Skip to content

PostgreSQL backup tool with Point-In-Time-Recovery and restore verification

7.3 KB
Raw Blame

Context

See proposal.md for the motivation and specs/ci-pipeline/spec.md for the required behavior.

test-backend waits for lint-backend (.github/workflows/ci-release.yml:248) and runs the whole backend suite in one step: go test -p=8 -count=1 -failfast -timeout 40m ./internal/... (.github/workflows/ci-release.yml:352). The comment above that command (.github/workflows/ci-release.yml:350-351) notes that 8 workers oversubscribe the runner's 4 vCPU. Before the tests, the job frees disk space, starts the compose fixtures, provisions and migrates 8 slot databases and pulls every test image (.github/workflows/ci-release.yml:250-339).

In the last green run of the full suite (run 38079240506), lint-backend took 4:09 and test-backend took 13:45. Of those 13:45, setup took about 4:25 and go test took 9:16. The 88 packages with tests reported a combined 2635 seconds:

Group Packages with tests Combined time Longest package
physical (internal/features/tests/physical/...) 2 514 s pg17, 318 s
logical (internal/features/tests/logical/...) 4 511 s postgresql, 181 s
other 82 1610 s backups/backups/usecases/physical/postgresql, 366 s

These times were measured under the CPU contention described above, so each package should run faster on a less loaded runner. That speed-up is an expectation, not a measurement.

The publishing jobs gate on determine-version (.github/workflows/ci-release.yml:780), which needs every test job but not lint-backend. The main image reaches the lint through build-image (.github/workflows/ci-release.yml:620). The verification image reaches it only through test-backend: push-verification-image needs determine-version and build-verification-image (.github/workflows/ci-release.yml:982), and build-verification-image needs only the agent lint and the Dockerfile scan (.github/workflows/ci-release.yml:754).

Constraints: the root AGENTS.md requires every new action to be pinned to a full commit SHA and keeps permissions: contents: read at the top level. This change adds no action and no permission. backend/AGENTS.md governs the new backend/Justfile recipe. ADR-0013 boots one shared container per database version inside a test process. Splitting the suite across runners keeps that model, and each runner holds fewer containers at once.

Goals / Non-Goals

Goals:

  • Remove the lint wait from the path to the backend test result.
  • Spread the backend suite over three runners without a hand-maintained list of packages.
  • Keep every publishing path gated on the backend lint and on all three groups.

Non-Goals:

  • An even balance between the groups. The other group stays the longest; see Risks.
  • Faster setup inside a group.

Decisions

1. Gate the release on the lint directly instead of through the tests

test-backend drops needs: [lint-backend], and determine-version adds lint-backend to its needs. Every publishing job already needs determine-version, and its if: conditions use the implicit success(), so a failed lint skips all of them. The lint always finishes before the tests, so the extra dependency adds no wall-clock time.

Alternatives rejected:

  • Drop the dependency and change nothing else. The verification image would then be published for a commit whose backend lint failed.
  • Add lint-backend to push-verification-image only. It closes today's gap, but the next publishing job that hangs off determine-version would reopen it.

2. Split by package path, with other as the catch-all

The physical group is ./internal/features/tests/physical/..., and the logical group is ./internal/features/tests/logical/.... The other group is go list ./internal/... without packages whose import path matches /internal/features/tests/(physical|logical)(/|$). The filter excludes only these two subtrees, not all of internal/features/tests/. A new sibling directory under tests/ therefore lands in other instead of being skipped.

Alternatives rejected:

  • Split by database engine, with each group pulling only its own images. It saves pull time and disk space, but every new package would need a deliberate assignment, and the proposal leaves per-group images out of scope.
  • Shard automatically, by hash or round-robin over go list. Nothing would need maintenance, but the balance would be accidental and would shift with every new package.
  • Exclude all of internal/features/tests/ from other. A new directory there would run in no group.

3. One recipe prints a group's packages

A recipe test-group-packages <group> in backend/Justfile prints the import paths of physical, logical or other and fails for any other name. The CI step passes its output to go test. A local check combines the three outputs and compares them with go list ./internal/..., which proves that the groups cover every package exactly once.

Alternative rejected: inline the go list and grep calls in the workflow step. The partition could then be checked only by a CI run, and a typo in a pattern would silently drop packages from the suite.

4. A matrix job with fail-fast: false

test-backend gets strategy.matrix.group: [physical, logical, other] and strategy.fail-fast: false. The group reaches the shell through an env entry rather than a ${{ }} expression inside the script. Every leg keeps the current setup steps unchanged: 8 slot databases, -p=8, -failfast and the 40-minute go test timeout. GitHub names the checks test-backend (physical), test-backend (logical) and test-backend (other), and needs: test-backend waits for every leg.

Alternatives rejected:

  • Three copies of the job. Each copy would repeat about 100 lines of setup that must then be kept in sync by hand.
  • Keep the default fail-fast: true. A failing leg would cancel the others, so a rerun of the failed jobs would repeat the cancelled legs too.
  • A reusable workflow or a composite action for the setup. The matrix already removes the duplication, and both options add a file and an indirection for a single caller.

Risks / Trade-offs

  • [The other group stays the long pole, with 1610 of the 2635 seconds and the longest single package] → The gain on the test step is smaller than an even split would give. By rough estimate, the step drops from 9:16 to about 6–7 minutes. The path to a test result drops from about 18 minutes to about 11–12, with most of the gain coming from the removed lint wait. A follow-up can move the heaviest packages of other into physical once real timings are in.
  • [Each leg repeats the setup of about 4.5 minutes, including the "Free disk space" step, which took 5:40 in one run] → The legs run in parallel, so the duplicated setup costs runner minutes but no wall-clock time. Public repositories do not pay for hosted runners.
  • [Three legs pull about 22 GB of images each, three times the registry traffic of today] → The pull already retries three times per image. A per-group image set is a follow-up.
  • [A lint failure no longer saves the test runners] → Publishing still stops at the lint, through decision 1.
  • [The check name changes from test-backend to three names] → No branch protection and no active ruleset requires the old name, so nothing has to be updated.

Migration Plan

The change lands in one commit. To roll back, revert that commit.