Build and revise procedural 3D assets with your coding agent. Local MCP server, CLI and TypeScript engine with rendered review, editable source and GLB export.
Troy rendered-ground contacts and gate access, 5 October 2026
The scene now queries its original indexed sand triangles for paired and playable hero foot support. The earlier analytic height function describes terrain construction but differs from the visible triangles: up to 6.4 cm along the proposed gate/courtyard route and 9 cm farther up the city slope. No terrain vertices, saved asset geometry, bank data or input revisions changed. The grid queries preserve the actual cell diagonals and upward face normals; independent original-triangle comparisons cover boundaries and city slopes.
Troy's original door_left and door_right hinges now open outward and close through a scene-owned controller. Rendering retains all seven existing one-instance gate batches. Closed matrices match the original placement exactly at GPU float precision; saved source transforms remain unchanged. The Gate entrance view offers Open gate and Close gate. The controller updates instance bounds during motion and releases its transform source and UI through the scene resource scope.
Focused red-first terrain/gate checks reproduced the absent implementation. All 189 scene tests now pass. Original closed gate triangles intersect conservative swept boxes from both actual posed heroes; fully open triangles clear those boxes, including equipment and a 5 cm margin. Sampled sole checks cover the complete paired sequence and 12,001 city-walking poses for each hero. This is prerequisite contact/access evidence, not a live exploration controller or continuous collision guarantee. Moving/occupied door clearance, closed-door collision, input ownership and rendered follow-camera passage remain unqualified.
The current 509-file stage-10 snapshot passes exact local and hub source checks. Local WebGPU and WebGL2 show the gate opening; WebGPU closing also restores it. WebGL2's legacy terrain branch reaches readiness and opens the gate. Saved screenshots, DOM observations and zero-error/warning logs are retained in scene/evidence/city-ground-gate-01. The observed source files served at 4420 match the local snapshot. Owner appearance acceptance remains open.
Completed performance matrix and source scope
Stage-09 current-workload-04 completed 52 natural twenty-second windows,1,040 measured seconds, with no browser errors/warnings and successful source/dependency/cleanup checks. City/courtyard means are 12.4–12.6 ms on WebGPU and 13.6–13.8 ms on WebGL2. Early unloading means are 18.9–19.1 ms and 19.8–20.0 ms respectively; hero-combat windows average 20.8–20.9 ms and 22.0–22.1 ms. Endpoint/clock evidence is retained; an ended fight is not uninterrupted active combat. Later unloading remains 25.0–26.7 ms. The first WebGPU later-wave handoff still stalls 3007.9 ms; WebGL2 handoff peaks 50 ms. The scope is the quiet NVIDIA hub at 1440x900 balanced water, not GPU execution time, physical mobile or final 60 FPS acceptance.
That completed matrix predates the new triangle contact and gate controller. Stage-10 current-workload-05 WebGPU is now dispatched on the hub; its terminal result has not been collected and WebGL2 is pending. Expensive startup-pass candidates remain opt-in. No new-source performance acceptance is inferred from stage-09.
Required continuation
Implement free on-foot exploration as either hero from beach/formations through the gate and into the courtyard/city, with real obstacle contacts, safe gate occupancy, camera obstruction handling and clean ownership handoff to/from the arena and paired duel. Qualify the actual rendered journey, turns/stop/reverse/input and role selection, rather than replacing it with camera waypoints or teleports. Collect the existing stage-10 performance job before dispatching its WebGL2 companion. Continue first-use/shadow/fallback/device/playfeel work, unrelated derivative workflows and packaged skills, reproducible asset/source delivery, site integration and owner acceptance. This computer owns development; the hub runs isolated measurements. The full goal remains active; no commit, push, publication or deployment occurred.