Garry's Opinionated OpenClaw/Hermes Agent Brain
TypeScript
docs(eval): #6278 Phase 4.1b lock scenario on a99c00565 (budget releases the head, pool still pinned by unbounded reads, stall line prints, queue_capacity exit, stalled hold re-held)
garrytand29a048a6525
diff --git a/docs/eval/managed-sync-stall-repro.md b/docs/eval/managed-sync-stall-repro.mdindex 191348e02b..5f942ec1f9 100644--- a/docs/eval/managed-sync-stall-repro.md+++ b/docs/eval/managed-sync-stall-repro.md@@ -429,3 +429,100 @@ already running"); the bench records that in `adoption.jsonl` (`json_head`).these rates, so under the reporter's `timeout 3600` loop it is two passesby arithmetic, not by a stall; under the reporter's actual `timeout 14400`it would be one.++### Phase 4.1b: lock scenario on a99c00565++Same lock scenario (3,000-entry backlog, heavy adoption, pool 10, 57 ms,+PgBouncer transaction mode, `LOCK TABLE pages IN ACCESS EXCLUSIVE MODE` held+through the pooler 14:34:10-14:39:07 and 14:44:07-14:49:07, 15 s sampler)+on `capy/6278-preparation-deadline` a99c00565: lane A9 (preparation reads+under a transaction-local `statement_timeout` of the remaining budget), lane+B6 (the `stalled <N>s on <step>` line reads the live head during a pass) and+the drain's owner-pid fix. Captures under `stall-lock-b/`.++- **Release at the budget: the head member, yes; the pool, no.** The+ consumer logged `phase=preparation reason=deadline_exceeded` at the 120 s+ mark and the progress line went `stalled 120s on import_content (waiting+ on db)` → `stalled 7s on preparing` → `stalled 16s on origin_check (waiting+ on db)`: the group head was released `preparation_deadline`, reclaimed+ within about 10 s and charged (attempt 2). At 240 s (14:38:10) it was+ finished `failed` / `preparation_stalled` at step `origin_check` (`waiting+ on db`, `preparation_attempts: 2`), the hold for `companies/scale-0-3152.md`+ was written with that step, and the 73 members behind it were cancelled+ ("an earlier page of the same sync did not commit") to be re-frozen. Time+ to hold: 240 s, inside budget × attempts + slack. The other members' release+ statements queued behind the pool: a release `UPDATE` issued at 14:36:06+ completed only at 14:39:07, when the lock dropped, and the four+ `import_content` members and five unstamped followers stayed `running` for+ the whole hold.+- **Connections were not freed.** 9 of the sync's 10 pool connections sat in+ `Lock` / `relation` for all 300 s of both episodes, exactly as on the+ previous head. Every one of the nine is an autocommit statement outside+ the bounded path (`xact_age` = `query_age`, no `BEGIN`): the import+ pipeline's content-hash lookup (`SELECT id, slug FROM pages WHERE source_id+ = $1 AND deleted_at IS NULL AND (content_hash = $2 OR …)`, four+ connections), `readPageSnapshot` (`WITH chosen AS (SELECT p.* FROM pages+ …)`), the `page_projections` join, and the group-memoized origin read+ (`SELECT id,slug,source_path FROM pages WHERE source_id=$1 AND+ source_path=ANY($2)`, three to four connections; `preparationReads` drops+ the member's bound by design). The bound itself ran: the trace shows 2,035+ `BEGIN; SET LOCAL statement_timeout = 116000-120000` transactions in the+ pass, but no statement was ever ended by it (zero 57014 on a `pages` read)+ because the statements that block under this lock are not the ones it+ wraps. The reclaimed head member's own bounded `origin_check` read never+ appears in `pg_stat_activity`: with nine connections pinned it waited for+ a connection (`waiting_on: db` on the stamp) until the consumer's race+ finished it at 240 s.+- **Lock drop to first commit:** episode 1, 14:39:07 → about 14:41:15 (two+ minutes: the cut group's 73 cancelled pages were re-frozen and re-admitted+ before anything committed; previous head: 28 s, with no cut). Episode 2,+ 14:49:07 → 14:55:56, through the queued adoption writes (85) the lock had+ stalled, the same flood as before. `preparation_abandoned`,+ `ceiling_exceeded` and `restart_required`: none (correct, nothing reached+ the ceiling). The adoption write the second lock caught went+ `preparation_stalled` at `page_snapshot` after two cut-offs (14:48:19), as+ on the previous head.+- **The progress line prints.** 127 lines in the pass, with the step, the+ wait cause and the allowance: `[sync] 165/3000 processed · stalled 120s on+ import_content (waiting on db) · allowed 2m30s`, then `origin_check`,+ `page_snapshot` in the second episode, and `stalled 306s on queued` once+ nothing was running. Two things to know when reading it: while the head is+ a fresh adoption write every few seconds (the flood after the lock) it+ prints `stalled 2s on preparing` every 10 s for ten minutes, because the+ number is the head claim's step age, not the time since the last committed+ sync page (the `queued` form does show the queue age: `stalled 636s on+ queued`); and after the head was reclaimed the line switched to the oldest+ running member (`stalled 250s…300s on import_content`), which is the right+ head but a different request from the one it had been naming.+- **The run did not finish on its own.** Pass 1 ended after 1,501 s with+ 242 pages committed and `Error [queue_capacity]: Write capacity exhausted:+ principal outstanding requests` (exit 1, no drain summary; the error names+ `--retry-failed` as the fix), and pass 2 failed the same way six seconds+ in. `persistence.limits.principal_outstanding` is 100 and the+ `local_cli` principal (shared by the sync and the `dream` on the host)+ held 89 queued adoption writes plus one running when the sync admitted its+ next window. The same condition existed in the previous head's lock run+ (99 queued + 1 running at 09:57:29) without killing the pass, so whether a+ pass survives it depends on the window size against the remaining+ capacity; none of the four earlier runs hit it. Ten minutes later, after+ the adoption queue drained, the `retry-held` route (`gbrain sources+ retry-held bench`, then the printed `gbrain sync --source bench --no-pull+ --no-embed`, `--no-embed` carried this time from the stalled hold's+ `sync_argv`) imported the rest: 2,755 entries in 1,006 s, `Managed sync+ synced`, 2,979 of 3,000 committed = 3,000 − 20 fence holds − 1 stalled+ hold. That last one is the open point: `companies/scale-0-3152.md` was+ scheduled by `retry-held` (`retry_scheduled`) and the sync re-held it+ ("21 file(s) held this run", `summary.stalled: 1`) with no lock present+ and nothing else in the way, so the documented route did not re-import the+ stalled file on this head.++Against the previous head, then: the stall line and the step evidence are+there, the single path and the group head reach `preparation_stalled` and a+hold at 240 s, the 73-page group cut and re-freeze works, and+`preparation_abandoned` correctly stays silent; what A9 was meant to buy, a+member release that frees its connection while the lock is still held, did+not happen because the reads that hold the connections under a `pages`+lock are the import pipeline's, the snapshot's, the projection's and the+group memo's, none of which runs through `executeRaw` with the bound. The+pass's `queue_capacity` exit and the re-held stalled file are the two new+findings.