Skip to content

Python tool for aircraft Doppler audio geolocation using historical ADS-B flight data (Source-available)

Document overloaded track-query retry

Cinna Davisc9e7171f9c9d
diff --git a/docs/DATA_AND_SCALE.md b/docs/DATA_AND_SCALE.md
index 89016ca..1422d33 100644
--- a/docs/DATA_AND_SCALE.md
+++ b/docs/DATA_AND_SCALE.md
@@ -84,12 +84,15 @@ worker processes for the built-in cached-terrain provider, automatically choosin
one fewer worker than the available logical CPUs, with a minimum of one. Custom
terrain providers use serial execution. Hard limits on grid cells, tracks, samples,
CPA rows and candidate combinations bound each worker's allocations; total memory
-grows with the worker count. When a tile exceeds a per-tile capacity limit, the
-search divides it into smaller nonoverlapping grid rectangles and checkpoints
-each completed piece. Fine search also divides overloaded rectangles. A capacity
-failure at a single grid cell, missing data, and other errors remain visible as
-incomplete work. Reducing `tile_cells` trades scheduling overhead for smaller
-working sets.
+grows with the worker count. An overloaded track query is retried with the same
+conservative observer-distance test used by the scorer. Tracks with unsupported
+motion remain in the result so their uncertainty is recorded. If a recognized
+capacity limit is still exceeded, the search divides the tile into smaller
+nonoverlapping grid rectangles and checkpoints each completed piece. Fine search
+also divides overloaded rectangles.
+A capacity failure at a single grid cell, missing data, and other errors remain
+visible as incomplete work. Reducing `tile_cells` trades scheduling overhead for
+smaller working sets.
Workers retain private score ledgers. The parent verifies their identities and
checksums before importing a completed tile, and merges rankings in deterministic
@@ -100,6 +103,12 @@ shared-machine replay of two real grid points from a full-day search, one worker
took 64.93 seconds and two took 38.95 seconds including startup, with identical
payloads and ledgers. This small sample does not predict nationwide runtime.
+In one real full-day grid cell, the track retry reduced 1,929 queried tracks to
+614 within the configured memory limit. All 200 tracks with unsupported motion
+remained. Complete scoring with the full and reduced sets produced identical
+results, support records and retention checksums. This does not establish that
+other overloaded cells will fit within the limits or resolve unsupported motion.
+
Candidate scores are merged deterministically with approach identities, then
global finalists are refined on the same global grid in bounded subtiles. The
coarse spacing is a computational budget, not a proof that an isolated minimum