Skip to content

PostgreSQL backup tool with Point-In-Time-Recovery and restore verification

3.4 KB
Raw Blame

Purpose

Defines when the backend checks run in CI, how the backend test suite is split across runners, and which checks must pass before an image is published or a release is made.

ADDED Requirements

Requirement: Backend tests start without waiting for the backend lint

When CI runs the backend lint and the backend tests for a commit, the backend tests SHALL start without waiting for the lint result. A failed lint SHALL NOT cancel or skip the backend tests.

Scenario: Lint and tests start together

  • WHEN CI starts the backend checks for a pull request
  • THEN the backend lint check and every backend test check start without one waiting for the other

Scenario: Lint fails

  • WHEN the backend lint check fails while the backend tests run
  • THEN the backend test checks run to completion and report their own results

Requirement: The backend suite runs as three groups that cover every package once

CI SHALL run the backend test suite as three checks on separate runners, and the checks SHALL run at the same time. The physical group SHALL run the end-to-end physical backup tests, and the logical group SHALL run the end-to-end logical backup tests. The other group SHALL run every remaining backend package. Each backend package SHALL run in exactly one group. A backend package added outside the end-to-end physical and logical backup tests SHALL run in the other group without any change to the CI configuration.

Scenario: The groups cover the suite

  • WHEN the package lists of the three groups are combined
  • THEN they contain every backend package exactly once

Scenario: A new package is added

  • WHEN a developer adds a backend package outside the end-to-end physical and logical backup tests
  • THEN CI runs its tests in the other group

Scenario: Checks are reported per group

  • WHEN CI runs the backend tests
  • THEN each group reports its own check, named test-backend (physical), test-backend (logical) and test-backend (other)

Requirement: A failed group neither cancels nor hides the others

When one backend test group fails, the other groups SHALL run to completion and report their own results. The developer SHALL be able to rerun only the failed group.

Scenario: One group fails

  • WHEN a test in the other group fails while the physical and logical groups still run
  • THEN the physical and logical groups keep running and report their own results

Scenario: Rerun of the failed group

  • WHEN the developer reruns the failed jobs of that workflow run
  • THEN only the failed group runs again, and the groups that passed keep their results

Requirement: Publishing and release require the lint and every test group

CI SHALL publish an image or create a release only when the backend lint and all three backend test groups have passed for that commit. Running the lint and the tests in parallel SHALL NOT let a commit with a failed lint or a failed group reach publishing or release.

Scenario: Lint fails on main

  • WHEN the backend lint fails on a push to main while all three test groups pass
  • THEN CI publishes no image and creates no release for that commit

Scenario: One group fails on main

  • WHEN the lint and two test groups pass on a push to main but the third group fails
  • THEN CI publishes no image and creates no release for that commit