Scale computer-use 2.0 with open-source drivers, cross-OS sandboxes, and benchmarks for training, evaluation, and data generation.
MCP candidate qualification
The CI: Driver MCP candidate workflow builds the exact pull-request head
on hosted Linux and Windows runners. It runs the envelope receiver and service
tests, then uploads unsigned development binaries with their source SHA,
toolchain, build profile, version, and SHA256 hashes. It has read-only repository
permissions and no cloud credentials. It does not publish a release, install a
product, change an image, or connect to a guest computer.
These artifacts support separately authorized disposable-guest tests. Check the workflow repository, source SHA, successful jobs, and every binary hash before using an artifact. Do not select an artifact by version alone: an unreleased source build can report the same package version as a released binary.
Live test gate
For each selected Linux and Windows guest image:
- Record the immutable image reference and installed Driver, cua-spacesd, and MCP-wrapper versions. Use an owned disposable guest with explicit resource limits and verified cleanup ownership.
- Stage the exact candidate separately. Preserve the guest cua-spacesd. Start Driver in the guest's interactive desktop session through its existing socket or named pipe. Enable the envelope opt-in in both the daemon and MCP proxy.
- Disable raw request/response logging before action-bearing tests. Reuse the existing named MCP service and access boundary; do not introduce a new network endpoint or substitute the operator's local desktop.
- Use matching generated bindings with
sb.driver.connect(service="mcp", transport="mcp"). Prove a useful guest effect with fresh before/after Driver state and an independent guest postcondition. A successful call alone is not the oracle. - Verify independent sessions, cancellation without claiming rollback, stale session rejection after replacement, access rejection, and continued cua-spacesd functionality. Verify receiver and MCP-session cleanup independently from guest resource cleanup.
- Delete only the task-owned resources and confirm their absence. Preserve failure and cleanup evidence, including any incomplete result.
A staged development-binary result is not packaged-image certification or the full canonical desktop matrix. A release/image enablement decision still needs the applicable exact-candidate desktop harness evidence, packaged-image replay, and separate rollout approval. Keep existing defaults and images unchanged.