The ultimate harness for coding agents and beyond. All your agents. All your machines. One command center. Start with code, then follow your curiosity and build across disciplines: CAD, circuits, robots, games and music.
Desktop test shards by measured time Implementation Plan
For agentic workers: implemented the project's way (project instructions, Engineer): task by task, each failing test committed before the code that passes it; one review on the pull request.
Goal: Every Desktop CI shard finishes with at least 25% of its 10-minute limit left, and a shard that runs out of time names the files it did not reach.
Architecture: scripts/test-desktop.py splits the VM test inventory by measured per-file durations kept in
scripts/desktop-test-durations.json (longest first, each file to the least-loaded shard; unknown files get the median),
instead of round-robin by name. Equal durations give the old round-robin split, so the shard verifier and its tests keep
working. CI runs 5 shards instead of 4. scripts/desktop-test-durations.py refreshes the durations file from CI runs'
shard artifacts. A timed-out attempt lists the files it did not finish, in the log, as a GitHub error annotation and in
the receipt.
Tech Stack: Python 3 (stdlib), GitHub Actions.
Spec: Task #3458's brief (River, 11-05): shard 3 hit its 10-minute limit three times on 11-05 with tests passing.
Global Constraints
- PR body first line: "Requested by Ken through Harness."
- CI workflow and test scripts only, no app code. Owns
.github/workflows/,desktop/tool/,scripts/. - Headroom: a shard's estimated time (its files' summed durations / 4 workers + startup) at most 75% of 600 s.
- Job names stay
desktop-tests (ubuntu-22.04, N); adding shard 5 adds a job main's merge helper accepts (#2817).
Review Focus
- A new test file with no measured duration: gets the median, never all piled on one shard.
- The durations file missing or unreadable: falls back to equal weights (round-robin), never fails the run.
- Every file in exactly one shard, the same split on every shard's runner (deterministic on inventory + durations).
- A timed-out run whose last file was mid-way: that file is named as not finished.
- The suite outgrowing 5 shards: a test fails before CI does.
Task 1: Split by measured durations
Files: scripts/test-desktop.py (partition, durations), scripts/desktop-test-durations.json,
scripts/tests/test_desktop_tests.py.
- Failing tests: weighted split balances heavy files; unknown files get the median; equal weights keep round-robin; the committed durations + current inventory leave every one of 5 shards at most 75% of 600 s.
- Code; tests pass; commit.
Task 2: Name the files a timed-out shard did not reach
Files: scripts/test-desktop.py, scripts/tests/desktop_vm_fixture.py (a "partial" scenario),
scripts/tests/test_desktop_tests.py.
- Failing test: a run that times out after the first file names the second, in stdout and
unreached_files. - Code; tests pass; commit.
Task 3: Refresh tool and 5 shards in CI
Files: scripts/desktop-test-durations.py, .github/workflows/ci.yml, tests.
- Failing test: the refresh tool computes per-file durations from a shard log and averages runs.
- Code; CI matrix to 5 shards; three green runs with per-shard times in the PR.