Skip to content

Garry's Opinionated OpenClaw/Hermes Agent Brain

TypeScript
1.6 KB
Raw Blame

type: "note" title: "Rebar Robot Maintenance Checklist" tags: ["construction-site-robotics"]

Rebar Robot Maintenance Checklist

Rebar Robot Maintenance Checklist — Working Note

Date: 2024-04-21
From: Ephik, Field Tech Lead

Observations:

  • TieBot #7 has shown slight delay in tying cycle times over the past week; average cycle up from 12.3s to 13.1s. Suspected minor wear on wrist servo.
  • Battery health checks on all units show 87-92% capacity remaining after 150 charge cycles, within expected range but trending downward.
  • Cameras on TieBot #4 appear slightly fogged during morning shifts — possibly condensation inside housing. Need to inspect seals.

Measurements:

  • Wrist servo torque output measured at 1.45 Nm on unit #7, down from 1.6 Nm baseline.
  • Dust accumulation inside unit #2’s ventilation grills measured ~0.8 mm layer — recommend more frequent filter swaps.
  • Battery charge time stable at ~110 minutes, no anomalies.

Open Questions:

  • How often should we recalibrate the servo torque sensors? Currently doing it every 3 months, but maybe quarterly is too long?
  • Any updates on firmware patches addressing thermal regulation — overheating warnings popped up in the last firmware version.

Next Steps:

  • Schedule servo replacement on unit #7 ahead of next project phase.
  • Replace camera seals on unit #4 and monitor for fogging next week.
  • Increase filter replacement frequency from biweekly to weekly for dusty sites.
  • Check in with firmware team about thermal regulation fixes and possible calibration intervals.