Open-source design agent: on-brand stills, decks, diagrams, charts and motion graphics from a chat thread, built on Deep Agents.
Briefs
Fill-in briefs, one per job. The brief is the role: every helper is the same worker, and the brief
makes it a builder, a critic, an analyst or a sound designer. Start one with
start_task(description=<the filled brief>, effort=...); it runs in the background. The
launch_film pipeline sends its steps with pointers to these same files, so a brief here is read
by its sandbox path (/skills/launch-film/briefs/<file>) as often as it is pasted.
A helper sees only its brief and the files the brief names, and cannot be messaged while it runs. So every brief states everything: the role, why the work matters, the quality bar, the inputs, the contract, the deliverables, the method, how to verify, the constraints, the budget, how to resume, and the report.
| Brief | effort |
When |
|---|---|---|
| concept.md | max for a long film, xhigh otherwise |
Phase 2: directions, the recommended concept, a board draft |
| analyst.md | xhigh |
A reference to recreate or learn from; a supplied track or voiceover |
| act-builder.md | max or xhigh |
The lead act and every act; re-layouts; polish passes |
| sound.md | xhigh |
The score and effects, when you don't make them yourself |
| critic.md | xhigh (max for a launch film's final review) |
Every gate |
| helper.md | low |
Integration previews, the final render, variants, share encodes |
| resume.md | the same effort as the original | A failed or interrupted task; change notices between waves |
Fill every {{…}}, delete the blocks that don't apply ([recreation] or [original]), and keep a
filled brief under about 2,000 words: point to files for anything longer. Check every fact you put
in a brief, or mark it "unverified, check". A brief that says "music only" for a film that turns out
to be cut to a voiceover sends every helper the wrong way.
Every helper keeps its progress file current and tells the lead how it is going with
report_progress (when a section is done, when something blocks it or moves its ETA, before it stops
early). Helpers never upload, post or publish; the lead delivers.