Skip to content

A toolbox of film styles made in code for Claude Code: 66 ready to use, and your own. Each style is a style prompt plus a demo film made entirely in code by Claude Opus 5.5, with no video model. By Lemomo. · 一套用代码做片的风格工具箱:66 种现成风格,也能做出你自己的

5.7 KB
Raw Blame

Facts on screen and in the voice

Every number or name the film prints or says, where it comes from and the source's own words; what could not be sourced says how it was worked out. The voice text is voice/lines.json (Chinese) and data/subs_en.json (English, also spoken in the English version).

Sources

  • [S1] Baihetan Dam, Wikipedia — https://en.wikipedia.org/wiki/Baihetan_Dam — "equipped with 16 hydro-generating units each having a capacity of 1 gigawatt"; "All hydro-generating units of the Baihetan hydropower station became fully operational on 20 December 2022."
  • [S2] The Paper (澎湃新闻) — https://www.thepaper.cn/newsDetail_forward_21364518 — "其中,左岸、右岸各建设8台百万千瓦级机组,分别送电江苏、浙江。"
  • [S3] IT之家, Baihetan–Jiangsu line in service — https://www.ithome.com/0/627/417.htm — "白鹤滩-江苏工程起于四川省凉山州布拖县,止于江苏省苏州常熟市,途经四川、重庆、湖北、安徽、江苏 5 省(直辖市),线路全长 2080 公里,新建白鹤滩、虞城 2 座换流站。" "工程额定电压 ±800 千伏、额定输送容量 800 万千瓦……2022 年 7 月竣工投产。"
  • [S4] China News Service (中国新闻网), 2022-06-20 — https://www.chinanews.com.cn/gn/2022/06-20/9783791.shtml — "以白江线为例,起于四川凉山布拖换流站,止于江苏常熟虞城换流站。" On UHV transmission: "输电距离远、输送容量大、运行损耗低……特高压让“电从远方来”成为现实".
  • [S5] Structural study of ±800 kV valve halls (steel-framed buildings housing the converter valves) — https://aminer.org/pub/53e9a42bb7602d9702d47000/structure-form-selection-of-the-valve-hall-and-control-building-of-kv
  • [S6] GB/T 156, 标准电压 (Chinese national standard voltages): household supply 220 V, 50 Hz.

On screen

Printed Claim Source / how
白鹤滩 / BAIHETAN (small, texture), 16 generator pads G1–G16 Baihetan has 16 units of 1 GW [S1]
G1–G8 run to the Jiangsu line; G9–G16 leave through connector J2 eight units on each bank; one bank sends to Jiangsu, the other to Zhejiang [S2]. The picture never prints 左岸/右岸
换流站 / CONVERTER STATION (both ends) converter stations at Butuo and at Yucheng, Changshu [S3], [S4]. The sending station is also reported as 白鹤滩换流站; it stands in Butuo county, and the film names neither
四川 / SICHUAN, 江苏 / JIANGSU, 2,080 公里 / 2,080 km the line runs 2,080 km from Sichuan to Jiangsu [S3]
7 毫秒 / 7 ms worked out: 2,080 km ÷ 299,792 km/s ≈ 6.94 ms. On an overhead line the wave travels a little slower than light in vacuum, so the voice says "only" and the figure is rounded to 7. What crosses in 7 ms is the electromagnetic signal, not the electrons, which drift far more slowly arithmetic
test pads every 500 km (small "500 km" texture) placed at 500/2080, 1000/2080, 1500/2080 of the drawn route's length; the route itself is schematic arithmetic
220 V ~ 50 Hz (small, on the socket) household supply in mainland China [S6]
充电器 / CHARGER, USB-C · 20 W (small) a fictional 20 W phone charger; its layout is invented. The chain plug → fuse → bridge rectifier → bulk capacitor → flyback transformer → output is the common one for small chargers —
整流桥 / BRIDGE RECTIFIER, 交流 → 直流 / AC → DC, 同一个电路原理 / THE SAME CIRCUIT both ends are drawn with the bridge-rectifier symbol meaning "AC becomes DC" (the inverter is its mirror). Simplification: a real ±800 kV converter uses 12-pulse thyristor valve groups, not four diodes; the principle (bridge rectification) is the same stated as a principle
功率差 4 亿倍 / 400 MILLION × THE POWER 8,000 MW (the line's rated capacity) ÷ 20 W (the film's charger) = 4 × 10⁸ [S3] + arithmetic

Drawn but not labelled (texture, not claims): the Yangtze with the Jinsha, Jialing, Wu, Han, Xiang and Gan rivers; Dongting, Poyang, Chaohu and Taihu lakes; the east coast; real cities as round test points with pinyin tags; three more ±800 kV lines of the west-to-east corridor (to Suzhou, Shanghai and Jinhua), never lit. All routes are schematic (octilinear), not survey-accurate. No provincial or national borders are drawn; the board shows only the Yangtze corridor.

In the voice

Line Claim Source / how
四川深山里发出来的电 the Jiangsu line starts at Butuo, Liangshan, Sichuan, fed by Baihetan in the mountains on the Sichuan–Yunnan border [S3], [S4]
仅仅七毫秒 / 全程只要七毫秒 ≈ 6.9 ms arithmetic (above)
两千公里外 / 两千多公里长 2,080 km [S3]
如果直接送去太远的地方,在路上就会白白损耗掉很多 long distance is why UHV DC is used, and low running loss is one of its stated advantages; the voice says it without a figure [S4]
电得先进一趟换流站,变成只朝一个方向跑的直流电 / 到了终点站,它会被重新变回交流电 converter stations at both ends [S3]
再把电压一级一级降下来,最终送进你家墙上的插座里 stepped down through the grid to 220 V at the socket [S6]; the steps are not numbered
换流站里那个几层楼高的大家伙 a spoken description, not a measured figure: the converter valves hang in a valve hall, a steel-framed building [S5] tens of metres tall; no official height for this station was found, so no number is said or printed colloquial
用的是同一个电路原理 both rectify with a bridge (simplification above) —
是这个小充电头的整整四亿倍 8,000 MW ÷ 20 W = 4 × 10⁸ [S3] + arithmetic