Dormant Step Idle Reporting Implementation Plan
Implement natively, task by task, with tests committed and observed failing before production code, followed by one independent PR review.
Goal: Let a finished step's agent reach routine idle handling after its done task becomes dormant and drops out of loaded state.
Architecture: Change only checksOpenWork's idle decision to require a loaded, unfinished parent. Keep taskEnded fail-closed for archival and review closing. All open tasks are loaded; dormant finished tasks can be absent.
Tech Stack: TypeScript, Vitest, existing Super Tab state model.
Spec: Swarm task #3729, conversation 4a7374c7ebf53a5ea5692d79 (Diego's 11-06 report).
Global Constraints
- The archive pass never takes a step whose task is open.
- The Engineer's own idle reporting is unchanged.
- Preserve routine idle decisions: role-configured Reviewers/Testers are kept; other non-crew idle agents receive host-confirmed stop and an informational row.
- No schema, query, index, dependency or client changes.
Review Focus
- Dormant finished parent absent after 25 hours: its finished step must not hold its agent busy.
- Loaded done or cancelled parent: same idle outcome as the absent-parent case.
- Loaded open parent: keep the step-only agent available and refuse to archive its steps.
- Missing parent: permit idle handling but keep archive and review closing fail-closed.
- Agents holding their own open task: retain current idle protection even if they also hold steps.
Task 1: Distinguish idle handling from archive safety
Files:
- Modify:
backend/src/superTabs/steps.ts - Test:
backend/src/superTabs/tidy.test.ts
Interfaces:
Consumes:
SuperTabState.conversationsand loaded groups held by an agent.Preserves:
checksOpenWork(state, groups, agentId): boolean;taskEndedand all callers retain their signatures.Add
reports a step-only Reviewer idle once its done task sleeps: a legacy role agent assigned only a finished Review step receives one idle row at 25 hours with the parent absent. Loaded done/cancelled controls produce the same row; tidying off does not suppress it.Add configured Reviewer/Tester controls: absent finished parent reaches routine keep handling without a stop.
Add open-parent and missing-parent archive controls; own-task Engineer control remains unchanged.
Commit tests and run
npm --prefix backend test -- src/superTabs/tidy.test.ts; observe absent-parent cases fail because no idle decision occurs.In
checksOpenWork, only consider a parent still open if it is loaded andtaskEndedis false. Explain why idle can infer absence while archive cannot.Run tidy, steps, sweeps, liveness and commands unit tests plus backend typecheck. Full backend and four Super Tab integration shards run in ready PR CI.
Commit production fix, push, record red/green evidence, mark ready and request the independent review through task status (handoff actions follow this commit).