An agent's ask reaches the person through their Buddy: implementation plan

Written by the project's Engineer way of working (project instructions, Engineer): plan first, then each task test first, the failing test committed before its code. No Execution Handoff.

Goal: In a switched project, an agent that needs a person's answer asks them directly: the question reaches their default Buddy and their Needs you list, with a default and a time, and never goes through the PM; past the time the default applies, unless the ask says the person must agree (task #3826, requested by Dee through Harness; spec docs/plans/2026-11-06-buddy-board-final-spec.md, "When an agent needs a person"). Projects not switched are unchanged.

Depends on: #3818 (several Buddies: defaultBuddyChat) and #3819 (the project switch, SwarmProject.boardMode). Code starts once both are on main; this plan is the draft's first commit.

Architecture: Today an agent's ask of a person (a work.status needs_human with an ask, or a decision.ask) goes to the PM as a crew need (crewNeeds.ts routesToPm), "people talk only to the PM". The path that asks the person already exists beside it: askDecisions opens a decision for them (decisions.ts), with an optional defaultAt that the sweep applies when due (store.ts leaveOverdueDecisions, dueDefaultDecisions). In a project with boardMode (boardRights.ts switched):

  1. Both asks take the direct path: no crew need, and a needs_human status row with a direct ask reaches no PM; the task's askedOf mark (already kept) is what the PM sees.
  2. Each question must carry defaultAt (refused with what is missing otherwise), and may carry mustAgree: true.
  3. Each question is posted in the person's default Buddy chat (defaultBuddyChat), addressed to their default Buddy (defaultBuddy), source kind decision-asked, marked with its project; the decision is in their Needs you list (the person's open decisions). The Buddy cannot answer for them (answerable takes the person only): it brings it to them.
  4. At defaultAt the sweep answers with the recommendation, as today. A mustAgree decision is not answered: the PM is told once in the decision's conversation (source decision-must-agree, its alone), and its defaultAt is cleared in the same write so the due range never reads it again; the 24-hour legacy sweep skips mustAgree rows, so it waits for the person until answered or withdrawn with its work.

Tech Stack: TypeScript backend, vitest.

Global Constraints

  • Projects without boardMode behave exactly as today: crew need to the PM.
  • The server enforces it: the person answers their own decision; their Buddy answers within its existing rights.
  • Swarm code stays out of cli/src/core.

Design

  • growth: decisions are already capped per person (MAX_OPEN_DECISIONS) and expire as today; one Buddy-chat line per question; one optional mustAgree field per decision row, deleted with the row.
  • concurrency: the ask is the task's own status write; the default applies in the overdue sweep's conditional write, which a person's answer in the same second wins, as today.
  • read cost: none new; both sweep reads keep their indexes (decision_waiting_default, decision_waiting_created), with mustAgree a residual filter on the legacy one only.
  • scale: 10x asks is 10x decisions, bounded per person by the cap; the first warning is people's open decisions at the cap.
  • compatibility: mustAgree extends the ask's contract (optional); an older CLI sends an ask without defaultAt and is refused in a switched project with what to add; older apps read the decision and the Buddy-chat line as today.
  • migration + rollback: none (an optional field); rollback routes asks to the PM again, and a mustAgree row with its defaultAt cleared then falls to the legacy 24-hour sweep.
  • audience: the decision is the person's own; the Buddy chat is read by them and their Buddy only.
  • identity: the agent asks as itself; the answer is the person's; the Buddy brings the question but cannot answer it for them.
  • failure: an ask refused says why; a must-agree decision past its time tells the PM once.
  • platforms: backend.

Review Focus

  • A project not switched routes exactly as before.
  • No path lets the default apply to a must-agree decision.

Task 1: in a switched project an ask goes to the person, through their default Buddy

Files: backend/src/superTabs/{commands.ts, decisions.ts, model.ts}, backend/src/superTabs/asksThroughBuddy.test.ts

Interfaces: askedThroughBuddy(state, group, drafts, author): the Buddy-chat lines for drafts in a switched project (decisions.ts); checkSwitchedAsk(question): refuses a question with no defaultAt.

  • Test: in a switched project, an agent's needs_human ask and its decision.ask each open a decision for the person with its default and time, post the question in their default Buddy's chat addressed to that Buddy, send nothing to the PM, and keep askedOf; without defaultAt each is refused; in a project not switched both are the PM's crew needs, as today.
  • Watch it fail; commit. Code; watch it pass; commit.

Task 2: the default applies at its time, unless the person must agree

Files: backend/prisma/schema.prisma, backend/src/superTabs/{decisions.ts, overdueDecisions.ts, commands.ts, store.ts, model.ts}, backend/integration/overdueDecisions.test.ts

  • Test: past its time the default answers a switched project's decision and the agent hears it; a mustAgree one stays open, the PM is told once, the next pass and the 24-hour sweep take nothing, and the person can still answer.
  • Watch it fail; commit. Code; watch it pass; commit.

Follow-up after merging prerequisites

  • Resolve the single imports conflict with main, retaining both task imports.
  • Test first: an identical decision.ask sends one Buddy notice; a changed mustAgree is a distinct decision; required agreement never advertises a default or PM takeover. Red: one unit failure and four integration failures.
  • Resolve decision deduplication before writing/numbering Buddy notices, using the existing indexed read once; include mustAgree in repeat identity and describe required agreement truthfully. Green: 623 focused unit tests and 23 decision sweep/persistence integration tests; typecheck clean.