The design language that makes your AI harness better at design.
JavaScript
Sync generated provider output
github-actions[bot]205643cf7a64
diff --git a/.agents/skills/impeccable/reference/new-work.md b/.agents/skills/impeccable/reference/new-work.mdindex 24e02ab1c..430571d36 100644--- a/.agents/skills/impeccable/reference/new-work.md+++ b/.agents/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .agents/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .agents/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.claude/skills/impeccable/reference/new-work.md b/.claude/skills/impeccable/reference/new-work.mdindex 59f2e7e6c..8c5284643 100644--- a/.claude/skills/impeccable/reference/new-work.md+++ b/.claude/skills/impeccable/reference/new-work.md@@ -70,16 +70,20 @@ Your measured rendition prior: warm, bookish, family, and child-facing subjects## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .claude/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .claude/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.cursor/skills/impeccable/reference/new-work.md b/.cursor/skills/impeccable/reference/new-work.mdindex b41b6e180..4913fb013 100644--- a/.cursor/skills/impeccable/reference/new-work.md+++ b/.cursor/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .cursor/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .cursor/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.gemini/skills/impeccable/reference/new-work.md b/.gemini/skills/impeccable/reference/new-work.mdindex 3ea98dc1a..47d49d814 100644--- a/.gemini/skills/impeccable/reference/new-work.md+++ b/.gemini/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .gemini/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .gemini/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.github/skills/impeccable/reference/new-work.md b/.github/skills/impeccable/reference/new-work.mdindex a0f59b62e..05d44a581 100644--- a/.github/skills/impeccable/reference/new-work.md+++ b/.github/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .github/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .github/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.grok/skills/impeccable/reference/new-work.md b/.grok/skills/impeccable/reference/new-work.mdindex 040998482..cc7afc31a 100644--- a/.grok/skills/impeccable/reference/new-work.md+++ b/.grok/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .grok/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .grok/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.hermes/skills/impeccable/reference/new-work.md b/.hermes/skills/impeccable/reference/new-work.mdindex cadb89cd4..0e4d69a3d 100644--- a/.hermes/skills/impeccable/reference/new-work.md+++ b/.hermes/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .hermes/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .hermes/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.kiro/skills/impeccable/reference/new-work.md b/.kiro/skills/impeccable/reference/new-work.mdindex 0ce2c3140..a2e8d01a4 100644--- a/.kiro/skills/impeccable/reference/new-work.md+++ b/.kiro/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .kiro/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .kiro/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.opencode/skills/impeccable/reference/new-work.md b/.opencode/skills/impeccable/reference/new-work.mdindex a60557d9e..a99f2d018 100644--- a/.opencode/skills/impeccable/reference/new-work.md+++ b/.opencode/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .opencode/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .opencode/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.pi/skills/impeccable/reference/new-work.md b/.pi/skills/impeccable/reference/new-work.mdindex 6c08ebacd..91b7f3ad8 100644--- a/.pi/skills/impeccable/reference/new-work.md+++ b/.pi/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .pi/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .pi/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.qoder/skills/impeccable/reference/new-work.md b/.qoder/skills/impeccable/reference/new-work.mdindex 50d540163..527ac01f5 100644--- a/.qoder/skills/impeccable/reference/new-work.md+++ b/.qoder/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .qoder/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .qoder/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.rovodev/skills/impeccable/reference/new-work.md b/.rovodev/skills/impeccable/reference/new-work.mdindex 9e8e9436a..d4540378f 100644--- a/.rovodev/skills/impeccable/reference/new-work.md+++ b/.rovodev/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .rovodev/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .rovodev/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.trae-cn/skills/impeccable/reference/new-work.md b/.trae-cn/skills/impeccable/reference/new-work.mdindex 5cc62fae4..4adca89fe 100644--- a/.trae-cn/skills/impeccable/reference/new-work.md+++ b/.trae-cn/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .trae-cn/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .trae-cn/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.trae/skills/impeccable/reference/new-work.md b/.trae/skills/impeccable/reference/new-work.mdindex 4b0e1978f..53f5c2cd7 100644--- a/.trae/skills/impeccable/reference/new-work.md+++ b/.trae/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .trae/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .trae/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/.vibe/skills/impeccable/reference/new-work.md b/.vibe/skills/impeccable/reference/new-work.mdindex 11796656e..4201b7ef7 100644--- a/.vibe/skills/impeccable/reference/new-work.md+++ b/.vibe/skills/impeccable/reference/new-work.md@@ -68,16 +68,20 @@ Calibration: AI-generated interfaces cluster around a few looks regardless of su## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .vibe/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .vibe/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.diff --git a/plugin/skills/impeccable/reference/new-work.md b/plugin/skills/impeccable/reference/new-work.mdindex 59f2e7e6c..8c5284643 100644--- a/plugin/skills/impeccable/reference/new-work.md+++ b/plugin/skills/impeccable/reference/new-work.md@@ -70,16 +70,20 @@ Your measured rendition prior: warm, bookish, family, and child-facing subjects## 5. Record the decision-Before code, state the chosen direction as a contract in the artifact's opening comment, five short blocks, 150 words at most, in a form that survives the production build: an HTML comment in the emitted markup, never only a templating-frontmatter comment, placed as the first child of the document's body in the root layout, never inside a slotted or child component (some compilers, Astro among them, strip a slot's leading comment while keeping deeper ones). After the first production build, grep the built output for the seed key; a contract the build erased is a contract nobody can audit. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The comment tops the artifact you re-open on every edit, the one reminder that survives a long build: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.+Before code, record the chosen direction as a development-only contract under `## Direction contract` in the relevant surface brief. A direction contract is durable route or artifact strategy, so create or update the brief even when no other surface strategy needs persistence. Keep the contract to six short blocks and 150 words at most. THESIS: the one idea this surface owns and the category-default arrangement it refuses. OWN-WORLD: the palette and component language, specific enough to be recognizable with all content removed. STORY: what the visitor understands, believes, and does. FIRST VIEWPORT: the exact composition, what is where and at what scale, and where the primary action sits. FORM: the chosen form, its position on your ordered list, and the seed key the script printed. Close with one more line, FINISH: the run's exit condition, verbatim "unreviewed and undocumented is unfinished; this build ends with the finish review, the verdict, DESIGN.md, and every shipping raster carrying its provenance". The surface brief is the reminder later agents reload across edits and sessions: a page that looks complete with the FINISH line undischarged is not done, it is abandoned at the finish line. If a block reads like a mood, the direction is not decided yet; the finishing review audits the render against this contract.++Never copy the direction contract into implementation source or any browser-delivered artifact. This includes HTML or framework comments, hidden DOM, `<template>` elements, `data-*` attributes, rendered JSX or TSX output, serialized props or state, React Server Component payloads, client bundles, metadata or JSON-LD, accessibility-only text, and files served beside the artifact. A compiler or optimizer removing development metadata is not a safety boundary. Reviewers and documenters receive the contract from the surface brief.On a new or replacement world, DESIGN.md is written at finish, from the built world, by the shipped documenter (section 7); a rulebook written before the build gets defended against reality instead of describing it, and hands the design-system detector an unstable target. A new world shipped with no DESIGN.md is still an incomplete run. An ordinary extension does not rewrite DESIGN.md.-If the work establishes durable strategy for a route or artifact, read its existing surface brief, then update it:+Read the existing surface brief before updating it:`node .claude/skills/impeccable/scripts/surface-brief.mjs read <primary-target>``node .claude/skills/impeccable/scripts/surface-brief.mjs write <primary-target> <body-file> [related-target ...]`+After writing, read the brief once more and verify that all six contract blocks and the seed key are present before building.+Keep the brief small: scope and visitor mode; audience, job, action/task, proof/content, and constraints; chosen direction and memorable moment; unresolved decisions. Do not copy global product truth or DESIGN.md tokens into it.On a comp-led build, whenever any image generation is available (a harness-native tool or the API fallback context.mjs reports), the locked direction is visualized before it is built, never skipped: load [visualize.md](visualize.md) and follow it, three compositional options put before the user for approval, the chosen card's decision comp plus two variations. This step is proven to produce the most compositional and ambitious work. On a code-led build the comp round is skipped by contract, never by drift: the ambition it would have carried lives in the direction contract's FIRST VIEWPORT block and named signature interaction, and the finish reviewer audits those promises in behavior.