Project States
State Definitions
CAPTURED
Definition: Raw idea logged, no validation work started.
Contains:
- Project name and slug
- One-liner description
- Date captured
- Initial notes/context
Entry: Idea captured via /tracker new
Exit: Problem/audience/hypothesis articulated → VALIDATING
Decay Window: 14 days Rationale: Ideas are cheap. Validate quickly or drop.
VALIDATING
Definition: Active problem/solution testing in progress.
Contains:
- Research notes
- Partial findings
- Competitor observations
- Community signals
Entry: From CAPTURED after hypothesis stated Exit: Complete validation report with verdict → VALIDATED
Decay Window: 30 days Rationale: Research shouldn't drag on indefinitely.
VALIDATED
Definition: Worth building, scope defined. Verdict rendered.
Contains:
- Full validation report
- Verdict (BUILD/PIVOT/KILL)
- Confidence level
- Scope fence
Entry: From VALIDATING after scout completes Exit (BUILD): Commit to proceed → ARCHITECTING Exit (KILL): → ARCHIVED
Decay Window: 21 days Rationale: Decide: build, pivot, or kill.
ARCHITECTING
Definition: Technical design in progress.
Contains:
- Architecture drafts
- Stack decisions
- Data model sketches
- Build roadmap draft
Entry: From VALIDATED after BUILD verdict accepted Exit: Architecture doc + roadmap approved → BUILDING
Decay Window: 14 days Rationale: Design paralysis is real. Ship the architecture.
BUILDING
Definition: Active development. MVP in progress.
Contains:
- Build log
- Progress notes
- Blockers
- Stage progress (1-11)
Entry: From ARCHITECTING after architecture approved Exit: MVP functional + launch checklist ready → LAUNCHING
Decay Window: 90 days Rationale: Longer runway, but not infinite. Ship something.
LAUNCHING
Definition: Preparing for and executing go-to-market.
Contains:
- Launch plan
- Assets created
- Timeline
- Channel strategy
Entry: From BUILDING after MVP complete Exit: Live with real users + baseline metrics → GROWING
Decay Window: 21 days Rationale: Launch momentum matters. Ship it.
GROWING
Definition: Live, acquiring users. Scaling and optimizing.
Contains:
- Growth model
- Experiment log
- Metrics dashboard
- Channel performance
Entry: From LAUNCHING after first real users Exit: Stable metrics + systems documented → OPERATING
Decay Window: 180 days Rationale: Growth takes time, but needs activity.
OPERATING
Definition: Steady state. Maintenance mode.
Contains:
- Ops playbook
- SOPs
- Team info
- Health metrics
Entry: From GROWING after systems stable Exit: Exit decision made → EXITING
Decay Window: None (no decay) Rationale: Maintenance can be sparse. No forced decay.
EXITING
Definition: Active exit process in progress.
Contains:
- Exit memo
- Data room
- Deal notes
- Buyer conversations
Entry: From OPERATING after exit decision Exit: Deal closed → EXITED
Decay Window: 60 days Rationale: Deals have momentum or they die.
EXITED
Definition: Exit complete. Transition finished.
Contains:
- Final outcome
- Deal terms
- Transition notes
- Learnings
Entry: From EXITING after deal closed Exit: After 30 days → ARCHIVED
Decay Window: None Rationale: Terminal state, auto-archives.
Special States
ICE ❄️
Definition: Intentionally frozen. Not dead, but not active.
Entry Triggers:
- Manual
/tracker icecommand - Decay hits 100% without action (auto-freeze)
Contains:
- Freeze date
- Freeze reason
- Previous state (preserved)
- Expected thaw conditions
Exit: Manual /tracker thaw → Returns to previous state
Decay: Frozen (no decay while on ice)
Time Limits:
| Duration | Action |
|---|---|
| 0-3 months | Standard ice |
| 3-6 months | Monthly prompt: "Still want this on ice?" |
| 6+ months | Force decision: REVIVE or ARCHIVE |
KILLED ⚰️
Definition: Failed or abandoned. Lessons logged.
Entry Triggers:
- Scout verdict = KILL
- Manual
/tracker killcommand - Abandoned from ICE (6+ months)
Contains:
- Kill reason
- Lessons learned
- Post-mortem summary
- Final state before kill
Exit: None (terminal)
ARCHIVED ✅
Definition: Successfully completed or permanently closed.
Entry Triggers:
- From EXITED after 30 days
- Manually archived from any state
- Killed projects move here
Contains:
- Full history
- Outcome summary
- Learnings
- Final artifacts
Exit: None (terminal)
Valid Transitions
CAPTURED → VALIDATING, ICE, KILLED
VALIDATING → VALIDATED, ICE, KILLED
VALIDATED → ARCHITECTING (if BUILD), KILLED (if KILL verdict), ICE
ARCHITECTING → BUILDING, ICE, KILLED
BUILDING → LAUNCHING, ICE, KILLED
LAUNCHING → GROWING, ICE, KILLED
GROWING → OPERATING, EXITING, ICE
OPERATING → EXITING, ICE
EXITING → EXITED
EXITED → ARCHIVED
ICE → (previous state via thaw)
Invalid Transitions (Blocked)
- Cannot skip states (e.g., CAPTURED → BUILDING)
- Cannot reverse flow (e.g., BUILDING → VALIDATING)
- Cannot un-kill or un-archive
Transition Verification
When /tracker update <project> <new-state> is called:
- Check current state - Load from project card
- Verify transition is valid - Check against valid transitions map
- Check gate requirements - Load from stage-gates.md
- Execute or block - Proceed if valid, explain if blocked