Herk Edit Kit by Nate Herk: edit videos, reels, and YouTube Shorts with Codex or Claude Code. 15 skills, transcript-driven cuts, storytelling, 406 motion-graphics cards, and HyperFrames templates.
Lesson 5.1 Demo — Storyboard
Topic: When and how to pitch an audit
Duration: 1:52.79 (112.79 s, 25 fps → ~2,820 frames)
Face-cam: Bottom-right PiP, 360×540 portrait crop (center vertical slice of the source), 32 px rounded corners, drop shadow + 1 px cyan rim. Stays in corner throughout — no fullscreen moments (maintains the "teacher + lesson materials" energy).
Visual canvas: LEFT 2/3 of the 1920×1080 frame (roughly x=80..1440, y=80..960). The PNG backdrop already owns top-right (AIS logo) and bottom-center (@AI Automation Society watermark) — MG content avoids those zones.
Brand: AIS DESIGN.md — navy bg, cyan #37bdf8 primary, orange #f09025 for the single contrast highlight per scene. Montserrat Bold for headlines, Roboto Mono for labels/stats, Montserrat Light for body.
Narrative arc
The video walks a consultant from the moment they notice more problems in a client's business → through the fear of bringing it up → to the framework (trust → audit, two paths) → and ends mid-way through the three-signals teaching. It's one coherent teaching beat cut off at the moment the first signal is revealed.
Section table
| # | t-start | t-end | Dur | Beat | Visual metaphor | Key word anchors |
|---|---|---|---|---|---|---|
| 01 | 0.00 | 19.00 | 19.00 s | The moment you know — you're mid-project and see problems outside scope | Lesson title card (cold open) → "THE PROJECT" box with dashed "REAL SCOPE" halo → 4 problem bubbles pop in around it → ends with a "???" hanging in the air | 0.74 Lesson, 2.04 When and how, 5.46 project, 8.20 problems, 10.68 inefficiencies, 11.42 workflows, 14.80 single automation, 17.58 But you won't be sure how |
| 02 | 19.00 | 30.82 | 11.82 s | The cost of hesitation — you stay silent, finish and leave, it costs you | "SCOPE CREEPER ❌ NOT YOU" pill → 3-step checklist reveal (FINISH · INVOICE · MOVE ON) → orange payoff "HESITATION COSTS YOU" | 19.88 bigger engagement, 23.20 consultant, 24.70 expand the scope, 26.10 finish, 27.32 invoice, 28.30 move on, 29.44 hesitation, 30.10 costs |
| 03 | 30.82 | 38.34 | 7.52 s | Why this lesson exists — nobody showed you WHEN and HOW | Two emphasized words slam in: WHEN and HOW as giant cyan type on a split stage | 30.82 Not because, 32.60 WHEN, 35.10 HOW, 37.44 salesy |
| 04 | 38.34 | 48.96 | 10.62 s | The promise — by the end, you'll know WHEN / HOW / CHARGE | "WHAT YOU'LL LEARN" title + 3-step numbered list (cyan pills: 01 WHEN, 02 HOW, 03 CHARGE?) | 38.34 That's what this lesson is for, 42.00 when an audit, 43.00 how to pitch, 45.40 charge for it |
| 05 | 48.96 | 69.64 | 20.68 s | Audits are relationship expansion tools — they need trust; trust has two sources | Section divider "WHEN AUDITS MAKE SENSE" → definition callout "AUDIT = RELATIONSHIP EXPANSION TOOL" → single word TRUST under spotlight → split into two cards (A: EARNED TRUST via past project, B: INHERITED TRUST via referral/network) | 48.96 When audits, 51.56 relationship expansion, 54.40 trust already exists, 57.44 two places, 58.30 successful project, 64.32 a referral, 65.90 personal connection |
| 06 | 69.64 | 83.74 | 14.10 s | Cold prospect ≠ audit — they want the problem fixed, not a bigger engagement | Email/chat bubble "Can you fix our reporting?" → crossed-out bad response "Let's step back and audit your operations" (big red X) → viewer watches prospect walk to next vendor | 69.64 If neither, 72.30 premature, 73.80 cold prospect, 75.00 reporting problem, 79.60 let's step back, 82.00 someone else |
| 07 | 83.74 | 94.88 | 11.14 s | Two paths framework — cold lead builds trust via project; warm lead already has it | Two-column diagram. LEFT COLD LEAD → PROJECT → TRUST → AUDIT (arrows stagger in). RIGHT WARM LEAD → AUDIT (direct, with pre-existing TRUST glow) | 83.74 This maps, 85.00 two paths, 87.26 Cold leads, 88.50 project, 90.00 builds trust, 91.50 door to an audit, 92.40 Warm leads, 94.00 trust is already there |
| 08 | 94.88 | 101.78 | 6.90 s | It's about WHEN, not WHETHER — punchy ending to the framework | Split-screen: LEFT WHETHER (grayed out, struck through) · RIGHT WHEN (huge cyan, pulse-in on the final word) |
94.88 distinction matters, 97.00 how you enter, 99.80 not whether, 101.00 but when |
| 09 | 101.78 | 112.79 | 11.01 s | Three signals (teaser + signal 1) — video ends on signal 1 as a cliff | "3 SIGNALS IT'S TIME" title with three placeholder dots → ambient hold → Signal 01 card reveals "SUCCESSFUL PROJECT DELIVERY · client has seen your work" — last frame leaves signals 02 & 03 as faint silhouettes (to be continued) | 101.78 Three signals, 103.00 right moment, 106.80 first signal, 109.32 successful project delivery, 111.12 client has seen |
Motion language (whole video)
- Palette per section:
#07121cbg (inherited from the PNG),#37bdf8primary cyan,#f09025orange reserved for the single hottest word / the cost / the warning per scene,#96a2b6dim for meta labels. - At least 3 different eases per section (
power3.out,expo.out,back.out(1.4),power4.outfor entrances;sine.inOutfor ambient drifts). - Every element enters via
gsap.from()— no exit tweens (transitions handle handoff). - Transitions between sections: mostly a
blur-crossfade(0.5 s,sine.inOut) or apush-slide-left(0.35 s,power2.inOut). Section 1 → 2 = blur. Section 7 → 8 = zoom-through for the punch. Sections 8 → 9 = push. - Ambient: subtle 3–6 % scale pulse on the face-cam wrapper driven by audio amplitude (keeps the talking head alive without pulling eyes from MG).
Build order
- This review loop: sections 01 + 02 built; draft rendered; Nate signs off on style.
- Post-signoff: build 03 → 09 in the same voice + transitions.
- Full-length draft render → frame-by-frame visual verification → standard-quality final render.