RENAMED Requirements

  • FROM: ### Requirement: The backend suite runs as three groups that cover every package once
  • TO: ### Requirement: The backend suite runs as whole and sharded groups that cover every test once

MODIFIED Requirements

Requirement: The backend suite runs as whole and sharded groups that cover every test once

CI SHALL run the backend test suite as separate checks on separate runners, and the checks SHALL run at the same time. The physical group SHALL run the end-to-end physical backup tests, and the logical group SHALL run the end-to-end logical backup tests. The wal-usecases group SHALL run the package of the physical backup and WAL streaming use cases. The other group SHALL run every remaining backend package. Each backend package SHALL belong to exactly one group. A backend package added outside these named groups SHALL run in the other group without any change to the CI configuration.

A group MAY run as several shards. Each shard SHALL run the tests of its group's packages that fall into that shard, and every top-level test of those packages SHALL run in exactly one shard. A test added to a sharded group SHALL run in one of its shards without any change to the CI configuration. How tests are assigned to shards MAY use recorded test durations, and a missing or outdated duration SHALL only change which shard runs a test, never whether it runs. physical and wal-usecases SHALL run as three shards each, and logical and other SHALL each run whole.

Scenario: The groups cover the suite

  • WHEN the package lists of the groups are combined
  • THEN they contain every backend package exactly once

Scenario: The shards cover their group

  • WHEN the tests of all shards of one group are combined
  • THEN they contain every top-level test of that group's packages exactly once

Scenario: A new package is added

  • WHEN a developer adds a backend package outside the named groups
  • THEN CI runs its tests in the other group

Scenario: A new test is added to a sharded group

  • WHEN a developer adds a top-level test to a package of a sharded group and records no duration for it
  • THEN CI runs that test in exactly one shard of the group

Scenario: Checks are reported per group

  • WHEN CI runs the backend tests
  • THEN each whole group and each shard reports its own check, named test-backend (other), test-backend (logical), test-backend (physical-1-of-3) through test-backend (physical-3-of-3) and test-backend (wal-usecases-1-of-3) through test-backend (wal-usecases-3-of-3)

Requirement: Publishing and release require the lint and every test group

CI SHALL publish an image or create a release only when the backend lint and every backend test check, each whole group and each shard, have passed for that commit. Running the lint and the tests in parallel SHALL NOT let a commit with a failed lint, a failed group or a failed shard reach publishing or release.

Scenario: Lint fails on main

  • WHEN the backend lint fails on a push to main while every backend test check passes
  • THEN CI publishes no image and creates no release for that commit

Scenario: One group fails on main

  • WHEN the lint and every other backend test check pass on a push to main but one shard fails
  • THEN CI publishes no image and creates no release for that commit