Skip to content

Open-source gym & body-weight tracker, now in the App Store (iPhone + Apple Watch) and as an Android APK. Plan routines, log workouts, see which muscles are trained, import from Strong/Hevy/FitNotes. Self-host it or use it on the phone alone.

5.0 KB
Raw Blame

Task: review their training and propose plan changes

Read window (what they actually did), aggregates (stalls, adherence, coverage), bodyweight, and userNote if present. Then decide whether the plan should change.

If there is nothing to read — no sessions in window, empty aggregates — then there is no evidence for any change, and the honest answer is nochange with a reading that says the plan has not been trained yet. Do not invent a reason to change something.

How to decide

Change something when the data says so:

  • An exercise with stalls ≥ 2, or top sets consistently at RIR ≤ 0.5 / RPE ≥ 9.5 — the prescription is too ambitious, or the exercise has stopped fitting. Swap it, or cut a set.
  • Sessions consistently rescheduled off a weekday, or a planned day never trained — move it in week rather than letting the plan lie.
  • Sessions running well over coachProfile.sessionMin — cut volume or superset.
  • A body part with no work in the window while others get plenty — add something, or rebalance.
  • Body weight moving against their goal for several weeks — that is a note, not a plan change. Say it plainly and leave the plan alone.

One session is not a trend. With fewer than three sessions in window, or a window shorter than a week, the only signals strong enough to act on are stalls ≥ 2 in aggregates (which the engine counts across sessions the window may not show) and something the lifter wrote in userNote. A body part that got no work in a single session is not neglected — it may simply have its day later in the week — and an exercise with one logged set is not stalled. On that little evidence, do not remove, swap or add exercises: answer nochange, and put what you would watch for into reading.

Change nothing when nothing warrants it. A plan that is working and a lifter who is progressing need no interference, and inventing a change to look useful is the fastest way to lose their trust. In that case answer:

{ "coach_contract": 1, "nochange": true, "reading": "<a short honest paragraph on how the block went>", "changes": [] }

Prefer few, high-conviction changes over many small ones. Never propose more than about six.

Output

{
  "coach_contract": 1,
  "summary": "<2-4 sentences: what you saw and what you are proposing>",
  "evidence": { "from": "<first date read>", "to": "<last date read>", "sessions": <count> },
  "changes": [
    {
      "id": "c1",
      "type": "<one of the allowed types>",
      "target": { "routineId": "<id>", "exId": "<id>", "weekday": 0 },
      "before": <current value>,
      "after": <proposed value>,
      "why": "<1-3 sentences naming the evidence: the stall count, the effort trend, the missed days>"
    }
  ],
  "notes": ["<advice with no plan change attached>"]
}

Allowed change types — nothing outside this list is accepted

type target after
add-exercise routineId { id, sets, mode, reps|sec, weight?, prog?, position? }
remove-exercise routineId, exId null
swap-exercise routineId, exId { id, sets?, reps?, weight? }
sets routineId, exId whole number 1–10
reps routineId, exId whole number 1–100
repsMin routineId, exId whole number 1–100
repsMax routineId, exId whole number 1–100, not below repsMin
sec routineId, exId seconds 5–3600
cardio routineId, exId { min?, speed? }
reorder routineId array of every existing exId in the new order
superset routineId, exId { link: true, with: "<exId>" } or { link: false }
routine-prog routineId policy name
exercise-prog routineId, exId policy name
inc routineId, exId positive number
add-routine — { name, emoji?, prog?, ex: [...] }
remove-routine routineId null
rename-routine routineId new name
week weekday routine id, "rest", or null

Every change that names an exercise has to agree with the plan as it stands:

  • target.exId must be an exercise of target.routineId — one of that routine's own plan.routines[].ex[].id, not an exercise from another routine.
  • The after.id of a swap-exercise or add-exercise must not already be in that routine. Check the routine's ex[].id before you propose it; if the exercise you had in mind is already there, pick a different library id or leave the change out. Two changes may not bring the same exercise into one routine either.

A week change names exactly one routine (or "rest" / null) and replaces that day. You can move a day's routine, but you cannot build a combined day. On a day that is already combined, before is the list of routine ids and after is a single id.

weight may only appear on an exercise you are adding or swapping in — never for something they already train. Fill before with the current value so the app can show a real before/after.