Skip to content

Plan, apply and roll back changes to a production ontology, with a blast radius report and a proof an auditor can re-check.

heritage-aerial: probe transcript items 25-27 (STAC interval fix, NAPL both-ways sortie validation, footprint geodesy verification)

FABIOTESS80589755de93
diff --git a/case-studies/heritage-aerial/docs/discovery-surface-probes-2026-09-02.md b/case-studies/heritage-aerial/docs/discovery-surface-probes-2026-09-02.md
index 830327e6..a29b6325 100644
--- a/case-studies/heritage-aerial/docs/discovery-surface-probes-2026-09-02.md
+++ b/case-studies/heritage-aerial/docs/discovery-surface-probes-2026-09-02.md
@@ -114,3 +114,14 @@ paper.
Result: 75 frames, 4 sorties (PEGASUS-RN-H-0007/0008/0009/0012), dates
1924-11-12 to 1924-11-13. Timings over three runs: 42 ms cold, 12 ms
warm (curl time_total against localhost:3030/ds/sparql).
+25. STAC export corrected to honour declared date precision (2 Sep 2026):
+ year- and month-precision frames now serialise with datetime null plus
+ start_datetime/end_datetime interval bounds. Regenerated: 292 items, 0
+ skipped, 67 interval items; catalog and all 292 items valid against the
+ official STAC 1.0.0 schemas (stac-validator).
+26. NAPL both-ways sortie validation (pyshacl): with the synthesised sortie
+ aggregate, 40 records conform; with all partOfSortie triples removed,
+ exactly 40 violations, every one on the sortie constraint.
+27. WHAIFinder footprint construction verified in code: metres-to-degrees in
+ a local equirectangular frame, longitude step divided by cos(latitude)
+ (whaifinder_arcgis.py reconstruct_footprint).