Skip to content

28 eval-informed mental models and critical-thinking skills for Claude Code, GitHub Copilot, Codex, Cursor, and other Agent Skills-compatible tools

80.1 KB
Raw Blame
{"id":"margin-safety-01","mode":"binary-decision","prompt":"A team expects peak API traffic of 800 req/s during an upcoming product launch. Historical launches show spikes of 3–5x the predicted peak, and a failure would mean lost revenue plus SLA breach penalties. The team provisions 2,000 req/s of capacity — 2.5x the expected peak.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:infrastructure,label:yes"}
{"id":"margin-safety-02","mode":"binary-decision","prompt":"A data warehouse team expects to ingest 500GB of data per month. Storage is charged at $0.023/GB and data loss is not a concern because source data can be re-ingested at any time. They provision 550GB — a 10% buffer. Scaling additional storage takes less than 30 seconds via an API call.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"data-infrastructure","cluster_id":"margin-of-safety-provision-data-infrastructure-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:data-infrastructure,label:yes"}
{"id":"margin-safety-03","mode":"binary-decision","prompt":"A payments company processes an average of 1,200 transactions per second on normal days. Black Friday historically generates 4–6x normal volume, and a payment processing outage means direct revenue loss of roughly $50,000 per minute. The team provisions capacity for 1,800 transactions per second for the holiday period.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-no","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:infrastructure,label:no"}
{"id":"margin-safety-04","mode":"binary-decision","prompt":"A team is setting an HTTP client timeout for calls to a third-party shipping API. The shipping API's documented p99 latency is 400ms, and their SLA guarantees responses within 800ms. Calls that time out result in a failed order checkout with user-visible errors. The team sets a 1,000ms timeout.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"reliability","cluster_id":"margin-of-safety-provision-reliability-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:reliability,label:yes"}
{"id":"margin-safety-05","mode":"binary-decision","prompt":"A startup's engineering team estimates a new feature will take 4 weeks to build. This is the team's first time working with the third-party payments SDK, and the feature is on the critical path for a contractually committed customer demo. They commit to a 5-week delivery date — 25% buffer.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"project-management","cluster_id":"margin-of-safety-provision-project-management-no","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:project-management,label:no"}
{"id":"margin-safety-06","mode":"binary-decision","prompt":"A Postgres connection pool is configured with a maximum of 100 connections. Under normal load the service uses 45 connections. During monthly billing runs a secondary process uses up to 30 additional connections simultaneously. An unexpected secondary batch job will exhaust the pool only if both peaks coincide, which has never happened. The cost of pool exhaustion is a cascade of 500 errors to all users.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"data-infrastructure","cluster_id":"margin-of-safety-provision-data-infrastructure-no","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:data-infrastructure,label:no"}
{"id":"margin-safety-07","mode":"binary-decision","prompt":"A video transcoding service processes an average of 200 jobs per hour. Job volume has been growing 15% month-over-month for six months with no sign of slowing. Each job consumes roughly the same compute. The team provisions for 600 jobs per hour — 3x current average — and plans to review in three months. Delays cause content to miss publishing windows, resulting in lost ad revenue.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:infrastructure,label:yes"}
{"id":"margin-safety-08","mode":"binary-decision","prompt":"A team is planning storage for a new audit log system. Legal requires all audit logs to be retained for 7 years, and any gap is a compliance violation. The team's data model estimates 80GB per year based on current transaction volume. They provision 100GB of storage — enough for about 15 months — with a plan to add capacity before it fills.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"compliance","cluster_id":"margin-of-safety-provision-compliance-no","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:compliance,label:no"}
{"id":"margin-safety-09","mode":"binary-decision","prompt":"A ride-sharing company allocates a monthly infrastructure budget of $120,000. Actual spend has been stable at $95,000–$100,000 per month for the past six months with no new services planned. The allocated budget of $120,000 represents a 20–26% buffer over observed spend.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"finance","cluster_id":"margin-of-safety-provision-finance-yes","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:finance,label:yes"}
{"id":"margin-safety-10","mode":"binary-decision","prompt":"A hospital patient-record API is expected to serve 500 concurrent users during the busy morning shift. Load tests show the system becomes degraded at 520 concurrent users. Patient care workflows depend on the system; downtime means nurses fall back to paper, which introduces medication error risk. The team deploys hardware supporting 550 concurrent users.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"healthcare","cluster_id":"margin-of-safety-provision-healthcare-no","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:healthcare,label:no"}
{"id":"margin-safety-11","mode":"binary-decision","prompt":"A Kafka consumer group processes 50,000 messages per hour at steady state. The upstream producer can burst to 200,000 messages per hour during end-of-day batch closes, lasting about 45 minutes. Consumer lag during burst causes downstream reports to be delayed, impacting trading desks. The team sizes consumers for 250,000 messages per hour sustained throughput.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"data-infrastructure","cluster_id":"margin-of-safety-provision-data-infrastructure-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:data-infrastructure,label:yes"}
{"id":"margin-safety-12","mode":"binary-decision","prompt":"A team is deploying a new machine learning inference service. Benchmark tests show the model needs 6GB of GPU VRAM at maximum batch size. The team selects a GPU instance with exactly 8GB VRAM. They note that framework overhead, CUDA context, and driver memory are not accounted for in the benchmark figure.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"ml","cluster_id":"margin-of-safety-provision-ml-no","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:ml,label:no"}
{"id":"margin-safety-13","mode":"binary-decision","prompt":"A software team is migrating a monolith to microservices. The project manager estimates 6 months based on a rough breakdown of work. The migration touches every team in the company, requires coordination with three external vendors, and has no prior comparable project as reference. The team commits to a 12-month timeline with a formal review at month 6.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"project-management","cluster_id":"margin-of-safety-provision-project-management-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:project-management,label:yes"}
{"id":"margin-safety-14","mode":"binary-decision","prompt":"An IoT platform expects 10,000 devices to connect simultaneously after a firmware update pushes to all deployed units. Historical firmware pushes show actual simultaneous reconnection peaks reach 8x the device count (due to reconnect storms). A reconnection storm exceeding broker capacity causes devices to go permanently offline until manually reset. The broker is provisioned for 15,000 simultaneous connections.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-no","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:infrastructure,label:no"}
{"id":"margin-safety-15","mode":"binary-decision","prompt":"A SaaS company's search index uses 40% of available disk space under current data volume. Data volume is projected to grow 20% per year, and the index requires immediate disk space to function — when disk hits 90% full the service stops indexing new documents. The team plans to add storage when usage hits 70% utilization, giving roughly 1.5 years of runway.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:infrastructure,label:yes"}
{"id":"margin-safety-16","mode":"binary-decision","prompt":"A team's API rate limit with their geolocation provider is 10,000 lookups per day. Current usage averages 6,500 lookups per day. A marketing campaign launching next month is expected to bring a 2–3x traffic increase lasting two weeks. Exceeding the rate limit returns errors on the address validation step of checkout, blocking all new orders.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"integration","cluster_id":"margin-of-safety-provision-integration-no","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:integration,label:no"}
{"id":"margin-safety-17","mode":"binary-decision","prompt":"A team running a high-traffic CDN edge node configures a memory cache with a maximum size of 32GB. Profiling shows the working set of hot content peaks at 20GB during prime time, with cold-start periods using as little as 5GB. Cache evictions are graceful — a miss falls through to origin with a latency penalty but no data loss. They size at 32GB for comfortable headroom.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:infrastructure,label:yes"}
{"id":"margin-safety-18","mode":"binary-decision","prompt":"A developer estimates a new authentication refactor will take 10 days. The team has done this type of refactor three times in the past year, always within 8–12 days. The change is internal only, has no customer-facing deadline, and can be rolled back instantly if problems arise. They commit to 11 days.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"project-management","cluster_id":"margin-of-safety-provision-project-management-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:project-management,label:yes"}
{"id":"margin-safety-19","mode":"binary-decision","prompt":"A team deploys a Redis cache cluster sized for 8GB of memory. Current cache usage is 7.2GB. Keys are set with TTLs of 24 hours but the product roadmap includes launching three new features over the next two months, each of which is expected to add cached objects. Cache eviction uses LRU, and evicting hot keys causes a cascade of DB queries that has previously caused an incident.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-no","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:infrastructure,label:no"}
{"id":"margin-safety-20","mode":"binary-decision","prompt":"A blockchain indexer must process blocks in real time; falling more than 100 blocks behind causes downstream dApps to display stale data, which breaks user transactions. Block arrival rate averages 12 per minute but spikes to 40 per minute during network congestion events that occur roughly twice a month. The team provisions for 60 blocks per minute sustained throughput.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:infrastructure,label:yes"}
{"id":"margin-safety-21","mode":"binary-decision","prompt":"A team's incident response SLA commits to acknowledging critical incidents within 15 minutes and resolving them within 4 hours. They have one primary on-call engineer and no backup. The primary has missed acknowledgment in 3 of the last 20 incidents due to being in a meeting or asleep in a different time zone.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"reliability","cluster_id":"margin-of-safety-provision-reliability-no","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:reliability,label:no"}
{"id":"margin-safety-22","mode":"binary-decision","prompt":"An analytics pipeline writes results to an S3 bucket. Each run produces approximately 2GB. The pipeline runs daily, and 90 days of results are retained before lifecycle rules delete old files. The team allocates 250GB of S3 capacity via a quota. S3 storage is elastic and quota overages are immediately rechargeable at standard rates.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"data-infrastructure","cluster_id":"margin-of-safety-provision-data-infrastructure-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:data-infrastructure,label:yes"}
{"id":"margin-safety-23","mode":"binary-decision","prompt":"A team is launching a developer API with a free tier capped at 1,000 calls per month per user. Backend cost per call is $0.001. They provision infrastructure for 5 million total free-tier calls per month. They have 3,000 free-tier users signed up and expect 10,000 by end of quarter. At full expected adoption and full usage, demand would be 10 million calls per month.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-no","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:infrastructure,label:no"}
{"id":"margin-safety-24","mode":"binary-decision","prompt":"A team configures a circuit breaker to open after 5% error rate sustained over 10 seconds. Under normal conditions the service runs at 0.1% error rate. The error rate threshold, window size, and recovery behavior were validated in production-like load tests. The circuit breaker configuration matches what was tested.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"reliability","cluster_id":"margin-of-safety-provision-reliability-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:reliability,label:yes"}
{"id":"margin-safety-25","mode":"binary-decision","prompt":"An e-commerce site expects 1,000 concurrent sessions during a flash sale. Load testing shows the application server handles 1,050 concurrent sessions before response times degrade past 3 seconds. A degraded checkout experience during the flash sale means customers abandon carts. The team does not add additional capacity, relying on auto-scaling that takes 4–6 minutes to provision new instances.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-no","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:infrastructure,label:no"}
{"id":"margin-safety-26","mode":"binary-decision","prompt":"A team building a new internal reporting tool estimates the backend will need 4 vCPUs and 8GB RAM under expected query load. The tool is used only during business hours by 15 analysts. They provision an 8 vCPU, 16GB RAM instance, doubling both. If the tool becomes slow, analysts can wait without business impact.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:infrastructure,label:yes"}
{"id":"margin-safety-27","mode":"binary-decision","prompt":"A satellite telemetry ingestion pipeline must store all raw data permanently for regulatory reasons; any data gap is a compliance event with significant fines. The system ingests 10TB per year with no growth expected. The team provisions 12TB — 20% buffer — on a single storage array with no redundancy and no offsite backup.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"compliance","cluster_id":"margin-of-safety-provision-compliance-no","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:compliance,label:no"}
{"id":"margin-safety-28","mode":"binary-decision","prompt":"A team uses a managed Elasticsearch cluster for product search. Normal indexing throughput is 2,000 documents per second. The team expects a re-index event during a schema migration that will run at 4,000 documents per second for approximately 6 hours. They temporarily scale the cluster to handle 6,000 documents per second for the migration window. A search outage means the product catalog is unavailable to customers.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"data-infrastructure","cluster_id":"margin-of-safety-provision-data-infrastructure-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:data-infrastructure,label:yes"}
{"id":"margin-safety-29","mode":"binary-decision","prompt":"A team provisions a job queue worker fleet sized to drain 100 jobs per minute — exactly matching the average production ingest rate. The queue is used for sending transactional emails; if the queue backs up significantly, emails arrive hours late. Historical data shows ingest spikes to 300 jobs per minute during large user-triggered events such as password reset floods.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-no","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:infrastructure,label:no"}
{"id":"margin-safety-30","mode":"binary-decision","prompt":"A team committing to a quarterly OKR estimates a feature will be delivered in 6 weeks, based on a well-understood problem space, a team that has built nearly identical features before, and no external dependencies. They commit to 8 weeks in the OKR. Missing the OKR has minor internal visibility consequences and the feature can ship one quarter late without customer impact.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"project-management","cluster_id":"margin-of-safety-provision-project-management-yes","source_family":"margin-of-safety-provision","split":"dev","cluster_basis":"domain:project-management,label:yes"}
{"id":"margin-safety-31","mode":"binary-decision","prompt":"A ticketing site expects 5,000 req/s when a major tour goes on sale. Past on-sales spiked to 4x the forecast and a stall means lost sales plus reputational damage. The team provisions autoscaling with a warm floor of 22,000 req/s — over 4x the forecast.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-ticketing-onsale-4x-floor","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:infrastructure,label:yes"}
{"id":"margin-safety-32","mode":"binary-decision","prompt":"Setting a timeout for a downstream inventory service whose documented p99 is 300ms and SLA ceiling is 600ms, where a timeout fails checkout, the team sets the client timeout to 1,500ms — 2.5x the SLA ceiling.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"reliability","cluster_id":"margin-of-safety-provision-reliability-inventory-timeout-2_5x-sla","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:reliability,label:yes"}
{"id":"margin-safety-33","mode":"binary-decision","prompt":"A log pipeline ingests ~1TB/day and legal requires 3-year retention with zero gaps; any loss is a compliance breach. The team provisions 5PB of redundant, replicated storage with offsite backup — well over 3x the projected volume.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"data-infrastructure","cluster_id":"margin-of-safety-provision-data-infrastructure-log-retention-5pb-redundant","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:data-infrastructure,label:yes"}
{"id":"margin-safety-34","mode":"binary-decision","prompt":"A team estimates a first-ever compliance-certification project at 3 months. It touches every service, involves two external auditors, and has no internal precedent. They commit to a 7-month timeline with a formal review at month 3.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"project-management","cluster_id":"margin-of-safety-provision-project-management-compliance-cert-7mo-buffer","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:project-management,label:yes"}
{"id":"margin-safety-35","mode":"binary-decision","prompt":"A startup's monthly cloud spend has held at $40k–$45k for a year with no new launches planned. Finance allocates a $58k monthly budget — roughly a 30% buffer over observed peak.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"finance","cluster_id":"margin-of-safety-provision-finance-cloud-budget-30pct-buffer","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:finance,label:yes"}
{"id":"margin-safety-36","mode":"binary-decision","prompt":"A message broker must absorb reconnect storms after firmware pushes; history shows storms reach 6x the 20,000-device fleet, and a storm bricks devices until manual reset. The team provisions the broker for 150,000 simultaneous connections — over 7x the fleet.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"capacity","cluster_id":"margin-of-safety-provision-capacity-broker-reconnect-7x-fleet","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:capacity,label:yes"}
{"id":"margin-safety-37","mode":"binary-decision","prompt":"A search cluster sits at 45% disk under current volume, growth is ~15%/year, and indexing halts at 90% full. The team adds storage when usage hits 65%, keeping roughly 1.5 years of runway ahead of the hard stop.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-search-disk-65pct-runway","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:infrastructure,label:yes"}
{"id":"margin-safety-38","mode":"binary-decision","prompt":"A circuit breaker for a flaky third-party API opens at a 4% error rate over 15s; normal error rate is 0.2%. The thresholds were validated under production-like fault injection, leaving clear headroom above the noise floor.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"reliability","cluster_id":"margin-of-safety-provision-reliability-circuit-breaker-4pct-validated","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:reliability,label:yes"}
{"id":"margin-safety-39","mode":"binary-decision","prompt":"A Kafka consumer group processes 40k msg/s at steady state; end-of-day batches burst to 160k msg/s for ~30 minutes, and lag delays regulatory reports. The team sizes consumers for 220k msg/s sustained — well above the burst.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"data-infrastructure","cluster_id":"margin-of-safety-provision-data-infrastructure-kafka-220k-above-burst","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:data-infrastructure,label:yes"}
{"id":"margin-safety-40","mode":"binary-decision","prompt":"An e-commerce API handles 2,000 req/s normally; a flash sale historically drives 5–7x that, and an outage costs ~$40k/minute. The team provisions for just 3,000 req/s and relies on autoscaling that takes 5 minutes to add nodes.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-flashsale-3k-slow-autoscale","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:infrastructure,label:no"}
{"id":"margin-safety-41","mode":"binary-decision","prompt":"A model needs 14GB of GPU memory at max batch in benchmarks that exclude CUDA context, framework overhead, and driver reserve. The team picks a 16GB GPU with no headroom for the unaccounted overhead.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"ml","cluster_id":"margin-of-safety-provision-ml-gpu-16gb-no-overhead-headroom","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:ml,label:no"}
{"id":"margin-safety-42","mode":"binary-decision","prompt":"A Postgres pool is capped at 120 connections; steady state uses 60 and a nightly reconciliation adds up to 55 more. If both peaks coincide the pool exhausts and every request 500s, yet the team leaves the cap at 120.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"data-infrastructure","cluster_id":"margin-of-safety-provision-data-infrastructure-pg-pool-120-coincide-exhaust","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:data-infrastructure,label:no"}
{"id":"margin-safety-43","mode":"binary-decision","prompt":"Audit logs must be retained 10 years with any gap a reportable violation. Current volume is 200GB/year with modest growth expected. The team provisions a single 2.2TB array — about 11 years at today's rate — with no redundancy and no offsite copy.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"compliance","cluster_id":"margin-of-safety-provision-compliance-audit-2_2tb-no-redundancy","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:compliance,label:no"}
{"id":"margin-safety-44","mode":"binary-decision","prompt":"An on-call SLA promises 10-minute acknowledgement of SEV1s around the clock, staffed by one engineer with no secondary. That engineer already missed ack on 4 of the last 25 pages due to sleep and meetings, but no backup is added.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"reliability","cluster_id":"margin-of-safety-provision-reliability-oncall-single-no-backup","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:reliability,label:no"}
{"id":"margin-safety-45","mode":"binary-decision","prompt":"A video-encoding farm processes 300 jobs/hour today and volume has grown 20% month-over-month for eight months; missed jobs blow publishing windows and cost ad revenue. The team provisions for exactly 320 jobs/hour.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"capacity","cluster_id":"margin-of-safety-provision-capacity-encoding-320-no-growth-margin","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:capacity,label:no"}
{"id":"margin-safety-46","mode":"binary-decision","prompt":"A Redis cache is sized at 12GB and current usage is 11.4GB. Three roadmap features next quarter will each add cached objects, and evicting hot keys previously caused a DB-overload incident, yet the team keeps the cluster at 12GB.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"margin-of-safety-provision-infrastructure-redis-12gb-roadmap-eviction","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:infrastructure,label:no"}
{"id":"margin-safety-47","mode":"binary-decision","prompt":"A free API tier is capped at 2,000 calls/month/user and the team provisions backend capacity for 8M total monthly calls. They have 5,000 users now, expect 20,000 by quarter-end, and full adoption at the cap implies 40M calls/month.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"finance","cluster_id":"margin-of-safety-provision-finance-freetier-8m-vs-40m-demand","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:finance,label:no"}
{"id":"margin-safety-48","mode":"binary-decision","prompt":"A patient-monitoring API must serve 800 concurrent clinicians at morning rounds; load tests degrade it at 820 concurrent, and downtime forces error-prone paper fallback. The team deploys hardware rated for exactly 850 concurrent with no autoscaling.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"healthcare","cluster_id":"margin-of-safety-provision-healthcare-patient-850-tight-no-autoscale","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:healthcare,label:no"}
{"id":"margin-safety-49-jul2","mode":"binary-decision","prompt":"A cross-region database replication link carries 2 Gbps at steady state and bursts to 5 Gbps during the nightly bulk sync. If the link saturates, replication lag grows and the disaster-recovery RPO is breached. The team leases a dedicated 20 Gbps link — four times the observed burst.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"networking","cluster_id":"mos-jul2-repl-link-20gbps","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:networking,label:yes"}
{"id":"margin-safety-50-jul2","mode":"binary-decision","prompt":"A synchronous request handler uses a fixed pool of 50 worker threads; each request holds a thread while a downstream call runs, averaging 200ms but occasionally stalling at 5s during downstream GC pauses. Peak arrival is 200 requests per second, and a saturated pool causes user-visible timeouts. The team keeps the pool at 50 threads.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"reliability","cluster_id":"mos-jul2-thread-pool-50","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:reliability,label:no"}
{"id":"margin-safety-51-jul2","mode":"binary-decision","prompt":"An analyst-facing export writes about 40 GB per run into a bucket governed by a 30-day lifecycle rule. The team sets a 60 GB soft quota. The bucket is fully elastic, overages simply bill at the standard rate with no hard ceiling, and a temporary overshoot has no functional effect on the export.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"data-infrastructure","cluster_id":"mos-jul2-export-soft-quota-elastic","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:data-infrastructure,label:yes"}
{"id":"margin-safety-52-jul2","mode":"binary-decision","prompt":"A shared Postgres read replica serves two workloads: an interactive dashboard peaking at 400 queries/s and a scheduled export peaking at 350 queries/s. Each has run comfortably in isolation. The replica is benchmarked to sustain 800 queries/s before latency collapses. The team notes the two peaks have never coincided and leaves capacity at 800 queries/s.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"data-infrastructure","cluster_id":"mos-jul2-replica-800-correlated-peaks","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:data-infrastructure,label:no"}
{"id":"margin-safety-53-jul2","mode":"binary-decision","prompt":"A startup holds $6M in cash and burns $250K per month, giving 24 months of runway. Its plan targets a raise between months 12 and 15, comparable raises at its stage have closed within three months of kickoff, and its board advises never dropping below 12 months of runway.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"finance","cluster_id":"mos-jul2-runway-24mo","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:finance,label:yes"}
{"id":"margin-safety-54-jul2","mode":"binary-decision","prompt":"A startup holds $1.5M and burns $300K per month — five months of runway. Its next raise typically takes four to six months from kickoff to close, the team has not started raising, and a missed payroll would force layoffs and inflict serious reputational damage.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"finance","cluster_id":"mos-jul2-runway-5mo","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:finance,label:no"}
{"id":"margin-safety-55-jul2","mode":"binary-decision","prompt":"A colocation rack draws 4 kW. The team sizes a UPS for 15 minutes of runtime at full load. Utility outages at the facility have historically lasted under 90 seconds, the standby generator auto-starts and stabilizes within 40 seconds, and if the generator ever fails to start, a graceful shutdown of the rack completes in under three minutes.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"mos-jul2-ups-15min","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:infrastructure,label:yes"}
{"id":"margin-safety-56-jul2","mode":"binary-decision","prompt":"Production TLS certificates are valid for 90 days. The team renews them manually and schedules the renewal task seven days before expiry. There is no monitoring for renewal failures, the renewal requires one specific engineer's access, and an expired certificate takes the public API fully offline.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"reliability","cluster_id":"mos-jul2-tls-renew-7day-manual","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:reliability,label:no"}
{"id":"margin-safety-57-jul2","mode":"binary-decision","prompt":"A user request carries a 3,000 ms end-to-end deadline. It fans out to three sequential services whose p99 latencies are 150 ms, 200 ms, and 250 ms. The gateway sets a per-hop timeout budget totaling 1,500 ms and reserves the remaining 1,500 ms as slack for network hops and one round of retries.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"reliability","cluster_id":"mos-jul2-deadline-budget-3s","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:reliability,label:yes"}
{"id":"margin-safety-58-jul2","mode":"binary-decision","prompt":"A high-connection proxy holds one file descriptor per open socket and peaks at 60,000 concurrent connections. Connection storms after upstream restarts have briefly driven peaks to three times normal. The OS file-descriptor limit is left at the default 65,536, and hitting the limit causes the proxy to reject all new connections.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"mos-jul2-ulimit-fd-65k","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:infrastructure,label:no"}
{"id":"margin-safety-59-jul2","mode":"binary-decision","prompt":"A background sync retries failed items up to three times with exponential backoff. Transient upstream errors hit about 0.5% of items and almost always clear on the first retry; items still failing after three attempts are parked in a dead-letter queue for manual review with no data loss and no deadline.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"integration","cluster_id":"mos-jul2-retry-budget-3-dlq","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:integration,label:yes"}
{"id":"margin-safety-60-jul2","mode":"binary-decision","prompt":"A service autoscales between 4 and 20 replicas on CPU. Each replica handles about 500 req/s; normal peak is 6,000 req/s (roughly 12 replicas). A recurring marketing email blast has previously driven sudden 4x spikes within 30 seconds. Scaling from 12 replicas to the 20-replica ceiling takes about three minutes, and that ceiling caps throughput at 10,000 req/s.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"mos-jul2-autoscale-max-20-4x-spike","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:infrastructure,label:no"}
{"id":"margin-safety-61-jul2","mode":"binary-decision","prompt":"A supplier's warehouse consumes 500 units per week of a critical assembly component, with a supplier lead time of two weeks that occasionally stretches to three. The team sets the reorder point to cover three weeks of average demand (1,500 units) plus a 900-unit safety buffer for demand spikes. A stockout halts the assembly line.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"supply-chain","cluster_id":"mos-jul2-safety-stock-900","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:supply-chain,label:yes"}
{"id":"margin-safety-62-jul2","mode":"binary-decision","prompt":"A distributor sells 1,000 units per week of a SKU with a four-week supplier lead time that has stretched to six weeks twice this year. A stockout sends buyers to a competitor and the sale is lost. The team sets the reorder point at exactly four weeks of average demand (4,000 units) with no safety stock.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"supply-chain","cluster_id":"mos-jul2-reorder-no-safety","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:supply-chain,label:no"}
{"id":"margin-safety-63-jul2","mode":"binary-decision","prompt":"A team's outbound email provider allows 50,000 sends per day. Current daily volume has been flat at 42,000 for two years with no campaigns planned. If the cap is hit, the remaining sends queue and deliver the next day with no loss — the messages are non-urgent daily digests.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"integration","cluster_id":"mos-jul2-email-cap-50k-flat","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:integration,label:yes"}
{"id":"margin-safety-64-jul2","mode":"binary-decision","prompt":"A JVM service is allocated a 4 GB heap. Steady-state live-set usage is 2.6 GB. Under load, allocation churn drives transient peaks to 3.6 GB, and full GC pauses long enough to trip health checks begin above 3.8 GB. A caching feature shipping next month is estimated to add 400 MB to the live set. The team keeps the heap at 4 GB.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"mos-jul2-jvm-heap-4gb","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:infrastructure,label:no"}
{"id":"margin-safety-65-jul2","mode":"binary-decision","prompt":"A backup diesel generator for a hospital data center burns 40 L per hour at full load. Regulations require 24 hours of onsite fuel; the longest regional outage on record was 18 hours. The facility stores 1,600 L — 40 hours of runtime — and holds a fuel-delivery contract with a six-hour response SLA.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"mos-jul2-generator-fuel-40h","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:infrastructure,label:yes"}
{"id":"margin-safety-66-jul2","mode":"binary-decision","prompt":"A team relies on DNS failover to redirect traffic to a standby region during an outage. Their availability target allows at most five minutes of downtime per incident. The authoritative DNS records are published with a 3,600-second (one-hour) TTL that many resolvers honor, and failover depends on clients picking up the new record.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"reliability","cluster_id":"mos-jul2-dns-ttl-3600","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:reliability,label:no"}
{"id":"margin-safety-67-jul2","mode":"binary-decision","prompt":"A partner API permits five concurrent requests per client. The team's integration issues at most three concurrent calls by design, feeding work through a bounded pool of size three; if the pool is briefly full, jobs wait a few hundred milliseconds. The workload has no latency SLA and call volume has been flat for a year.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"integration","cluster_id":"mos-jul2-partner-concurrency-5","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:integration,label:yes"}
{"id":"margin-safety-68-jul2","mode":"binary-decision","prompt":"A five-day model-training run uses cheap spot GPU instances that are reclaimed on average once every eight hours with no warning. The framework checkpoints every six hours. A reclaim discards all progress since the last checkpoint, and the run must finish before a fixed conference deadline six days out.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"ml","cluster_id":"mos-jul2-training-checkpoint-6h","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:ml,label:no"}
{"id":"margin-safety-69-jul2","mode":"binary-decision","prompt":"A stateless API tier needs six backend instances to serve peak traffic within latency targets. Instances fail roughly once a month, and each deploy briefly pulls one instance out of rotation. The team runs nine instances behind the load balancer (N+3), and adding more instances is cheap.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"mos-jul2-lb-backend-n-plus-3","source_family":"margin-of-safety-provision","split":"heldout","cluster_basis":"domain:infrastructure,label:yes"}
{"id":"margin-safety-70-jul2","mode":"binary-decision","prompt":"A public endpoint enforces a token-bucket rate limit. Legitimate clients burst up to 30 requests within a one-second window during page loads, while their sustained legitimate rate is about 5 req/s. The team sets the bucket to 100 tokens refilling at 10 per second, and exceeding the limit only delays non-critical prefetch requests.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"reliability","cluster_id":"mos-jul2-repl-token-bucket-100","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:reliability,label:yes"}
{"id":"margin-safety-71-jul2","mode":"binary-decision","prompt":"A nightly full backup takes 5.5 hours and must complete inside a six-hour maintenance window during which the database is read-only. Backup duration has grown about 8% per quarter as data accumulates, and overrunning the window keeps the database read-only into business hours, blocking customer writes.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"data-infrastructure","cluster_id":"mos-jul2-repl-backup-window-6h","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:data-infrastructure,label:no"}
{"id":"margin-safety-72-jul2","mode":"binary-decision","prompt":"A database allows 200 connections. The application runs a fixed fleet of eight pods, each with a hard-capped pool of 20 connections (160 maximum in total), and the connection count cannot exceed that by design. There are no other clients, and the pod count is fixed by a resource quota.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"data-infrastructure","cluster_id":"mos-jul2-repl-db-conn-200-capped-clients","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:data-infrastructure,label:yes"}
{"id":"margin-safety-73-jul2","mode":"binary-decision","prompt":"A streaming service commits to a CDN bandwidth tier of 40 Gbps, reasoning it nearly doubles the 22 Gbps average egress. But the live-event peaks that are the whole point of the product occur weekly and drive egress to 55–65 Gbps, and exceeding the committed tier causes viewer buffering and quality downgrades.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"networking","cluster_id":"mos-jul2-repl-cdn-tier-40gbps","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:networking,label:no"}
{"id":"margin-safety-74-jul2","mode":"binary-decision","prompt":"A provisioned-IOPS volume is set to 12,000 IOPS. The workload's measured peak is 4,500 IOPS, quarterly reporting jobs push transient peaks to 7,000 IOPS, and if the volume ever throttled it would merely slow — not fail — those non-critical jobs. The team keeps the volume at 12,000 IOPS.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"mos-jul2-repl-iops-12k","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:infrastructure,label:yes"}
{"id":"margin-safety-75-jul2","mode":"binary-decision","prompt":"A service's request-signing secret is rotated every 24 hours. Propagating a new secret to all edge nodes takes up to four hours and occasionally fails on a subset of nodes. Old and new secrets are both accepted only during a 30-minute overlap window, after which requests signed with the old secret are rejected — cutting off any node that has not updated.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"security","cluster_id":"mos-jul2-repl-secret-overlap-30min","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:security,label:no"}
{"id":"margin-safety-76-jul2","mode":"binary-decision","prompt":"A worker calls an internal endpoint whose p99 latency is 800 ms and whose hard maximum observed latency is 1,100 ms. The team sets a 1,000 ms timeout. On timeout the call is safely retried up to five times with jitter, the operation is fully idempotent, and the work is a background reconciliation with no user waiting on it.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"reliability","cluster_id":"mos-jul2-repl-timeout-1s-idempotent-retry","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:reliability,label:yes"}
{"id":"margin-safety-77-jul2","mode":"binary-decision","prompt":"A pod is given a 512 MiB memory limit. Typical usage is 300 MiB, so the limit looks like a comfortable 1.7x. During large request payloads, usage spikes to 480–520 MiB, and exceeding the limit triggers an immediate OOMKill that drops in-flight requests. Payload sizes are trending upward.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"infrastructure","cluster_id":"mos-jul2-repl-k8s-mem-limit-512","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:infrastructure,label:no"}
{"id":"margin-safety-78-jul2","mode":"binary-decision","prompt":"A service commits to 99.9% monthly availability — about 43 minutes of allowed downtime. Over the past 12 months actual downtime has been 5–12 minutes per month, mostly brief planned maintenance. The team budgets the full 43 minutes and treats crossing 20 minutes in a month as a trigger to freeze risky deploys.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"reliability","cluster_id":"mos-jul2-repl-error-budget-999","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:reliability,label:yes"}
{"id":"margin-safety-79-jul2","mode":"binary-decision","prompt":"A distribution center has six loading docks. Trucks arrive on a schedule needing five docks in use on average, but carrier delays routinely bunch arrivals so nine or ten trucks need unloading within the same hour. Trucks that cannot dock incur per-hour detention fees and delay downstream deliveries. The center keeps six docks.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"supply-chain","cluster_id":"mos-jul2-repl-dock-capacity-6","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:supply-chain,label:no"}
{"id":"margin-safety-80-jul2","mode":"binary-decision","prompt":"A team schedules a routine dependency-upgrade task, estimated at two hours, into a 2.5-hour maintenance window. They have run this exact upgrade monthly for a year, it has never exceeded two hours, it is fully scripted, and it can be rolled back in under 10 minutes if anything goes wrong.","label":true,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"project-management","cluster_id":"mos-jul2-repl-maint-window-2_5h","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:project-management,label:yes"}
{"id":"margin-safety-81-jul2","mode":"binary-decision","prompt":"A support team handles 1,200 tickets per week and each agent clears about 150 per week, so eight agents suffice; the team staffs ten, a 25% buffer. But attrition removes roughly one agent every two months, new hires take six weeks to reach full productivity, ticket volume grows 5% per quarter, and hiring is currently frozen.","label":false,"decision_instruction":"You are sizing/provisioning a resource under uncertainty, given an expected load and the cost of under-provisioning vs over-provisioning. Answer YES if the proposed plan leaves an ADEQUATE safety margin for the stated uncertainty and failure cost. Answer NO if the plan is provisioned too tightly (no meaningful buffer) given the uncertainty and the high cost of running out.","skill_fit":["margin-of-safety"],"domain":"capacity","cluster_id":"mos-jul2-repl-support-staffing-10","source_family":"margin-of-safety-provision","split":"replication","cluster_basis":"domain:capacity,label:no"}