Super Tab integration suite in PR CI — plan
Way of working: the project's Engineer flow (plan first, then each task test first; one review on the pull request).
Goal: PR CI runs the backend's Super Tab integration suite (npm run test:super-tabs,
backend/vitest.super-tabs.config.ts, backend/integration/) on every pull request that changes backend code, in at most
four parallel Linux shards, in under 15 minutes, gated by ci/required. Engineers stop running the 60–90 minute suite
locally behind a per-Mac lock.
Architecture: One new matrix job, backend-integration (shards 1–4), in .github/workflows/ci.yml. The planner
(scripts/ci-plan.py) adds it to the backend suite's jobs, so it runs exactly when backend-desk runs (a change under
backend/ or one of the backend's declared cross-reads) and ci/required requires it. Files are split across shards
by recorded per-file durations (longest first onto the least-loaded shard), the same method the CLI's
vitest.ci.config.ts uses, in a backend copy (backend/integration/ciSequencer.ts, backend/integration/ci-durations.json,
backend/vitest.super-tabs.ci.config.ts): the backend may not import CLI code.
Tech Stack: GitHub Actions, Python planner + unittest, Vitest 4 custom sequencer, mongodb-memory-server-core.
Spec: task #2459 (Dee, 2026-11-03).
Global Constraints
- At most 4 shards (account limit: 20 concurrent jobs). Non-backend PRs run nothing new.
- MongoDB: every integration file already starts its own replica set through
mongodb-memory-server-core(7.0.24), so each shard has its own databases. A MongoDB service container would be a second, unused server; instead the job caches the downloadedmongodbinary ($TMPDIR/harness-super-tab-mongodb-binaries). Redis: the suite's setup (src/lib/noRedis.test-support.ts) keeps every Redis client unconnected andcacheOn.test-support.tsuses in-memory stamps, so no file reads Redis; no Redis service is added (it would never be used). Recorded deviation from the brief's "MongoDB and Redis as services", with this reason. - No database change. No change to the local
test:super-tabsbehavior. - Timing-dependent tests the job exposes get a deterministic fix, or a recorded reason in the test.
Review Focus
- The planner change:
backend-integrationis required wheneverbackendis planned, never on other PRs, and update merges no longer reuse a backend result when main changedbackend/integration/(it is now read by PR CI). - Sharding: every file in the config's
includeruns exactly once across the four shards. - Wall time under 15 minutes per shard, measured in CI.
Tasks
1. Planner: the backend suite includes the integration job
Files: scripts/ci-plan.py, scripts/tests/test_ci_plan.py.
Interfaces: JOBS["backend"] == {"backend-desk", "backend-integration"}; NOT_READ has no backend entry.
- Failing test: a backend-only PR requires
backend-integration; a docs-only and a desktop-only PR do not; a main commit underbackend/integration/reruns (no longer reuses) the backend suite. - Run
python3 -m unittest scripts/tests/test_ci_plan.pyand watch it fail. - Change
JOBSandNOT_READ; declare any cross-read the scan finds inbackend/integration/. - Tests pass.
2. Duration-based shards
Files: backend/integration/ciSequencer.ts, backend/integration/ciSequencer.test.ts,
backend/integration/ci-durations.json, backend/vitest.super-tabs.ci.config.ts.
- Failing test:
durationShardsputs every file in exactly one of N shards, longest first onto the least-loaded shard; unknown files get the default cost; invalid hints are refused. - Implement; the CI config merges
vitest.super-tabs.config.tswith the sequencer.
3. The CI job
Files: .github/workflows/ci.yml.
-
backend-integrationmatrix (shard 1–4),needs: plan,ifready and backend, Node 22.23.2,npm ci, cachedmongod,npx vitest run --config vitest.super-tabs.ci.config.ts --shard=N/4with a JSON report uploaded per shard;timeout-minutes: 20; listed inci/required'sneeds. - actionlint passes (the plan job runs it).
4. Measure and stabilize
- First ready run: per-shard wall time; the sum of per-file durations is the one-job time (the "before").
- Record the durations into
ci-durations.json; rebalance if a shard is over 15 minutes. - Fix or record each timing-dependent test that fails on CI runners.
- Red run: a throwaway commit breaking a store command turns
ci/requiredred throughbackend-integration; then drop it.
5. Docs
Files: docs/validation-and-release.md.
- PR CI table:
backend/runsbackend-deskandbackend-integration(four shards); how to reproduce a shard locally; the local full-suite rule is now covered by CI.