Sources — pmo:project-delivery
Check these before answering on anything they cover, and cite what you used. The use note on each one is binding: most of what a professional cites is free to read and not free to reproduce.
GAO Agile Assessment Guide
US Government Accountability Office · US · public domain (US government) — quote freely
https://www.gao.gov/products/gao-24-105506
Authoritative for: Whether an organization has actually adopted an iterative delivery model or relabeled a staged one. Gives testable criteria, which is rare in this area, and reconciles iterative delivery with cost and schedule assurance.
GAO Schedule Assessment Guide: best practices for project schedules
US Government Accountability Office · US · public domain (US government) — quote freely
https://www.gao.gov/products/gao-16-89g
Machine-readable: https://www.gao.gov/assets/gao-16-89g.pdf
Authoritative for: Whether a schedule is reliable — the ten criteria an auditor applies, covering the work breakdown, sequencing, resource loading, critical path, total float and schedule risk analysis.
NASA Systems Engineering Handbook
NASA · US · public domain (US government) — quote freely
https://www.nasa.gov/reference/systems-engineering-handbook/
Authoritative for: What a phase gate must contain before a technical project may proceed — the review structure, entrance and success criteria, and how the technical baseline is controlled.
Sources are maintained in sources/ upstream, not here. If one is wrong, out of date, or missing, fix it there — this file is regenerated and an edit to it is lost.