Skip to content

Herk Edit Kit by Nate Herk: edit videos, reels, and YouTube Shorts with Codex or Claude Code. 15 skills, transcript-driven cuts, storytelling, 406 motion-graphics cards, and HyperFrames templates.

5.9 KB
Raw Blame

Lesson 5.1 Demo — Storyboard

Topic: When and how to pitch an audit Duration: 1:52.79 (112.79 s, 25 fps → ~2,820 frames) Face-cam: Bottom-right PiP, 360×540 portrait crop (center vertical slice of the source), 32 px rounded corners, drop shadow + 1 px cyan rim. Stays in corner throughout — no fullscreen moments (maintains the "teacher + lesson materials" energy). Visual canvas: LEFT 2/3 of the 1920×1080 frame (roughly x=80..1440, y=80..960). The PNG backdrop already owns top-right (AIS logo) and bottom-center (@AI Automation Society watermark) — MG content avoids those zones. Brand: AIS DESIGN.md — navy bg, cyan #37bdf8 primary, orange #f09025 for the single contrast highlight per scene. Montserrat Bold for headlines, Roboto Mono for labels/stats, Montserrat Light for body.

Narrative arc

The video walks a consultant from the moment they notice more problems in a client's business → through the fear of bringing it up → to the framework (trust → audit, two paths) → and ends mid-way through the three-signals teaching. It's one coherent teaching beat cut off at the moment the first signal is revealed.

Section table

# t-start t-end Dur Beat Visual metaphor Key word anchors
01 0.00 19.00 19.00 s The moment you know — you're mid-project and see problems outside scope Lesson title card (cold open) → "THE PROJECT" box with dashed "REAL SCOPE" halo → 4 problem bubbles pop in around it → ends with a "???" hanging in the air 0.74 Lesson, 2.04 When and how, 5.46 project, 8.20 problems, 10.68 inefficiencies, 11.42 workflows, 14.80 single automation, 17.58 But you won't be sure how
02 19.00 30.82 11.82 s The cost of hesitation — you stay silent, finish and leave, it costs you "SCOPE CREEPER ❌ NOT YOU" pill → 3-step checklist reveal (FINISH · INVOICE · MOVE ON) → orange payoff "HESITATION COSTS YOU" 19.88 bigger engagement, 23.20 consultant, 24.70 expand the scope, 26.10 finish, 27.32 invoice, 28.30 move on, 29.44 hesitation, 30.10 costs
03 30.82 38.34 7.52 s Why this lesson exists — nobody showed you WHEN and HOW Two emphasized words slam in: WHEN and HOW as giant cyan type on a split stage 30.82 Not because, 32.60 WHEN, 35.10 HOW, 37.44 salesy
04 38.34 48.96 10.62 s The promise — by the end, you'll know WHEN / HOW / CHARGE "WHAT YOU'LL LEARN" title + 3-step numbered list (cyan pills: 01 WHEN, 02 HOW, 03 CHARGE?) 38.34 That's what this lesson is for, 42.00 when an audit, 43.00 how to pitch, 45.40 charge for it
05 48.96 69.64 20.68 s Audits are relationship expansion tools — they need trust; trust has two sources Section divider "WHEN AUDITS MAKE SENSE" → definition callout "AUDIT = RELATIONSHIP EXPANSION TOOL" → single word TRUST under spotlight → split into two cards (A: EARNED TRUST via past project, B: INHERITED TRUST via referral/network) 48.96 When audits, 51.56 relationship expansion, 54.40 trust already exists, 57.44 two places, 58.30 successful project, 64.32 a referral, 65.90 personal connection
06 69.64 83.74 14.10 s Cold prospect ≠ audit — they want the problem fixed, not a bigger engagement Email/chat bubble "Can you fix our reporting?" → crossed-out bad response "Let's step back and audit your operations" (big red X) → viewer watches prospect walk to next vendor 69.64 If neither, 72.30 premature, 73.80 cold prospect, 75.00 reporting problem, 79.60 let's step back, 82.00 someone else
07 83.74 94.88 11.14 s Two paths framework — cold lead builds trust via project; warm lead already has it Two-column diagram. LEFT COLD LEAD → PROJECT → TRUST → AUDIT (arrows stagger in). RIGHT WARM LEAD → AUDIT (direct, with pre-existing TRUST glow) 83.74 This maps, 85.00 two paths, 87.26 Cold leads, 88.50 project, 90.00 builds trust, 91.50 door to an audit, 92.40 Warm leads, 94.00 trust is already there
08 94.88 101.78 6.90 s It's about WHEN, not WHETHER — punchy ending to the framework Split-screen: LEFT WHETHER (grayed out, struck through) · RIGHT WHEN (huge cyan, pulse-in on the final word) 94.88 distinction matters, 97.00 how you enter, 99.80 not whether, 101.00 but when
09 101.78 112.79 11.01 s Three signals (teaser + signal 1) — video ends on signal 1 as a cliff "3 SIGNALS IT'S TIME" title with three placeholder dots → ambient hold → Signal 01 card reveals "SUCCESSFUL PROJECT DELIVERY · client has seen your work" — last frame leaves signals 02 & 03 as faint silhouettes (to be continued) 101.78 Three signals, 103.00 right moment, 106.80 first signal, 109.32 successful project delivery, 111.12 client has seen

Motion language (whole video)

  • Palette per section: #07121c bg (inherited from the PNG), #37bdf8 primary cyan, #f09025 orange reserved for the single hottest word / the cost / the warning per scene, #96a2b6 dim for meta labels.
  • At least 3 different eases per section (power3.out, expo.out, back.out(1.4), power4.out for entrances; sine.inOut for ambient drifts).
  • Every element enters via gsap.from() — no exit tweens (transitions handle handoff).
  • Transitions between sections: mostly a blur-crossfade (0.5 s, sine.inOut) or a push-slide-left (0.35 s, power2.inOut). Section 1 → 2 = blur. Section 7 → 8 = zoom-through for the punch. Sections 8 → 9 = push.
  • Ambient: subtle 3–6 % scale pulse on the face-cam wrapper driven by audio amplitude (keeps the talking head alive without pulling eyes from MG).

Build order

  1. This review loop: sections 01 + 02 built; draft rendered; Nate signs off on style.
  2. Post-signoff: build 03 → 09 in the same voice + transitions.
  3. Full-length draft render → frame-by-frame visual verification → standard-quality final render.