Shell
Monthly Strategy Ritual
Duration: 30 minutes
Trigger: End of month, /tracker strategy, or 30+ days since last
Purpose: Portfolio-level thinking, pattern recognition, strategic course correction
When to Run
- Last day of each month
- First day of new month
- Anytime you need to zoom out and think strategically
- When feeling overwhelmed or directionless
Strategy Flow
Phase 1: Load Everything (2 minutes)
Load all active projects
Load all ice projects
Load recent archive (last 90 days)
Load monthly snapshots (last 3 months from Memory MCP)
Phase 2: Portfolio Health (5 minutes)
Capacity assessment:
- Count active projects
- Compare to recommended (3-5 for solo builder)
- Assess: over/under/right-sized
Stage distribution:
- Count projects at each stage
- Identify bottlenecks (too many at one stage)
- Identify gaps (zero at important stages)
Phase 3: Month in Review (5 minutes)
List all significant events:
- State transitions
- Projects iced
- Projects killed
- New projects captured
- Major milestones
Phase 4: Ice Box Audit (5 minutes)
For each iced project:
- Calculate duration on ice
- Force decision if 6+ months
- Prompt for thaw/archive decision
Phase 5: Pattern Recognition (8 minutes)
Analyze:
- What's working (successful patterns)
- What's not working (stall patterns)
- Recurring blockers
- Velocity trends
Extract learnings:
- Technical
- Market
- Process
Phase 6: Set Intentions (5 minutes)
Based on analysis:
- Primary focus (1-2 projects)
- Projects to ice (for focus)
- New captures to consider
- Process experiments
Output Format
# Monthly Strategy - {MONTH YEAR}
## Portfolio Health
### Capacity Assessment
| Metric | Value | Assessment |
|--------|-------|------------|
| Active projects | {n} | {Over capacity/Right-sized/Room for more} |
| Recommended max | 4-5 | - |
| Ice projects | {n} | - |
| Total pipeline | {n} | - |
{If over capacity:}
⚠️ **Over capacity.** Consider icing {n} projects to focus.
{If under capacity:}
✅ **Room for more.** Pipeline could use new captures.
### Stage Distribution
CAPTURED {bar} {n} {bottleneck/gap flag} VALIDATING {bar} {n} VALIDATED {bar} {n} ARCHITECTING {bar} {n} BUILDING {bar} {n} LAUNCHING {bar} {n} GROWING {bar} {n} OPERATING {bar} {n}
**Observations:**
- {e.g., "Heavy concentration in BUILDING (5) - shipping bottleneck"}
- {e.g., "No projects in VALIDATING - validation pipeline dry"}
- {e.g., "3 in OPERATING - good stable revenue base"}
---
## Month in Review
### State Transitions
| Date | Project | From → To | Notes |
|------|---------|-----------|-------|
| {date} | {project} | {from} → {to} | {notes} |
**Summary:** {n} projects advanced, {n} stalled, {n} reversed
### Projects Iced
| Project | Date | Reason |
|---------|------|--------|
| {name} | {date} | {reason} |
### Projects Killed
| Project | Date | Lessons |
|---------|------|---------|
| {name} | {date} | {key lesson} |
### New Captures
| Project | Date | One-liner |
|---------|------|-----------|
| {name} | {date} | {one-liner} |
---
## Ice Box Audit
| Project | Iced | Duration | Decision |
|---------|------|----------|----------|
| {name} | {date} | {N months} | {REVIVE / ARCHIVE / Keep} |
{For each 6+ months:}
### ⚠️ {Project} - On Ice {N} Months
**Original freeze reason:** {reason}
**Current relevance:** {still valid / outdated}
**Decision required:**
- [ ] REVIVE - Thaw and return to {previous state}
- [ ] ARCHIVE - Close permanently, capture learnings
---
## Pattern Recognition
### What's Working ✅
{Patterns that led to progress:}
1. **{Pattern}** - {Evidence}
- {e.g., "Daily 1-hour focused blocks led to consistent BUILDING progress"}
2. **{Pattern}** - {Evidence}
- {e.g., "Running Scout before committing prevented 2 bad builds"}
### What's Not Working ⚠️
{Patterns that led to stalls:}
1. **{Pattern}** - {Evidence}
- {e.g., "ARCHITECTING → BUILDING taking 3x expected time"}
- **Hypothesis:** Over-engineering before MVP
2. **{Pattern}** - {Evidence}
- {e.g., "3 projects iced this month"}
- **Hypothesis:** Saying yes too fast at CAPTURED
### Recurring Blockers
| Blocker Type | Frequency | Projects Affected |
|--------------|-----------|-------------------|
| {type} | {n} times | {projects} |
**Most common:** {blocker}
**Mitigation:** {suggestion}
---
## Learnings Harvest
### Technical Learnings
{What you learned about building:}
- {e.g., "Supabase RLS policies need more upfront design"}
- {e.g., "Playwright E2E tests catch more than unit tests for UI"}
### Market Learnings
{What you learned about users/markets:}
- {e.g., "Solo creators prefer simple over powerful"}
- {e.g., "Free tier conversions higher than expected"}
### Process Learnings
{What you learned about how you work:}
- {e.g., "Weekly reviews prevent surprise freezes"}
- {e.g., "Morning is best for BUILDING, afternoon for VALIDATING"}
---
## Next Month Intentions
### Primary Focus
{Which 1-2 projects get most attention:}
**1. {Project}**
- Current state: {state}
- Monthly goal: {specific outcome}
- Why prioritized: {rationale}
**2. {Project}**
- Current state: {state}
- Monthly goal: {outcome}
- Why: {rationale}
### Projects to Ice
{To create focus:}
- {Project} - {reason to pause}
### New Captures to Consider
{Ideas worth adding:}
- {Idea} - {why worth capturing}
### Process Experiments
{Things to try differently:}
- {Experiment} - {expected outcome}
---
## Monthly Metrics
| Metric | This Month | Last Month | 3-Month Avg | Trend |
|--------|------------|------------|-------------|-------|
| Projects advanced | {n} | {n} | {n} | {↑/↓/→} |
| Projects iced | {n} | {n} | {n} | {↑/↓/→} |
| Projects killed | {n} | {n} | {n} | {↑/↓/→} |
| Avg decay | {n}% | {n}% | {n}% | {↑/↓/→} |
| Avg days in stage | {n} | {n} | {n} | {↑/↓/→} |
| Gate completions | {n} | {n} | {n} | {↑/↓/→} |
---
## Strategy Complete
**Time spent:** ~30 minutes
**Next monthly strategy:** {first of next month}
### Key Insight
{Single most important takeaway from this review:}
> "{insight}"
*Store this insight. Revisit next month.*
---
*Strategy captured in Memory MCP for trend tracking.*
Memory Integration
Store Monthly Snapshot
mcp__memory__create_entities({
name: "monthly-strategy-{YYYY-MM}",
entityType: "monthly-strategy",
observations: [
"active: {n}",
"ice: {n}",
"advanced: {n}",
"iced: {n}",
"killed: {n}",
"avg_decay: {n}%",
"key_insight: {insight}",
"working_patterns: [{patterns}]",
"broken_patterns: [{patterns}]",
"primary_focus: {project}"
]
})
Track Learnings
mcp__memory__add_observations({
entityName: "id8labs-learnings",
contents: [
"Technical: {learning}",
"Market: {learning}",
"Process: {learning}"
]
})
Retrieve Historical Data
# Get last 3 monthly snapshots
mcp__memory__search_nodes({
query: "monthly-strategy"
})
Capacity Guidelines
| Active Projects | Assessment | Recommendation |
|---|---|---|
| 1-2 | Under capacity | Room for more captures |
| 3-4 | Optimal | Healthy portfolio |
| 5-6 | At capacity | Be selective about new |
| 7+ | Over capacity | Ice or kill to focus |
Factors that affect capacity:
- Project complexity (simple vs complex)
- Stage distribution (BUILDING takes more than OPERATING)
- External commitments (job, family, etc.)
- Current energy levels
Bottleneck Detection
| Pattern | Indicates | Action |
|---|---|---|
| 3+ projects in BUILDING | Shipping bottleneck | Focus on launching |
| 0 projects in VALIDATING | Dry pipeline | Capture new ideas |
| Many in CAPTURED | Validation bottleneck | Run Scout on backlog |
| 3+ iced in month | Capacity issue | Reduce intake |
| Avg decay rising | Attention spread thin | Consolidate focus |