Build and revise procedural 3D assets with your coding agent. Local MCP server, CLI and TypeScript engine with rendered review, editable source and GLB export.
Troy rowing approach and landing join — 2026-10-04
The one-ship prototype now connects offshore rowing to the existing ordered landing, using the same 28 crew throughout. This extends the alternating gait checkpoint. It is a kinematic approach over the actual Troy terrain, not accepted buoyancy, equipment handling or a complete fleet implementation.
Preview and sequence
http://127.0.0.1:4420/?landing=1&arrival=1&view=shipApproach
The Rowing ship view covers the approach; Landing crew gives the closer
shore view. Existing replay, pause and time controls remain. Omitting arrival=1
keeps the previous already-grounded landing comparison.
- The ship moves 60 m toward its existing landing frame over 40 seconds.
- Crew row in synchrony, slowing their last recovery from 12–18 s and ending in the exact seated pose used by unloading. It then coasts without further strokes.
- A two-second settle finishes at the qualified landing height before the plank lowers from 42–48 s. All 28 remain seated during lowering.
- The existing queue follows, with all 28 ashore by 331.815 s. This is scene duration, not a performance audit or a final cadence decision.
Actor IDs, sheathed hip weapons, seats and authored ship size remain unchanged. The opt-in composition still has 502 ordinary soldiers, two heroes and 12 ships; the other 11 ships remain earlier placeholders. Default composition, project revision pins, core runtime and public deployment are unchanged.
Implementation
runtime-lab/src/triangle-heightfield.mjs accelerates queries against original
upward terrain triangles with their world transforms. The baker retains 241
contact samples along the approach, using the 3,871 hull samples from the existing
grounding check. It adds a small interpolation clearance and eases first contact;
the final settle removes that clearance at the established landing position.
It assumes the supplied terrain is a continuous heightfield; it is not a general
overhang or rigid-body solver.
src/ship-arrival.mjs owns the deterministic movement/stroke/settle/landing
timeline. web/arrival-crew.mjs gives each persistent actor a single pose owner,
switching from the contact-solved rowing rig to the existing unload controller.
The rendering parent moves the boat and seated crew together, while local contact
solving stays in the previously qualified landing frame. Reverse seeking restores
the correct equipment and actor state.
The staged consumer is scene/web/runtime/landing-v6/: 26 hash-checked files,
3,055,151 bytes. It uses runtime-lab/evidence/ship-arrival-01/profile.json plus
the unchanged travel-landing-05 queue. No GLB revision was authored for this step.
Experiments remain outside the core toolchain and installed authoring skills.
Evidence
All paths below are relative to the external troy-expansion workspace.
runtime-lab/evidence/ship-arrival-01/tests.tap: all 58 lab tests pass.scene/evidence/ship-arrival-01/scene-tests.tap: all 12 scene tests pass. New tests cover original-triangle height queries, timeline ordering, monotone approach, persistent crew identity, pose joins and reverse seeking.runtime-lab/evidence/ship-arrival-01/clearance.json: 673 times at 16 Hz, 2,605,183 hull-point and 1,356,768 oar-vertex/terrain samples. No recorded terrain penetration beyond numerical tolerance. Minimum oar/terrain separation is 1.5973 m; this is seabed/ground clearance, not water-surface stroke depth. Maximum grip error is 2.59e-15 m and foot-target error 5.56e-16 m. The accelerated height query agrees with 101 independent triangle raycasts within 1.78e-15 m.runtime-lab/evidence/ship-arrival-01/fleet-spacing.json: a conservative union of 49 sampled oar-pose bounds over 161 placements does not overlap the actual bounds of the other 11 ship assets. Minimum separating-axis gap is 7.8955 m. This is sampled-envelope evidence, not a general fleet navigation solution.scene/evidence/ship-arrival-01/{webgpu,webgl2}: 13 successful captures each, no page errors. Rowing, coasting, settling, seated lowering, complete arrival, reverse seeking and playback controls pass. At 12 s, instanced/hierarchy images differ by more than 10 channel levels in nine pixels per backend and none by more than 40. Close rowing/coasting views were inspected.
These checks do not establish continuous full-mesh collision freedom, realistic buoyancy/pitch, response to the scene's changing wave surface, or performance. No timed performance run was performed.
Next work and full-goal status
Close views expose the equipment work clearly: the long upright plank is an awkward underway stowage solution; it needs a compact, supported storage and deployment arrangement. The full sail still needs a believable landing state, and parked oars need securing/handling. Refine hull trim and water contact before calling the arrival visually finished. Keep the verified route/contact behavior while changing these assets and poses.
Then qualify fleet placements/rosters, bake the approved motion, select range and device representations with bounded combined-scene measurements, and finish armies/archery, Achilles/Hector/optional duel, city/environment, physical mobile review and owner-approved reproducible site delivery. The original full Troy goal remains active; this checkpoint does not narrow its scope or establish release acceptance.