Skip to content

Home Information - Your home, your data, organized.

Python
5.3 KB
Raw Blame

allowed-tools: Bash, Read, TodoWrite, Grep, Glob description: Strategic planning and work breakdown for GitHub issues argument-hint: [issue-number]

Strategic planning and work breakdown for GitHub issue #$0:

Strategic Planning Process

Help plan the work described in GitHub issue #$0 to determine optimal breakdown strategy:

  1. Use TodoWrite to plan strategic analysis - Track planning phases

    • Read docs/CLAUDE.md for AI-specific guidance and project context
    • Follow development philosophy of well-factored solutions
  2. Read GitHub issue completely - Understand full scope and context:

    • Use gh issue view $0 to read issue description and all comments
    • Understand business requirements and user needs
    • Identify stated goals and success criteria
    • Note any existing discussion or proposed approaches
  3. Identify information gaps first - Look for clarification needs:

    • Ambiguous requirements or unclear specifications
    • Missing technical details or constraints
    • Undefined success criteria or acceptance criteria
    • Unclear dependencies on other systems or features
    • Questions about user experience or design intent
  4. Ask clarifying questions - Before proposing breakdown strategy:

    • What information is missing or unclear?
    • Are there unstated assumptions that need confirmation?
    • What are the priorities if scope needs to be reduced?
    • Are there specific technical constraints to consider?
    • What is the relationship to existing features or planned work?
  5. Analyze work complexity and scope - After clarification:

    • Assess overall complexity and effort required
    • Identify distinct functional areas or components
    • Understand dependencies between different parts
    • Evaluate technical risk and uncertainty levels
  6. Evaluate isolation potential - Key strategic question:

    • Can parts of this work deliver independent value?
    • Would partial implementation be useful even if later phases never happen?
    • Are there natural boundaries that could become separate issues?
    • What are the coupling points between different aspects?
  7. Determine breakdown strategy - Choose optimal approach:

    Multi-phase within single issue (when work is tightly coupled):

    • All phases contribute to same core feature
    • Later phases build directly on earlier ones
    • No independent value from partial completion
    • Example: Phase 1 (core functionality), Phase 2 (optimizations), Phase 3 (advanced features)

    Multi-issue breakdown (when work can stand independently):

    • Each issue delivers standalone value
    • Issues can be implemented in any order
    • Each issue useful even if others never completed
    • Example: Separate issues for different features that happen to be related

    Hybrid approach (when some parts independent, others coupled):

    • Combination of separate issues and multi-phase within issues
    • Independent features as separate issues
    • Related optimizations as phases within issues
  8. Generate strategic plan - Provide detailed breakdown:

    • Recommended approach with clear rationale
    • Specific phase or issue breakdown with descriptions
    • Dependencies and ordering recommendations
    • Effort estimates and risk assessment
    • Value delivery timeline and milestones
    • If multi-issue approach recommended, provide /createissue commands for each issue
  9. Post strategic plan to GitHub issue - Document planning analysis:

    • Use gh issue comment $0 to post the complete strategic plan
    • Include all key sections: complexity assessment, breakdown strategy, phase descriptions, timeline, risk assessment
    • Provide clear rationale for chosen approach
    • Document effort estimates and value delivery timeline
    • Create permanent record for team coordination and future reference
  10. Plan Outcome Execution Guidance - Direct next steps for implementation:

  • Use /design for issues requiring:
    • Visual mockups or wireframes for UI changes
    • UI interaction specifications and patterns
    • Design decision clarification before implementation
    • User experience flow definition
  • Use /execute for issues with:
    • Clear technical requirements and approach
    • Defined implementation path
    • No design ambiguity or visual decisions needed
    • Ready for immediate development
  • Use /investigate for issues needing:
    • Technical research or feasibility analysis
    • Codebase exploration and pattern discovery
    • Integration complexity assessment
    • Architecture decision investigation
  • Continue planning if:
    • Additional issue decomposition needed
    • Cross-issue dependencies require coordination
    • Strategic decisions still unclear

Strategic Planning Goals:

  • Optimize for independent value delivery
  • Minimize dependencies and coupling
  • Enable flexible prioritization and scheduling
  • Reduce risk through incremental approach
  • Ensure clear success criteria for each phase/issue

Planning Target: GitHub issue #$0 Output: Strategic work breakdown with implementation roadmap

Key Decision Criteria:

  • Can work stand in isolation regardless if following phases ever get done?
  • Is there natural separation between functional areas?
  • What delivers maximum value with minimum dependencies?

Begin strategic planning analysis now.