Skip to content

armgit / moss

Public Imported from GitHub
0

MOSS: a small, mostly 3D-printed litter-picking rover. Cleaner streets, one maker at a time.

Python

media: first drive video and still (22 September)

metroxd7534fc4f719
diff --git a/README.md b/README.md
index cd54d62..df1a49d 100644
--- a/README.md
+++ b/README.md
@@ -16,7 +16,7 @@ MOSS is a small litter-picking rover you can print and build yourself: a tracked
All 113 printed parts are on the bench, with the shafts, bearings and screws to go with them. On 20 September the two drive motors ran for the first time, encoders counting, from the ESP32 that will drive them on the rover. By the evening the electronics were inside the chassis and the Jetson was booting from the battery. Some parts ended up elsewhere than the CAD planned; that is what a first prototype is for. On 22 September it rolled for the first time. The tracks still have some slack, a second tensioner per track is next.
-![Electronics in the chassis, Jetson on battery, 20 September](media/images/build_first_assembly_20260920.jpg)
+![First drive, 22 September](media/images/build_first_drive_20260922.jpg)
Every step is written down when it is real, good or bad. The [build log](docs/build_log.md) has the dates and the numbers, the [assembly feedback](docs/assembly_feedback.md) has what did not fit, the [roadmap](docs/roadmap.md) has what comes next, without dates.
diff --git a/docs/build_log.md b/docs/build_log.md
index 89e1a30..3144038 100644
--- a/docs/build_log.md
+++ b/docs/build_log.md
@@ -97,7 +97,9 @@ The [new itemized budget](bom-costs.md) is $820 with Mighty or $821 with ST, com
## 2026-09-22 — first drive
-MOSS rolled for the first time today: tracks on, drivetrain assembled, the rover moving on the floor under its own motors. Posted on X at 23:01 with a 10-second clip.
+![First drive, 22 September](../media/images/build_first_drive_20260922.jpg)
+
+MOSS rolled for the first time today: tracks on, drivetrain assembled, the rover moving and turning on the floor under its own motors, still tethered for control. Video: [MOSS_first_drive_20260922.mp4](../media/video/MOSS_first_drive_20260922.mp4) (18 s).
What the first metres taught: the single-sided track adjustment leaves the tension uneven, so there is still some slack. Next hardware step: a second tensioner on each track. This is logged in [assembly_feedback.md](assembly_feedback.md). No autonomous behaviour yet; this is a drive test.
diff --git a/media/images/build_first_drive_20260922.jpg b/media/images/build_first_drive_20260922.jpg
new file mode 100644
index 0000000..bd74d14
Binary files /dev/null and b/media/images/build_first_drive_20260922.jpg differ
diff --git a/media/video/MOSS_first_drive_20260922.mp4 b/media/video/MOSS_first_drive_20260922.mp4
new file mode 100644
index 0000000..82e53b3
Binary files /dev/null and b/media/video/MOSS_first_drive_20260922.mp4 differ