodProjection + orderedQuantity;if (firstDipIndex === -1 &&- periodProjection + orderedQuantity < demandAccumulationSafetyStock+ effective < demandAccumulationSafetyStock) {firstDipIndex = j;}- if (periodProjection < minProjection) {- minProjection = periodProjection;- }+ endOfWindowProjection = effective;}- // Window is fully safe — no period dips below safety stock.- if (firstDipIndex === -1) continue;+ // Skip the window unless end-of-window is below safety.+ if (endOfWindowProjection >= demandAccumulationSafetyStock) continue;+ // Defensive: if end < safety we should have found a dip, but+ // fall back to window start so we never emit an undated order.+ if (firstDipIndex === -1) firstDipIndex = i;const currentPeriod = periods[firstDipIndex];- const effectiveMinBalance = minProjection + orderedQuantity;- // Size so the worst dip in the window is brought up to safety stock.- // Clamp to >= 0 — if effectiveMinBalance happens to already be at- // safety stock (edge case), no qty needed before MOQ kicks in.{let totalOrderQuantity = Math.max(0,- demandAccumulationSafetyStock - effectiveMinBalance+ demandAccumulationSafetyStock - endOfWindowProjection);// Apply lot sizing rules@@ -279,7 +279,7 @@ function calculateOrders({ itemPlanning, periods }: BaseOrderParams): {isASAP: startDate.compare(todaysDate) < 0,policyName: "Demand-Based Reorder",triggerValues: {- projectedStock: effectiveMinBalance,+ projectedStock: endOfWindowProjection,safetyStock: demandAccumulationSafetyStock,lotSize,leadTime@@ -304,7 +304,7 @@ function calculateOrders({ itemPlanning, periods }: BaseOrderParams): {isASAP: startDate.compare(todaysDate) < 0,policyName: "Demand-Based Reorder",triggerValues: {- projectedStock: effectiveMinBalance,+ projectedStock: endOfWindowProjection,safetyStock: demandAccumulationSafetyStock,lotSize,leadTimediff --git a/apps/erp/app/modules/sales/ui/SalesOrder/CancelSalesOrderModal.tsx b/apps/erp/app/modules/sales/ui/SalesOrder/CancelSalesOrderModal.tsxindex 53ee5de5c9..081ef04d9f 100644--- a/apps/erp/app/modules/sales/ui/SalesOrder/CancelSalesOrderModal.tsx+++ b/apps/erp/app/modules/sales/ui/SalesOrder/CancelSalesOrderModal.tsx@@ -99,11 +99,14 @@ export function CancelSalesOrderModal({<ModalTitle><Trans>Cancel Sales Order</Trans></ModalTitle>- <ModalDescription>- <Trans>- This sales order has associated jobs. Choose what to do with them.- </Trans>- </ModalDescription>+ {!isLoading && jobs.length > 0 && (+ <ModalDescription>+ <Trans>+ This sales order has associated jobs. Choose what to do with+ them.+ </Trans>+ </ModalDescription>+ )}</ModalHeader><ModalBody>{isLoading ? (