PostgreSQL Physical Backup Failover Specification

Purpose

Keep PostgreSQL physical backups recoverable when the source moves to a new timeline. Databasus rejects incremental backups that would extend an obsolete chain, creates a replacement FULL, and preserves the WAL needed during the transition.

Requirements

Requirement: Incremental backups use their root FULL timeline

The system SHALL start an incremental backup only when the live PostgreSQL timeline matches the timeline of the chain's root FULL.

Scenario: Timeline matches the root FULL

  • WHEN an incremental backup starts and the live timeline matches its root FULL timeline
  • THEN the system proceeds with the incremental backup

Scenario: Promotion happened before the incremental started

  • WHEN the live timeline is newer than the root FULL timeline
  • THEN the system refuses the incremental backup as CHAIN_BROKEN with reason TIMELINE_SWITCH_DETECTED

Scenario: Source timeline regressed

  • WHEN the live timeline is older than the root FULL timeline
  • THEN the system refuses the incremental backup with reason TIMELINE_REGRESSION

Scenario: Cataloged history is newer than the root FULL

  • WHEN a history file for the live timeline is already cataloged but the root FULL belongs to an older timeline
  • THEN the system still refuses the incremental backup as TIMELINE_SWITCH_DETECTED

Requirement: Backup failures are rechecked for promotion

The system SHALL check PostgreSQL cluster identity again when a physical backup stream fails unexpectedly while the backup is still active.

Scenario: Promotion interrupts an incremental stream

  • WHEN the timeline advances after incremental preflight and the stream fails
  • THEN the system records the incremental as CHAIN_BROKEN with reason TIMELINE_SWITCH_DETECTED

Scenario: Promotion interrupts a FULL stream

  • WHEN the timeline advances after FULL preflight and the stream fails
  • THEN the system records the FULL as ERROR with reason FAILOVER_DURING_BACKUP

Scenario: Backup was canceled

  • WHEN an operator or configuration change cancels the backup
  • THEN the system preserves the cancellation result and does not classify it as a promotion

Scenario: Recheck cannot connect

  • WHEN the second identity check fails
  • THEN the system preserves the original backup result

Scenario: Cluster identity changed

  • WHEN the second identity check reaches a cluster with a different system identifier
  • THEN the system rejects that cluster and pauses automatic backup scheduling until an operator requests a FULL that completes against the expected cluster

Scenario: Operator requests a FULL after cluster identity changed

  • WHEN automatic scheduling is paused by a system identifier mismatch and an operator requests a FULL
  • THEN the system runs preflight again and refuses to write a backup unless the live system identifier matches the configured database

Scenario: Forced FULL still reaches a different cluster

  • WHEN the operator-requested FULL is refused with SYSTEM_IDENTIFIER_MISMATCH
  • THEN automatic backup scheduling remains paused

Scenario: Forced FULL fails without proving cluster identity

  • WHEN an operator-requested FULL fails for another reason or is canceled
  • THEN automatic backup scheduling remains paused because no later FULL has completed against the expected cluster

Scenario: Forced FULL reaches the expected cluster

  • WHEN an operator-requested FULL completes against the configured system identifier
  • THEN that newer completed FULL supersedes earlier mismatch results and normal automatic scheduling resumes

Requirement: Timeline failures trigger one immediate replacement FULL

The system SHALL create one immediate replacement FULL after a backup ends with a timeline-related failure.

Scenario: Incremental chain broke after promotion

  • WHEN an incremental ends as CHAIN_BROKEN with reason TIMELINE_SWITCH_DETECTED and no later FULL attempt exists
  • THEN the system schedules a FULL without waiting for the configured incremental or FULL interval

Scenario: FULL was interrupted by promotion

  • WHEN the latest FULL ends as ERROR with reason FAILOVER_DURING_BACKUP
  • THEN the system schedules one replacement FULL without waiting for the configured interval

Scenario: Replacement FULL fails normally

  • WHEN the immediate replacement FULL ends with a non-timeline error or is canceled
  • THEN the system resumes its existing schedule and failed-FULL retry limits instead of scheduling a FULL on every scheduler tick

Scenario: Another promotion interrupts the replacement

  • WHEN the timeline advances again during the replacement FULL
  • THEN the system schedules one new immediate replacement FULL for the later promotion

Scenario: Two schedulers hold the same stale replacement decision

  • WHEN two scheduler instances decide that the same terminal backup needs an immediate replacement
  • THEN only the instance that confirms the failure is still current creates a FULL row

Requirement: Active FULL backups retain archived WAL

The system SHALL keep orphan cleanup from deleting WAL for a database while a FULL backup for that database is active.

Scenario: Cleaner runs during the first FULL

  • WHEN WAL is archived while the database's first FULL is still running and orphan cleanup starts
  • THEN the WAL remains cataloged and stored for use after the FULL completes

Scenario: Cleaner finishes before a FULL starts

  • WHEN orphan cleanup starts before the scheduler starts a FULL for the same database
  • THEN the FULL starts only after cleanup finishes

Requirement: Same-timeline PITR remains available during a newer FULL

The system SHALL allow a point-in-time restore from an older FULL when the target comes before a newer FULL completes on the same timeline.

Scenario: Target falls during the newer FULL

  • WHEN the requested target is later than the older FULL completion and earlier than the newer FULL completion
  • THEN the restore uses the older FULL and contiguous WAL through the target, even when that WAL crosses the newer FULL start position

Scenario: Target crosses a promotion

  • WHEN reaching the target would require WAL from more than one timeline
  • THEN the system reports that the target is not restorable until a FULL on the promoted timeline is available