Free, open source blog writer for Claude Code. Researches current sources, writes answer-first posts for Google and AI answers, has an independent reviewer score each one out of 100 and ships only after five delivery gates. 32 skills, 30 /blog commands, 5 agents. Active development at AI-Marketing-Hub/claude-blog; public releases ship here.
type: deliverable title: "Editorial Calendar Planning Matrix" domain: "Editorial Planning" status: active created: 2026-07-09 updated: 2026-07-09 tags: [deliverables, editorial-calendar, planning-matrix, active]
Editorial Calendar Planning Matrix
Calendar Planning Scope
This matrix schedules topics across a month or quarter by cluster role, freshness risk, distribution need, and measurement cadence. It is a planning artifact, not a promise that publishing volume creates rankings. Helpful-content quality from g-helpful-content is the gate for every scheduled piece, and performance checks should use [[Google Data Integrations]] when property data exists.
Cadence Inputs And Constraints
Inputs include topic cluster, business priority, seasonality, last-modified date, source freshness, available authors, review capacity, and planned distribution surface. g-ranking-history can explain confirmed Google update timing, but the calendar must not assume a broad update caused a page's performance change without evidence.
Decisions Deferred To Other Notes
Merge decisions go to [[Cannibalization Resolution Matrix]] once that artifact exists. Detailed rewrite scope goes to [[Freshness and Content Decay]]. Market context from sparktoro-zero-click-2026 can shape distribution expectations, but it cannot replace site-level data from g-gsc-api.
Editorial Calendar Planning Matrix Execution Table
| Planning phase | Input needed | Calendar output | Owner | Evidence requirement | Follow-up action |
|---|---|---|---|---|---|
| Cluster sequencing | Hub and spoke map | Publish order by cluster role | Strategist | Helpful-content fit and topic coverage | Confirm internal links |
| Freshness review | Last updated date and source age | Refresh slot or monitor slot | Editor | Dated sources and rewrite need | Assign source refresh |
| Search data check | Query, page, and date range | Priority score with caveat | SEO analyst | g-gsc-api export or missing-data note |
Recheck after next reporting period |
| Update awareness | Confirmed ranking-history event | Volatility annotation | SEO analyst | g-ranking-history only |
Avoid unsupported causation |
| Distribution planning | Channel and asset need | Promotion date and asset owner | Distribution lead | Market context caveated through [[Dual Optimization]] | Schedule repurposing brief |
Operating Loop For Calendar Review
- Rebuild the calendar from evidence, not from a fixed publishing quota.
- Mark each item as new, refresh, consolidate, or monitor before assigning a writer.
- Revisit the matrix monthly or when a confirmed Google update changes the review context.
- Keep source-refresh work ahead of draft deadlines so weak evidence does not travel downstream.
Source IDs Used
Calendar planning uses g-helpful-content, g-ranking-history, sparktoro-zero-click-2026, and g-gsc-api.